montée Croix Chardonneau Le Guineau

📍
Route de la Loire, La Tronière du Guineau, La Chapelle-Basse-Mer, Divatte-sur-Loire, Nantes, Loire-Atlantique, Pays de la Loire, Metropolitan France, 44450, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for montée Croix Chardonneau Le Guineau...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of montée Croix Chardonneau Le Guineau.

0 m15 m30 m45 m0.0% from 0 m to 7 m-5.1% from 7 m to 11 m0.0% from 11 m to 14 m0.0% from 14 m to 18 m-3.9% from 18 m to 26 m0.0% from 26 m to 33 m-1.6% from 33 m to 40 m-3.1% from 40 m to 46 m0.0% from 46 m to 53 m0.0% from 53 m to 60 m-3.3% from 60 m to 66 m-1.6% from 66 m to 72 m-1.1% from 72 m to 81 m-1.1% from 81 m to 90 m-1.2% from 90 m to 99 m0.0% from 99 m to 107 m0.0% from 107 m to 114 m1.4% from 114 m to 122 m1.1% from 122 m to 131 m1.1% from 131 m to 141 m0.0% from 141 m to 150 m4.8% from 150 m to 158 m1.2% from 158 m to 166 m0.9% from 166 m to 177 m0.0% from 177 m to 186 m5.7% from 186 m to 195 m1.1% from 195 m to 204 m2.3% from 204 m to 213 m0.0% from 213 m to 222 m3.5% from 222 m to 230 m0.0% from 230 m to 239 m0.0% from 239 m to 246 m0.0% from 246 m to 254 m2.5% from 254 m to 262 m1.3% from 262 m to 270 m3.8% from 270 m to 278 m0.0% from 278 m to 286 m6.9% from 286 m to 293 m1.4% from 293 m to 301 m4.1% from 301 m to 308 m0.0% from 308 m to 315 m1.3% from 315 m to 323 m1.4% from 323 m to 330 m1.4% from 330 m to 337 m0.0% from 337 m to 344 m0.0% from 344 m to 351 m6.2% from 351 m to 357 m1.6% from 357 m to 363 m5.6% from 363 m to 371 m1.4% from 371 m to 378 m6.5% from 378 m to 384 m1.6% from 384 m to 390 m3.7% from 390 m to 396 m0.0% from 396 m to 401 m7.7% from 401 m to 406 m1.9% from 406 m to 411 m0.0% from 411 m to 416 m10.5% from 416 m to 422 m0.0% from 422 m to 428 m2.2% from 428 m to 432 m10.2% from 432 m to 437 m2.0% from 437 m to 442 m3.8% from 442 m to 447 m0.0% from 447 m to 453 m10.4% from 453 m to 458 m2.1% from 458 m to 463 m0.0% from 463 m to 467 m12.5% from 467 m to 471 m0.0% from 471 m to 476 m12.5% from 476 m to 481 m0.0% from 481 m to 486 m17.3% from 486 m to 491 m3.8% from 491 m to 496 m13.0% from 496 m to 501 m7.4% from 501 m to 506 m11.4% from 506 m to 510 m0.0% from 510 m to 516 m13.3% from 516 m to 522 m1.7% from 522 m to 528 m3.7% from 528 m to 533 m4.6% from 533 m to 540 m1.6% from 540 m to 546 m2.1% from 546 m to 551 m0.0% from 551 m to 555 m5.8% from 555 m to 560 m0.0% from 560 m to 566 m8.3% from 566 m to 570 m0.0% from 570 m to 575 m0.0% from 575 m to 580 m6.0% from 580 m to 585 m0.0% from 585 m to 590 m5.0% from 590 m to 596 m1.7% from 596 m to 602 m0.0% from 602 m to 607 m-7.3% from 607 m to 613 m-1.8% from 613 m to 618 m0.0% from 618 m to 623 m-12.2% from 623 m to 630 m-1.4% from 630 m to 637 m-6.3% from 637 m to 644 m0.0% from 644 m to 650 m0.0% from 650 m to 656 m0.0% from 656 m to 663 m1.9% from 663 m to 668 m0.0% from 668 m to 673 m0.0% from 673 m to 678 m0.7% from 678 m to 692 m0.0% from 692 m to 699 m0.0% from 699 m to 705 m1.8% from 705 m to 711 m0.0% from 711 m to 716 m0.0% from 716 m to 723 m1.5% from 723 m to 730 m0.0% from 730 m to 736 m0.0% from 736 m to 742 m0.0% from 742 m to 745 m0.0% from 745 m to 747 m0.0% from 747 m to 759 m2.0% from 759 m to 764 m0.0% from 764 m to 769 m0.0% from 769 m to 772 m0.0% from 772 m to 776 m0.0% from 776 m to 779 m2.1% from 779 m to 783 m0.0% from 783 m to 788 m1.1% from 788 m to 797 m0.0% from 797 m to 802 m4.9% from 802 m to 806 m0.0% from 806 m to 810 m3.0% from 810 m to 813 m0.0% from 813 m to 818 m2.4% from 818 m to 822 m2.4% from 822 m to 826 m0.0% from 826 m to 831 m4.3% from 831 m to 835 m2.1% from 835 m to 840 m2.2% from 840 m to 844 m3.7% from 844 m to 850 m0.0% from 850 m to 855 m4.8% from 855 m to 859 m2.4% from 859 m to 863 m0.0% from 863 m to 868 m3.6% from 868 m to 873 m0.0% from 873 m to 879 m0.0% from 879 m to 881 m4.3% from 881 m to 883 m4.3% from 883 m to 885 m10.8% from 885 m to 889 m0.0% from 889 m to 901 m4.8% from 901 m to 903 m7.4% from 903 m to 906 m3.8% from 906 m to 908 m0.0% from 908 m to 915 m5.3% from 915 m to 919 m0.0% from 919 m to 923 m0.0% from 923 m to 926 m8.3% from 926 m to 930 m0.0% from 930 m to 934 m5.3% from 934 m to 937 m2.4% from 937 m to 942 m0.0% from 942 m to 945 m7.7% from 945 m to 949 m2.6% from 949 m to 953 m2.5% from 953 m to 957 m0.0% from 957 m to 962 m8.3% from 962 m to 970 m0.0% from 970 m to 979 m9.1% from 979 m to 981 m0.0% from 981 m to 983 m10.3% from 983 m to 986 m0.0% from 986 m to 994 m5.1% from 994 m to 998 m17.9% from 998 m to 1.0 km0.0% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km5.3% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km5.6% from 1.0 km to 1.0 km11.1% from 1.0 km to 1.0 km5.6% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.0 km4.5% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km8.3% from 1.0 km to 1.1 km2.1% from 1.1 km to 1.1 km9.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km9.3% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km10.5% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km10.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km8.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km9.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km13.0% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km13.2% from 1.1 km to 1.2 km3.8% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.3 km1.5% from 1.3 km to 1.3 km7.7% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.7% from 1.3 km to 1.3 km8.3% from 1.3 km to 1.3 km2.9% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km7.8% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km5.9% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km2.2% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km12.5% from 1.3 km to 1.3 km1.2% from 1.3 km to 1.3 km4.6% from 1.3 km to 1.4 km1.2% from 1.4 km to 1.4 km2.7% from 1.4 km to 1.4 km4.3% from 1.4 km to 1.4 km4.3% from 1.4 km to 1.4 km6.4% from 1.4 km to 1.4 km1.9% from 1.4 km to 1.4 km10.9% from 1.4 km to 1.4 km3.7% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km5.0% from 1.4 km to 1.4 km10.7% from 1.4 km to 1.4 km3.6% from 1.4 km to 1.4 km5.0% from 1.4 km to 1.4 km1.3% from 1.4 km to 1.4 km4.3% from 1.4 km to 1.4 km2.6% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km8.8% from 1.4 km to 1.5 km0.0% from 1.5 km to 1.5 km1.6% from 1.5 km to 1.5 km2.2% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km10.0% from 1.5 km to 1.5 km4.8% from 1.5 km to 1.5 km10.0% from 1.5 km to 1.5 km0.8% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km5.9% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km7.0% from 1.5 km to 1.5 km2.3% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km7.1% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km5.6% from 1.5 km to 1.5 km1.4% from 1.5 km to 1.6 km1.3% from 1.6 km to 1.6 km4.1% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km12.0% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km6.3% from 1.6 km to 1.6 km1.6% from 1.6 km to 1.6 km3.8% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km3.0% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km2.9% from 1.6 km to 1.6 km2.9% from 1.6 km to 1.6 km2.9% from 1.6 km to 1.6 km1.9% from 1.6 km to 1.6 km0.0% from 1.6 km to 1.6 km0%4%1%2%3%4%2%0 m250 m500 m750 m1 km1.3 km1.5 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.64 km / 1.02 miles
Elevation gain37.6 m / 123 ft
Average gradient2.3%
Maximum gradient10.3%
Elevation high43 m / 141 ft
Elevation low4 m / 13 ft
Climb difficulty score3,764.76

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Route du Loroux
Divatte-sur-Loire, Loire-Atlantique
1.81 km1.8%37 m
Montée Chapelle entier
Divatte-sur-Loire, Loire-Atlantique
1.6 km3%48 m
Montée Le Bordage Long
Divatte-sur-Loire, Loire-Atlantique
1.24 km2.3%29 m
Cote du Moulin des Bregeonnes
Divatte-sur-Loire, Loire-Atlantique
1.29 km2.9%37 m
Chapelle-Basse-Mer (sud)
Divatte-sur-Loire, Loire-Atlantique
1.15 km3%35 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,336,556th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 176,527th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 2,884th out of 14,737 cycling climbs in Pays de la Loire.

Ranks 400th out of 4,295 cycling climbs in Loire-Atlantique.

Ranking 13th out of 48 cycling climbs in Divatte-sur-Loire.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb