côte les courses

📍
D 6E, La Croix Laneau, Beyssenac, Brive-la-Gaillarde, Corrèze, Nouvelle-Aquitaine, Metropolitan France, 19230, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for côte les courses...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of côte les courses.

330 m350 m370 m390 m1.4% from 0 m to 7 m1.3% from 7 m to 15 m1.3% from 15 m to 22 m1.3% from 22 m to 30 m2.5% from 30 m to 38 m1.3% from 38 m to 46 m2.5% from 46 m to 54 m1.3% from 54 m to 62 m2.8% from 62 m to 69 m1.4% from 69 m to 76 m1.5% from 76 m to 83 m0.0% from 83 m to 90 m-1.6% from 90 m to 96 m-1.6% from 96 m to 102 m-3.3% from 102 m to 108 m-3.5% from 108 m to 114 m-1.8% from 114 m to 119 m-1.8% from 119 m to 125 m0.0% from 125 m to 130 m0.0% from 130 m to 135 m0.0% from 135 m to 140 m0.0% from 140 m to 145 m2.0% from 145 m to 150 m0.0% from 150 m to 155 m0.0% from 155 m to 160 m1.7% from 160 m to 166 m1.7% from 166 m to 172 m1.6% from 172 m to 178 m0.0% from 178 m to 184 m7.7% from 184 m to 191 m6.3% from 191 m to 197 m7.7% from 197 m to 203 m6.5% from 203 m to 210 m6.3% from 210 m to 216 m4.7% from 216 m to 222 m5.8% from 222 m to 229 m4.3% from 229 m to 236 m4.4% from 236 m to 243 m3.0% from 243 m to 249 m4.5% from 249 m to 256 m1.4% from 256 m to 263 m3.0% from 263 m to 270 m1.5% from 270 m to 276 m0.0% from 276 m to 283 m0.0% from 283 m to 289 m-1.5% from 289 m to 296 m-1.5% from 296 m to 303 m1.5% from 303 m to 309 m-1.6% from 309 m to 316 m-1.5% from 316 m to 322 m-1.4% from 322 m to 329 m4.3% from 329 m to 336 m4.3% from 336 m to 343 m6.0% from 343 m to 350 m7.6% from 350 m to 356 m9.7% from 356 m to 362 m8.8% from 362 m to 368 m6.5% from 368 m to 374 m6.3% from 374 m to 381 m7.8% from 381 m to 387 m5.2% from 387 m to 393 m5.7% from 393 m to 398 m6.7% from 398 m to 403 m4.2% from 403 m to 407 m6.2% from 407 m to 411 m5.1% from 411 m to 415 m7.3% from 415 m to 419 m4.8% from 419 m to 423 m7.1% from 423 m to 427 m5.6% from 427 m to 431 m2.6% from 431 m to 434 m5.6% from 434 m to 438 m5.6% from 438 m to 442 m5.0% from 442 m to 446 m3.0% from 446 m to 449 m2.0% from 449 m to 454 m3.8% from 454 m to 459 m3.6% from 459 m to 465 m5.2% from 465 m to 471 m3.2% from 471 m to 477 m3.0% from 477 m to 484 m2.6% from 484 m to 487 m2.5% from 487 m to 491 m5.3% from 491 m to 495 m1.9% from 495 m to 500 m4.3% from 500 m to 505 m2.2% from 505 m to 510 m2.3% from 510 m to 514 m7.3% from 514 m to 518 m5.1% from 518 m to 522 m8.6% from 522 m to 526 m5.3% from 526 m to 529 m7.9% from 529 m to 536 m5.9% from 536 m to 539 m6.1% from 539 m to 542 m7.1% from 542 m to 547 m4.9% from 547 m to 551 m6.5% from 551 m to 555 m4.1% from 555 m to 560 m4.2% from 560 m to 565 m6.4% from 565 m to 570 m4.7% from 570 m to 574 m2.5% from 574 m to 578 m5.3% from 578 m to 582 m5.1% from 582 m to 586 m5.1% from 586 m to 590 m2.8% from 590 m to 593 m3.1% from 593 m to 596 m6.2% from 596 m to 600 m3.0% from 600 m to 603 m2.7% from 603 m to 607 m3.0% from 607 m to 610 m5.6% from 610 m to 613 m2.6% from 613 m to 617 m3.0% from 617 m to 621 m2.4% from 621 m to 625 m2.4% from 625 m to 629 m5.4% from 629 m to 633 m3.0% from 633 m to 636 m2.9% from 636 m to 639 m2.9% from 639 m to 643 m5.3% from 643 m to 647 m5.3% from 647 m to 650 m7.5% from 650 m to 654 m5.1% from 654 m to 658 m5.4% from 658 m to 662 m7.3% from 662 m to 666 m5.1% from 666 m to 670 m5.1% from 670 m to 674 m7.7% from 674 m to 678 m5.4% from 678 m to 682 m5.7% from 682 m to 685 m5.7% from 685 m to 689 m5.3% from 689 m to 692 m5.7% from 692 m to 696 m7.9% from 696 m to 700 m5.7% from 700 m to 703 m5.7% from 703 m to 707 m5.4% from 707 m to 710 m5.7% from 710 m to 714 m5.6% from 714 m to 717 m5.7% from 717 m to 721 m8.1% from 721 m to 725 m5.4% from 725 m to 728 m5.4% from 728 m to 732 m7.3% from 732 m to 736 m5.1% from 736 m to 740 m4.9% from 740 m to 744 m5.7% from 744 m to 748 m5.4% from 748 m to 751 m5.6% from 751 m to 755 m5.7% from 755 m to 758 m6.1% from 758 m to 762 m5.4% from 762 m to 765 m5.6% from 765 m to 769 m5.7% from 769 m to 773 m5.6% from 773 m to 776 m5.3% from 776 m to 780 m5.3% from 780 m to 784 m7.9% from 784 m to 788 m5.6% from 788 m to 791 m5.6% from 791 m to 795 m6.7% from 795 m to 798 m5.7% from 798 m to 801 m5.6% from 801 m to 805 m5.6% from 805 m to 808 m5.7% from 808 m to 812 m5.9% from 812 m to 815 m5.6% from 815 m to 819 m6.1% from 819 m to 822 m6.7% from 822 m to 825 m6.2% from 825 m to 828 m6.1% from 828 m to 832 m9.1% from 832 m to 835 m6.1% from 835 m to 838 m5.9% from 838 m to 842 m8.6% from 842 m to 845 m5.3% from 845 m to 849 m8.6% from 849 m to 853 m7.7% from 853 m to 856 m5.7% from 856 m to 860 m8.3% from 860 m to 864 m5.6% from 864 m to 867 m8.3% from 867 m to 871 m8.1% from 871 m to 874 m5.4% from 874 m to 878 m7.9% from 878 m to 882 m7.7% from 882 m to 886 m7.5% from 886 m to 890 m7.7% from 890 m to 894 m7.7% from 894 m to 898 m7.7% from 898 m to 902 m8.1% from 902 m to 905 m7.3% from 905 m to 909 m7.9% from 909 m to 913 m7.5% from 913 m to 917 m7.5% from 917 m to 921 m5.1% from 921 m to 925 m8.1% from 925 m to 929 m7.9% from 929 m to 933 m5.1% from 933 m to 936 m7.7% from 936 m to 940 m5.4% from 940 m to 944 m9.1% from 944 m to 947 m5.4% from 947 m to 951 m7.9% from 951 m to 955 m5.7% from 955 m to 958 m4.9% from 958 m to 962 m8.1% from 962 m to 966 m5.4% from 966 m to 970 m5.9% from 970 m to 973 m5.7% from 973 m to 977 m5.7% from 977 m to 980 m5.9% from 980 m to 984 m6.2% from 984 m to 987 m6.1% from 987 m to 990 m5.9% from 990 m to 994 m6.1% from 994 m to 997 m3.1% from 997 m to 1 km6.5% from 1 km to 1.0 km3.3% from 1.0 km to 1.0 km8.3% from 1.0 km to 1.0 km3.1% from 1.0 km to 1.0 km6.7% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km3.1% from 1.0 km to 1.0 km6.3% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km6.1% from 1.0 km to 1.0 km7.7% from 1.0 km to 1.0 km5.4% from 1.0 km to 1.0 km7.1% from 1.0 km to 1.0 km5.0% from 1.0 km to 1.1 km4.9% from 1.1 km to 1.1 km8.1% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km4.8% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km7.7% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km-2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-2.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.2 km2.8% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km2.7% from 1.2 km to 1.2 km2.6% from 1.2 km to 1.2 km2.5% from 1.2 km to 1.2 km2.4% from 1.2 km to 1.2 km2.6% from 1.2 km to 1.2 km4.5% from 1.2 km to 1.2 km4.5% from 1.2 km to 1.2 km3.9% from 1.2 km to 1.2 km3.5% from 1.2 km to 1.2 km5.3% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.2 km5.6% from 1.2 km to 1.2 km7.1% from 1.2 km to 1.2 km5.8% from 1.2 km to 1.2 km7.5% from 1.2 km to 1.2 km5.7% from 1.2 km to 1.2 km5.6% from 1.2 km to 1.2 km5.7% from 1.2 km to 1.2 km5.7% from 1.2 km to 1.3 km3.8% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km4.0% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km2.2% from 1.3 km to 1.3 km2.2% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km4.3% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km-4.7% from 1.3 km to 1.3 km2%4%5%7%4%2%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.32 km / 0.82 miles
Elevation gain55.3 m / 181 ft
Average gradient4.2%
Maximum gradient8.1%
Elevation high385.5 m / 1,265 ft
Elevation low330.2 m / 1,083 ft
Climb difficulty score5,556.18

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Sortie Beyssenac
Beyssenac, Corrèze
0.75 km3.8%29 m
Rentrer via D9
Beyssenac, Corrèze
1.16 km1.3%15 m
Sortie Lamandrie
Beyssenac, Corrèze
2.01 km1.5%31 m
Le haut Ségur
Beyssenac, Corrèze
1.28 km0.5%6 m
sprint d'arrivée
Beyssenac, Corrèze
0.36 km3.6%17 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,015,820th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 130,130th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 9,880th out of 32,901 cycling climbs in Nouvelle-Aquitaine.

Ranks 1,121st out of 2,078 cycling climbs in Corrèze.

🥇

This is the most difficult cycling climb in Beyssenac.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb