Metlangen Climb

📍
3, Unter der Ruine, Metlangen, Schwäbisch Gmünd, Verwaltungsgemeinschaft Schwäbisch Gmünd, Ostalbkreis, Baden-Württemberg, 73529, Germany

Estimated Climb Time

Loading your rider settings for Metlangen Climb...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Metlangen Climb.

440 m485 m525 m570 m8.1% from 0 m to 4 m10.5% from 4 m to 8 m7.3% from 8 m to 12 m12.1% from 12 m to 15 m8.9% from 15 m to 19 m9.1% from 19 m to 23 m12.1% from 23 m to 26 m8.6% from 26 m to 30 m10.8% from 30 m to 33 m9.5% from 33 m to 37 m7.7% from 37 m to 41 m10.3% from 41 m to 45 m10.3% from 45 m to 49 m10.0% from 49 m to 53 m8.3% from 53 m to 57 m8.1% from 57 m to 60 m8.1% from 60 m to 64 m10.8% from 64 m to 68 m6.7% from 68 m to 72 m7.3% from 72 m to 76 m7.9% from 76 m to 80 m8.5% from 80 m to 85 m4.8% from 85 m to 89 m9.1% from 89 m to 94 m4.3% from 94 m to 98 m5.4% from 98 m to 102 m5.7% from 102 m to 105 m2.9% from 105 m to 109 m5.6% from 109 m to 112 m4.7% from 112 m to 117 m4.5% from 117 m to 121 m4.9% from 121 m to 125 m4.8% from 125 m to 129 m2.6% from 129 m to 133 m5.0% from 133 m to 137 m5.4% from 137 m to 141 m5.3% from 141 m to 145 m2.7% from 145 m to 148 m5.4% from 148 m to 152 m5.3% from 152 m to 156 m4.4% from 156 m to 160 m3.1% from 160 m to 164 m5.0% from 164 m to 168 m4.8% from 168 m to 172 m3.2% from 172 m to 175 m4.7% from 175 m to 179 m4.3% from 179 m to 184 m6.7% from 184 m to 187 m3.3% from 187 m to 190 m6.3% from 190 m to 193 m5.9% from 193 m to 196 m9.1% from 196 m to 200 m6.5% from 200 m to 203 m9.1% from 203 m to 206 m8.8% from 206 m to 209 m5.9% from 209 m to 213 m10.3% from 213 m to 217 m5.7% from 217 m to 220 m9.8% from 220 m to 224 m7.3% from 224 m to 228 m7.3% from 228 m to 233 m9.5% from 233 m to 237 m7.9% from 237 m to 241 m8.1% from 241 m to 244 m9.3% from 244 m to 249 m7.1% from 249 m to 253 m8.1% from 253 m to 256 m11.1% from 256 m to 260 m10.3% from 260 m to 264 m9.8% from 264 m to 268 m12.2% from 268 m to 272 m11.4% from 272 m to 276 m11.1% from 276 m to 279 m13.9% from 279 m to 283 m12.1% from 283 m to 286 m10.5% from 286 m to 290 m12.8% from 290 m to 294 m13.2% from 294 m to 298 m13.2% from 298 m to 301 m13.6% from 301 m to 306 m15.0% from 306 m to 310 m15.4% from 310 m to 314 m14.3% from 314 m to 318 m14.6% from 318 m to 322 m15.4% from 322 m to 326 m17.9% from 326 m to 330 m15.0% from 330 m to 334 m17.1% from 334 m to 338 m17.9% from 338 m to 342 m15.8% from 342 m to 346 m16.7% from 346 m to 349 m13.3% from 349 m to 352 m12.9% from 352 m to 355 m12.5% from 355 m to 359 m13.3% from 359 m to 363 m12.5% from 363 m to 366 m13.3% from 366 m to 369 m11.6% from 369 m to 374 m14.0% from 374 m to 378 m14.6% from 378 m to 382 m12.5% from 382 m to 386 m15.9% from 386 m to 390 m12.9% from 390 m to 393 m15.0% from 393 m to 397 m16.2% from 397 m to 401 m15.6% from 401 m to 404 m15.4% from 404 m to 408 m16.2% from 408 m to 412 m19.4% from 412 m to 415 m15.0% from 415 m to 419 m17.9% from 419 m to 423 m15.4% from 423 m to 427 m18.7% from 427 m to 430 m17.9% from 430 m to 434 m17.6% from 434 m to 437 m17.6% from 437 m to 441 m20.6% from 441 m to 444 m15.8% from 444 m to 448 m10.5% from 448 m to 452 m13.2% from 452 m to 456 m9.1% from 456 m to 459 m5.7% from 459 m to 462 m5.0% from 462 m to 466 m3.2% from 466 m to 469 m10.5% from 469 m to 473 m8.6% from 473 m to 477 m5.4% from 477 m to 480 m10.8% from 480 m to 484 m9.3% from 484 m to 488 m11.4% from 488 m to 492 m14.6% from 492 m to 496 m15.8% from 496 m to 500 m18.4% from 500 m to 504 m17.1% from 504 m to 508 m18.2% from 508 m to 512 m19.5% from 512 m to 516 m17.1% from 516 m to 520 m18.9% from 520 m to 524 m19.5% from 524 m to 528 m20.9% from 528 m to 532 m20.5% from 532 m to 536 m17.1% from 536 m to 540 m18.9% from 540 m to 544 m15.6% from 544 m to 547 m18.2% from 547 m to 551 m17.6% from 551 m to 554 m17.6% from 554 m to 557 m16.7% from 557 m to 560 m17.6% from 560 m to 564 m22.6% from 564 m to 567 m25.7% from 567 m to 570 m23.7% from 570 m to 574 m25.0% from 574 m to 577 m26.7% from 577 m to 580 m25.8% from 580 m to 584 m22.6% from 584 m to 587 m22.9% from 587 m to 590 m24.3% from 590 m to 594 m23.7% from 594 m to 598 m21.1% from 598 m to 601 m25.0% from 601 m to 605 m21.6% from 605 m to 608 m20.0% from 608 m to 612 m24.2% from 612 m to 615 m21.2% from 615 m to 618 m21.9% from 618 m to 622 m23.5% from 622 m to 625 m23.3% from 625 m to 628 m22.6% from 628 m to 631 m21.9% from 631 m to 634 m24.4% from 634 m to 638 m23.5% from 638 m to 642 m21.2% from 642 m to 645 m23.5% from 645 m to 649 m25.0% from 649 m to 653 m20.6% from 653 m to 656 m22.9% from 656 m to 659 m25.8% from 659 m to 663 m34.4% from 663 m to 666 m27.3% from 666 m to 669 m29.7% from 669 m to 673 m29.4% from 673 m to 676 m26.3% from 676 m to 680 m28.6% from 680 m to 683 m30.3% from 683 m to 687 m31.3% from 687 m to 690 m27.0% from 690 m to 694 m27.8% from 694 m to 697 m28.9% from 697 m to 701 m24.2% from 701 m to 704 m21.6% from 704 m to 708 m20.0% from 708 m to 712 m21.1% from 712 m to 715 m27.0% from 715 m to 719 m20.6% from 719 m to 722 m23.3% from 722 m to 725 m26.3% from 725 m to 729 m26.5% from 729 m to 733 m16.7% from 733 m to 736 m23.1% from 736 m to 740 m23.7% from 740 m to 743 m16.7% from 743 m to 747 m12.1% from 747 m to 750 m13.2% from 750 m to 754 m16.7% from 754 m to 757 m12.2% from 757 m to 761 m-7.5% from 761 m to 765 m-10.8% from 765 m to 769 m-12.9% from 769 m to 772 m-12.9% from 772 m to 775 m-18.2% from 775 m to 778 m-16.7% from 778 m to 781 m-11.1% from 781 m to 785 m-10.5% from 785 m to 789 m-5.7% from 789 m to 792 m-2.7% from 792 m to 796 m-2.9% from 796 m to 799 m-4.9% from 799 m to 803 m0.0% from 803 m to 807 m3.3% from 807 m to 810 m-2.2% from 810 m to 814 m6.2% from 814 m to 818 m4.4% from 818 m to 822 m2.3% from 822 m to 827 m-3.1% from 827 m to 830 m-11.8% from 830 m to 833 m0.0% from 833 m to 837 m9.1% from 837 m to 840 m12.9% from 840 m to 843 m6.5% from 843 m to 846 m7.3% from 846 m to 850 m6.7% from 850 m to 853 m5.9% from 853 m to 857 m7.3% from 857 m to 861 m14.6% from 861 m to 865 m12.5% from 865 m to 869 m10.3% from 869 m to 873 m11.1% from 873 m to 878 m14.3% from 878 m to 882 m12.5% from 882 m to 886 m15.4% from 886 m to 889 m14.7% from 889 m to 893 m16.7% from 893 m to 898 m13.6% from 898 m to 902 m15.8% from 902 m to 906 m16.2% from 906 m to 910 m16.2% from 910 m to 913 m12.1% from 913 m to 917 m14.3% from 917 m to 921 m11.4% from 921 m to 925 m12.9% from 925 m to 928 m12.8% from 928 m to 932 m12.5% from 932 m to 935 m15.4% from 935 m to 939 m11.4% from 939 m to 943 m9.3% from 943 m to 947 m9.5% from 947 m to 951 m10.3% from 951 m to 955 m7.0% from 955 m to 959 m8.3% from 959 m to 963 m2.5% from 963 m to 967 m2.6% from 967 m to 971 m0.0% from 971 m to 974 m2.1% from 974 m to 979 m2.9% from 979 m to 982 m-3.1% from 982 m to 985 m2.7% from 985 m to 989 m0.0% from 989 m to 993 m0.0% from 993 m to 998 m3.0% from 998 m to 1.0 km4.4% from 1.0 km to 1.0 km4.2% from 1.0 km to 1.0 km4.4% from 1.0 km to 1.0 km4.7% from 1.0 km to 1.0 km5.3% from 1.0 km to 1.0 km11.1% from 1.0 km to 1.0 km9.5% from 1.0 km to 1.0 km9.1% from 1.0 km to 1.0 km9.4% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km6.3% from 1.0 km to 1.0 km5.4% from 1.0 km to 1.0 km4.7% from 1.0 km to 1.1 km5.4% from 1.1 km to 1.1 km5.9% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km5.7% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-9.5% from 1.1 km to 1.1 km-9.3% from 1.1 km to 1.1 km-6.7% from 1.1 km to 1.1 km-9.5% from 1.1 km to 1.1 km-7.0% from 1.1 km to 1.1 km-4.9% from 1.1 km to 1.1 km-7.3% from 1.1 km to 1.1 km7%13%23%5%2%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.14 km / 0.71 miles
Elevation gain129.3 m / 424 ft
Average gradient10.8%
Maximum gradient30.1%
Elevation high566 m / 1,857 ft
Elevation low440.8 m / 1,446 ft
Climb difficulty score12,343.32

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
od strumyka
Schwäbisch Gmünd, Ostalbkreis
1.13 km10.6%121 m
Kaltes Feld Ostseite
Schwäbisch Gmünd, Ostalbkreis
1.1 km12.1%133 m
Unter der Ruine
Schwäbisch Gmünd, Ostalbkreis
1.07 km11.8%126 m
Weiler kurzer Climb
Schwäbisch Gmünd, Ostalbkreis
1.22 km9.7%118 m
Klostersteige-Solarfeld
Schwäbisch Gmünd, Ostalbkreis
1.04 km10.4%108 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 437,738th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 25,013th most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 6,765th out of 40,169 cycling climbs in Baden-Württemberg.

Ranks 141st out of 1,215 cycling climbs in Ostalbkreis.

Ranking 32nd out of 204 cycling climbs in Schwäbisch Gmünd.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb