auf gehts zum AbfahrtsKOM

📍
L 513, Assamstadt, Verwaltungsgemeinschaft Bad Mergentheim, Main-Tauber-Kreis, Baden-Württemberg, 97959, Germany
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for auf gehts zum AbfahrtsKOM...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of auf gehts zum AbfahrtsKOM.

330 m340 m355 m365 m-2.3% from 0 m to 4 m-4.0% from 4 m to 9 m-3.8% from 9 m to 15 m-5.2% from 15 m to 20 m-1.6% from 20 m to 27 m-5.4% from 27 m to 34 m-8.2% from 34 m to 43 m4.5% from 43 m to 49 m3.2% from 49 m to 55 m5.3% from 55 m to 63 m1.8% from 63 m to 69 m1.6% from 69 m to 75 m1.8% from 75 m to 80 m4.5% from 80 m to 87 m1.5% from 87 m to 94 m0.0% from 94 m to 100 m0.0% from 100 m to 106 m0.0% from 106 m to 111 m0.0% from 111 m to 117 m-1.7% from 117 m to 122 m0.0% from 122 m to 129 m-1.7% from 129 m to 134 m-1.6% from 134 m to 141 m-1.8% from 141 m to 147 m0.0% from 147 m to 152 m0.0% from 152 m to 158 m0.0% from 158 m to 164 m1.6% from 164 m to 170 m0.0% from 170 m to 175 m3.8% from 175 m to 180 m4.9% from 180 m to 186 m3.2% from 186 m to 192 m3.2% from 192 m to 198 m5.7% from 198 m to 204 m2.0% from 204 m to 209 m4.9% from 209 m to 215 m5.5% from 215 m to 220 m3.8% from 220 m to 226 m4.8% from 226 m to 232 m3.5% from 232 m to 238 m5.4% from 238 m to 243 m3.3% from 243 m to 249 m3.7% from 249 m to 255 m4.7% from 255 m to 261 m1.8% from 261 m to 267 m3.0% from 267 m to 273 m1.6% from 273 m to 279 m1.5% from 279 m to 286 m3.1% from 286 m to 293 m1.7% from 293 m to 298 m9.7% from 298 m to 305 m10.6% from 305 m to 311 m6.6% from 311 m to 317 m9.5% from 317 m to 324 m6.5% from 324 m to 330 m5.3% from 330 m to 335 m5.8% from 335 m to 341 m0.0% from 341 m to 347 m3.1% from 347 m to 353 m-1.7% from 353 m to 359 m2.9% from 359 m to 366 m0.0% from 366 m to 373 m0.0% from 373 m to 378 m-3.4% from 378 m to 384 m1.6% from 384 m to 390 m-3.3% from 390 m to 396 m-5.1% from 396 m to 402 m-4.9% from 402 m to 408 m-8.6% from 408 m to 415 m-6.6% from 415 m to 421 m-3.2% from 421 m to 427 m-2.0% from 427 m to 432 m-1.4% from 432 m to 440 m1.7% from 440 m to 446 m-2.1% from 446 m to 450 m3.7% from 450 m to 456 m-2.0% from 456 m to 461 m5.3% from 461 m to 467 m0.0% from 467 m to 472 m1.9% from 472 m to 478 m3.3% from 478 m to 484 m3.5% from 484 m to 489 m0.0% from 489 m to 495 m6.3% from 495 m to 503 m-3.6% from 503 m to 509 m3.4% from 509 m to 515 m6.8% from 515 m to 519 m9.7% from 519 m to 525 m12.3% from 525 m to 531 m6.8% from 531 m to 535 m12.9% from 535 m to 542 m9.8% from 542 m to 548 m9.2% from 548 m to 554 m10.3% from 554 m to 561 m10.0% from 561 m to 568 m9.2% from 568 m to 575 m9.4% from 575 m to 581 m8.8% from 581 m to 587 m7.4% from 587 m to 592 m5.4% from 592 m to 598 m1.7% from 598 m to 603 m0.0% from 603 m to 610 m0.0% from 610 m to 615 m4.9% from 615 m to 621 m-1.7% from 621 m to 627 m3.8% from 627 m to 632 m-1.8% from 632 m to 638 m3.4% from 638 m to 644 m0.0% from 644 m to 650 m-1.8% from 650 m to 655 m5.0% from 655 m to 661 m1.9% from 661 m to 667 m5.0% from 667 m to 673 m4.6% from 673 m to 679 m4.6% from 679 m to 686 m0.0% from 686 m to 692 m5.6% from 692 m to 699 m1.6% from 699 m to 705 m0.0% from 705 m to 711 m-1.5% from 711 m to 718 m-1.6% from 718 m to 724 m1.7% from 724 m to 730 m0.0% from 730 m to 737 m-4.4% from 737 m to 744 m1.6% from 744 m to 750 m-1.5% from 750 m to 756 m-6.5% from 756 m to 763 m-4.8% from 763 m to 769 m-1.5% from 769 m to 776 m0.0% from 776 m to 782 m-6.2% from 782 m to 789 m-3.1% from 789 m to 795 m1.5% from 795 m to 802 m0.0% from 802 m to 808 m0.0% from 808 m to 814 m-4.9% from 814 m to 820 m-3.3% from 820 m to 826 m0.0% from 826 m to 832 m-7.8% from 832 m to 837 m0.0% from 837 m to 844 m0.0% from 844 m to 849 m1.6% from 849 m to 855 m2.9% from 855 m to 862 m4.4% from 862 m to 869 m1.8% from 869 m to 874 m0.0% from 874 m to 880 m0.0% from 880 m to 887 m2.9% from 887 m to 894 m1.4% from 894 m to 901 m-3.2% from 901 m to 907 m-4.8% from 907 m to 914 m-4.5% from 914 m to 920 m-6.2% from 920 m to 927 m-5.5% from 927 m to 934 m-7.5% from 934 m to 941 m-7.4% from 941 m to 948 m-2.9% from 948 m to 954 m-2.9% from 954 m to 961 m0.0% from 961 m to 967 m3.2% from 967 m to 973 m3.0% from 973 m to 980 m-1.4% from 980 m to 987 m6.0% from 987 m to 993 m3.3% from 993 m to 999 m6.7% from 999 m to 1.0 km13.8% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km3.3% from 1.0 km to 1.0 km11.1% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km9.4% from 1.0 km to 1.0 km9.1% from 1.0 km to 1.0 km13.6% from 1.0 km to 1.1 km12.5% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km9.2% from 1.1 km to 1.1 km12.7% from 1.1 km to 1.1 km9.9% from 1.1 km to 1.1 km9.7% from 1.1 km to 1.1 km7.8% from 1.1 km to 1.1 km10.4% from 1.1 km to 1.1 km10.2% from 1.1 km to 1.1 km10.6% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.1 km9.4% from 1.1 km to 1.2 km10.6% from 1.2 km to 1.2 km11.9% from 1.2 km to 1.2 km7.8% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km-1.7% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.3 km-1.7% from 1.3 km to 1.3 km-5.9% from 1.3 km to 1.3 km-5.7% from 1.3 km to 1.3 km-1.7% from 1.3 km to 1.3 km-3.5% from 1.3 km to 1.3 km-4.9% from 1.3 km to 1.3 km-6.6% from 1.3 km to 1.3 km-3.8% from 1.3 km to 1.3 km-3.6% from 1.3 km to 1.3 km-1.8% from 1.3 km to 1.3 km-10.0% from 1.3 km to 1.3 km-1.9% from 1.3 km to 1.3 km-10.5% from 1.3 km to 1.3 km6.7% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.4 km5.8% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km9.0% from 1.4 km to 1.4 km3.3% from 1.4 km to 1.4 km7.1% from 1.4 km to 1.4 km1.2% from 1.4 km to 1.4 km-3.1% from 1.4 km to 1.4 km1.9% from 1.4 km to 1.4 km-5.2% from 1.4 km to 1.4 km-6.9% from 1.4 km to 1.4 km1%2%4%-1%6%-1%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.42 km / 0.88 miles
Elevation gain27.1 m / 89 ft
Average gradient1.9%
Maximum gradient11.2%
Elevation high363.9 m / 1,194 ft
Elevation low332.8 m / 1,092 ft
Climb difficulty score2,709.14

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Von Assamstadt am Steinbock vorbei!
Assamstadt, Main-Tauber-Kreis
1.6 km2.1%34 m
Col de Assamstadt
Assamstadt, Main-Tauber-Kreis
1.81 km1.7%31 m
higher and Higher
Assamstadt, Main-Tauber-Kreis
1.01 km2.2%22 m
Ausgang Assamstadt
Assamstadt, Main-Tauber-Kreis
1.2 km2.8%34 m
Assamstadt-Windischbuch-climb2
Assamstadt, Main-Tauber-Kreis
0.73 km4%29 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,622,568th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 124,041st most difficult cycling climb of all 206,545 climbs in Germany.

📉

Places 27,592nd out of 40,169 cycling climbs in Baden-Württemberg.

Ranks 383rd out of 491 cycling climbs in Main-Tauber-Kreis.

🏵️

A local climb of note, this is the 9th most difficult cycling climb (out of 11 climbs) in Assamstadt.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb