Chemin de la cavée et briqueterie (VTT)

📍
Chemin de la Cavée, Oissel, Rouen, Seine-Maritime, Normandy, Metropolitan France, 76350, France
Uncategorised

Estimated Climb Time

Loading your rider settings for Chemin de la cavée et briqueterie (VTT)...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Chemin de la cavée et briqueterie (VTT).

20 m30 m40 m50 m0.0% from 0 m to 4 m-2.4% from 4 m to 9 m0.0% from 9 m to 14 m0.0% from 14 m to 19 m-1.4% from 19 m to 26 m0.0% from 26 m to 30 m-2.3% from 30 m to 35 m0.0% from 35 m to 39 m0.0% from 39 m to 43 m2.2% from 43 m to 47 m2.3% from 47 m to 52 m4.8% from 52 m to 56 m2.3% from 56 m to 60 m4.5% from 60 m to 65 m4.3% from 65 m to 69 m2.3% from 69 m to 74 m4.5% from 74 m to 78 m4.4% from 78 m to 83 m2.2% from 83 m to 87 m4.5% from 87 m to 92 m4.5% from 92 m to 96 m4.7% from 96 m to 100 m4.4% from 100 m to 105 m2.3% from 105 m to 109 m5.4% from 109 m to 113 m5.6% from 113 m to 116 m2.4% from 116 m to 121 m4.4% from 121 m to 125 m4.4% from 125 m to 130 m6.8% from 130 m to 134 m2.4% from 134 m to 138 m4.8% from 138 m to 142 m4.8% from 142 m to 146 m7.0% from 146 m to 151 m2.6% from 151 m to 155 m5.7% from 155 m to 158 m4.8% from 158 m to 162 m4.4% from 162 m to 167 m6.8% from 167 m to 171 m4.5% from 171 m to 176 m6.8% from 176 m to 180 m4.4% from 180 m to 185 m6.7% from 185 m to 189 m4.7% from 189 m to 193 m7.1% from 193 m to 198 m4.9% from 198 m to 202 m7.5% from 202 m to 206 m5.0% from 206 m to 210 m4.9% from 210 m to 214 m7.5% from 214 m to 218 m5.4% from 218 m to 221 m5.9% from 221 m to 225 m5.7% from 225 m to 228 m5.6% from 228 m to 232 m5.4% from 232 m to 236 m5.7% from 236 m to 239 m5.4% from 239 m to 243 m5.4% from 243 m to 247 m5.9% from 247 m to 250 m2.6% from 250 m to 254 m4.9% from 254 m to 258 m2.5% from 258 m to 262 m2.5% from 262 m to 266 m5.4% from 266 m to 270 m2.7% from 270 m to 273 m5.0% from 273 m to 277 m2.8% from 277 m to 281 m2.9% from 281 m to 284 m2.9% from 284 m to 288 m3.1% from 288 m to 291 m0.0% from 291 m to 294 m-2.7% from 294 m to 298 m-5.0% from 298 m to 302 m-2.5% from 302 m to 306 m-2.4% from 306 m to 310 m-2.5% from 310 m to 314 m-2.3% from 314 m to 318 m-4.3% from 318 m to 323 m-2.1% from 323 m to 328 m-2.0% from 328 m to 333 m0.0% from 333 m to 338 m-1.4% from 338 m to 345 m-3.7% from 345 m to 350 m-1.9% from 350 m to 355 m-2.2% from 355 m to 360 m0.0% from 360 m to 365 m-1.8% from 365 m to 371 m-3.4% from 371 m to 376 m-1.7% from 376 m to 382 m-1.8% from 382 m to 388 m-3.4% from 388 m to 394 m-3.6% from 394 m to 400 m-3.1% from 400 m to 406 m-4.2% from 406 m to 413 m-3.1% from 413 m to 420 m-3.6% from 420 m to 425 m-3.2% from 425 m to 431 m-5.3% from 431 m to 437 m-3.4% from 437 m to 443 m-3.4% from 443 m to 449 m-1.5% from 449 m to 455 m-4.3% from 455 m to 460 m-2.0% from 460 m to 465 m-3.2% from 465 m to 471 m-1.8% from 471 m to 477 m-3.5% from 477 m to 483 m-3.5% from 483 m to 488 m-1.7% from 488 m to 494 m-3.6% from 494 m to 500 m-1.8% from 500 m to 505 m-3.3% from 505 m to 511 m-3.2% from 511 m to 517 m-3.3% from 517 m to 524 m-1.6% from 524 m to 530 m-1.6% from 530 m to 536 m-3.8% from 536 m to 541 m-1.9% from 541 m to 546 m-1.6% from 546 m to 552 m-1.7% from 552 m to 558 m-3.1% from 558 m to 565 m-1.7% from 565 m to 571 m-1.7% from 571 m to 577 m-3.6% from 577 m to 582 m-3.3% from 582 m to 588 m-3.5% from 588 m to 594 m-3.8% from 594 m to 599 m-3.6% from 599 m to 605 m-3.0% from 605 m to 612 m-3.7% from 612 m to 617 m-4.9% from 617 m to 623 m-4.9% from 623 m to 627 m-2.1% from 627 m to 632 m-2.3% from 632 m to 636 m3.3% from 636 m to 639 m2.8% from 639 m to 643 m6.5% from 643 m to 646 m2.8% from 646 m to 650 m4.7% from 650 m to 654 m4.3% from 654 m to 659 m4.7% from 659 m to 663 m4.7% from 663 m to 667 m4.3% from 667 m to 672 m4.3% from 672 m to 677 m4.5% from 677 m to 681 m2.3% from 681 m to 685 m4.9% from 685 m to 689 m4.7% from 689 m to 694 m2.2% from 694 m to 698 m4.1% from 698 m to 703 m2.3% from 703 m to 707 m4.9% from 707 m to 712 m4.3% from 712 m to 716 m2.1% from 716 m to 721 m4.7% from 721 m to 725 m2.4% from 725 m to 729 m2.4% from 729 m to 733 m2.4% from 733 m to 737 m4.7% from 737 m to 742 m2.2% from 742 m to 746 m2.3% from 746 m to 751 m4.7% from 751 m to 755 m2.5% from 755 m to 759 m5.4% from 759 m to 763 m5.6% from 763 m to 766 m7.9% from 766 m to 770 m4.9% from 770 m to 774 m5.3% from 774 m to 778 m5.6% from 778 m to 782 m5.3% from 782 m to 785 m7.0% from 785 m to 790 m4.8% from 790 m to 794 m4.7% from 794 m to 798 m4.5% from 798 m to 803 m4.7% from 803 m to 807 m5.0% from 807 m to 811 m5.0% from 811 m to 815 m2.6% from 815 m to 819 m5.0% from 819 m to 823 m4.7% from 823 m to 827 m2.3% from 827 m to 831 m4.7% from 831 m to 836 m4.8% from 836 m to 840 m2.4% from 840 m to 844 m2.4% from 844 m to 848 m2.4% from 848 m to 852 m2.4% from 852 m to 857 m2.5% from 857 m to 861 m5.0% from 861 m to 865 m2.6% from 865 m to 868 m2.7% from 868 m to 872 m2.7% from 872 m to 876 m2.6% from 876 m to 880 m2.6% from 880 m to 883 m5.1% from 883 m to 887 m5.4% from 887 m to 891 m8.1% from 891 m to 895 m5.4% from 895 m to 898 m5.3% from 898 m to 902 m8.1% from 902 m to 906 m5.3% from 906 m to 910 m8.1% from 910 m to 913 m7.7% from 913 m to 917 m5.1% from 917 m to 921 m7.7% from 921 m to 925 m7.7% from 925 m to 929 m7.3% from 929 m to 933 m12.5% from 933 m to 937 m10.0% from 937 m to 941 m12.5% from 941 m to 945 m9.8% from 945 m to 949 m12.2% from 949 m to 953 m10.0% from 953 m to 957 m12.5% from 957 m to 961 m10.3% from 961 m to 965 m10.5% from 965 m to 969 m12.5% from 969 m to 973 m9.8% from 973 m to 977 m13.2% from 977 m to 981 m10.0% from 981 m to 985 m11.9% from 985 m to 989 m9.8% from 989 m to 993 m12.2% from 993 m to 997 m10.0% from 997 m to 1.0 km12.5% from 1.0 km to 1.0 km9.8% from 1.0 km to 1.0 km10.8% from 1.0 km to 1.0 km10.5% from 1.0 km to 1.0 km10.5% from 1.0 km to 1.0 km10.8% from 1.0 km to 1.0 km8.3% from 1.0 km to 1.0 km11.4% from 1.0 km to 1.0 km8.6% from 1.0 km to 1.0 km9.1% from 1.0 km to 1.0 km6.2% from 1.0 km to 1.0 km6.5% from 1.0 km to 1.0 km5.5% from 1.0 km to 1.1 km1.9% from 1.1 km to 1.1 km-3.1% from 1.1 km to 1.1 km-2.9% from 1.1 km to 1.1 km-5.4% from 1.1 km to 1.1 km-5.3% from 1.1 km to 1.1 km-7.9% from 1.1 km to 1.1 km4%-2%0%7%5%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.07 km / 0.67 miles
Elevation gain25.7 m / 84 ft
Average gradient2.4%
Maximum gradient11.5%
Elevation high48 m / 157 ft
Elevation low21.1 m / 69 ft
Climb difficulty score2,565.19

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
D13 Route des Essarts climb
Oissel, Seine-Maritime
1.23 km2.5%31 m
Single derrière Ecole de Police
Oissel, Seine-Maritime
1.41 km1.8%26 m
Single du Ventru au GR
Oissel, Seine-Maritime
1.08 km4.1%45 m
Slalom entre les pins 2ème côté
Oissel, Seine-Maritime
0.63 km2.8%18 m
Strade bianche del Rouvray
Oissel, Seine-Maritime
0.62 km2.2%14 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,669,964th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 223,861st most difficult cycling climb of all 342,105 climbs in France.

📉

Places 11,671st out of 19,501 cycling climbs in Normandy.

Ranks 2,869th out of 4,711 cycling climbs in Seine-Maritime.

Ranking 27th out of 56 cycling climbs in Oissel.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb