Montée Palaiseau vers passerelle A10

📍
Avenue du 1er Mai, ZA Les Glaises, Palaiseau, Essonne, Ile-de-France, Metropolitan France, 91120, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Montée Palaiseau vers passerelle A10...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Montée Palaiseau vers passerelle A10.

55 m70 m80 m95 m-1.9% from 0 m to 5 m0.0% from 5 m to 11 m0.0% from 11 m to 16 m0.0% from 16 m to 20 m2.2% from 20 m to 25 m4.2% from 25 m to 29 m2.8% from 29 m to 33 m2.9% from 33 m to 36 m5.4% from 36 m to 40 m7.1% from 40 m to 44 m8.9% from 44 m to 49 m7.9% from 49 m to 53 m7.9% from 53 m to 56 m8.0% from 56 m to 61 m4.4% from 61 m to 66 m4.7% from 66 m to 70 m6.1% from 70 m to 75 m5.9% from 75 m to 82 m6.1% from 82 m to 87 m6.2% from 87 m to 92 m6.7% from 92 m to 98 m5.8% from 98 m to 103 m7.1% from 103 m to 108 m4.7% from 108 m to 115 m5.6% from 115 m to 120 m3.8% from 120 m to 126 m3.7% from 126 m to 131 m4.3% from 131 m to 136 m4.2% from 136 m to 140 m5.5% from 140 m to 146 m5.7% from 146 m to 151 m3.8% from 151 m to 156 m5.5% from 156 m to 162 m5.2% from 162 m to 168 m3.6% from 168 m to 173 m5.4% from 173 m to 179 m5.3% from 179 m to 185 m4.3% from 185 m to 189 m7.1% from 189 m to 194 m4.0% from 194 m to 199 m3.6% from 199 m to 204 m1.8% from 204 m to 210 m1.8% from 210 m to 215 m1.9% from 215 m to 221 m0.0% from 221 m to 226 m0.0% from 226 m to 232 m10.4% from 232 m to 238 m3.1% from 238 m to 245 m5.3% from 245 m to 251 m3.3% from 251 m to 257 m6.7% from 257 m to 263 m3.6% from 263 m to 268 m5.0% from 268 m to 272 m3.8% from 272 m to 277 m3.5% from 277 m to 283 m3.6% from 283 m to 289 m4.1% from 289 m to 293 m2.0% from 293 m to 298 m3.8% from 298 m to 304 m3.6% from 304 m to 309 m5.7% from 309 m to 315 m3.8% from 315 m to 320 m6.5% from 320 m to 324 m4.8% from 324 m to 329 m5.8% from 329 m to 334 m4.2% from 334 m to 339 m8.7% from 339 m to 343 m4.7% from 343 m to 348 m6.4% from 348 m to 352 m3.8% from 352 m to 358 m3.4% from 358 m to 363 m1.9% from 363 m to 369 m3.9% from 369 m to 374 m3.6% from 374 m to 379 m1.5% from 379 m to 386 m3.3% from 386 m to 392 m3.6% from 392 m to 398 m3.7% from 398 m to 403 m3.5% from 403 m to 409 m3.3% from 409 m to 415 m1.5% from 415 m to 421 m3.5% from 421 m to 427 m2.0% from 427 m to 432 m1.6% from 432 m to 438 m1.7% from 438 m to 444 m1.9% from 444 m to 450 m1.9% from 450 m to 455 m2.4% from 455 m to 459 m0.0% from 459 m to 463 m2.3% from 463 m to 467 m2.1% from 467 m to 472 m3.9% from 472 m to 477 m2.3% from 477 m to 481 m6.1% from 481 m to 486 m4.3% from 486 m to 491 m2.3% from 491 m to 495 m4.7% from 495 m to 500 m2.4% from 500 m to 504 m4.0% from 504 m to 509 m12.5% from 509 m to 514 m5.9% from 514 m to 520 m3.9% from 520 m to 528 m5.0% from 528 m to 534 m3.2% from 534 m to 540 m4.1% from 540 m to 545 m1.7% from 545 m to 551 m3.5% from 551 m to 557 m3.6% from 557 m to 562 m1.9% from 562 m to 567 m0.0% from 567 m to 572 m2.2% from 572 m to 577 m4.8% from 577 m to 581 m2.5% from 581 m to 585 m5.7% from 585 m to 589 m5.6% from 589 m to 592 m2.2% from 592 m to 597 m4.0% from 597 m to 602 m5.7% from 602 m to 607 m3.8% from 607 m to 612 m4.0% from 612 m to 617 m4.4% from 617 m to 622 m3.8% from 622 m to 627 m4.0% from 627 m to 632 m2.1% from 632 m to 637 m1.9% from 637 m to 642 m2.6% from 642 m to 646 m3.1% from 646 m to 649 m4.9% from 649 m to 653 m5.1% from 653 m to 659 m0.0% from 659 m to 667 m1.8% from 667 m to 672 m0.0% from 672 m to 678 m-1.8% from 678 m to 683 m0.0% from 683 m to 688 m0.0% from 688 m to 694 m-1.7% from 694 m to 700 m-1.8% from 700 m to 706 m-1.5% from 706 m to 712 m-3.4% from 712 m to 718 m-3.1% from 718 m to 724 m-1.5% from 724 m to 731 m-1.5% from 731 m to 738 m-1.6% from 738 m to 744 m-1.6% from 744 m to 750 m0.0% from 750 m to 756 m0.0% from 756 m to 762 m-1.4% from 762 m to 769 m0.0% from 769 m to 776 m0.0% from 776 m to 782 m0.0% from 782 m to 788 m1.6% from 788 m to 794 m1.6% from 794 m to 801 m1.8% from 801 m to 807 m0.0% from 807 m to 812 m1.8% from 812 m to 817 m0.0% from 817 m to 823 m0.0% from 823 m to 829 m1.8% from 829 m to 835 m-1.6% from 835 m to 841 m0.0% from 841 m to 847 m0.0% from 847 m to 853 m-1.6% from 853 m to 860 m0.0% from 860 m to 866 m0.0% from 866 m to 872 m0.0% from 872 m to 878 m0.0% from 878 m to 885 m-1.6% from 885 m to 891 m0.0% from 891 m to 897 m0.0% from 897 m to 903 m1.5% from 903 m to 909 m1.6% from 909 m to 916 m1.8% from 916 m to 921 m1.9% from 921 m to 927 m1.9% from 927 m to 932 m2.2% from 932 m to 936 m1.9% from 936 m to 942 m2.1% from 942 m to 946 m4.3% from 946 m to 951 m2.2% from 951 m to 956 m4.0% from 956 m to 961 m5.5% from 961 m to 966 m0.0% from 966 m to 970 m2.0% from 970 m to 975 m2.2% from 975 m to 979 m2.3% from 979 m to 984 m2.8% from 984 m to 987 m2.0% from 987 m to 992 m1.9% from 992 m to 998 m2.0% from 998 m to 1.0 km0.0% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.0 km3.3% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km4.4% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km3.6% from 1.0 km to 1.0 km3.6% from 1.0 km to 1.0 km4.0% from 1.0 km to 1.0 km6.4% from 1.0 km to 1.1 km3.6% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km6.3% from 1.1 km to 1.1 km5.8% from 1.1 km to 1.1 km7.5% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km7.3% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km6.7% from 1.1 km to 1.1 km6.8% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km3.9% from 1.1 km to 1.2 km5.7% from 1.2 km to 1.2 km5.7% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km6.9% from 1.2 km to 1.2 km10.0% from 1.2 km to 1.2 km-2.2% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km4%4%2%1%4%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.21 km / 0.75 miles
Elevation gain36.3 m / 119 ft
Average gradient3%
Maximum gradient8.2%
Elevation high93.3 m / 306 ft
Elevation low56.8 m / 186 ft
Climb difficulty score3,628.07

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Montée Palaiseau Hugo/Brady/Paris/gde Ceinture
Palaiseau, Essonne
1.21 km3.3%40 m
M. ch de Villaine à ch de la Motte Samson
Palaiseau, Essonne
1.36 km2.8%38 m
côté avenue 1er mai
Palaiseau, Essonne
1.01 km3.1%31 m
Montée Palaiseau-Massy
Palaiseau, Essonne
1.05 km3.6%38 m
haut de palaiseau vers nord
Palaiseau, Essonne
1.4 km3.3%47 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,368,277th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 181,192nd most difficult cycling climb of all 342,105 climbs in France.

📉

Places 7,056th out of 20,922 cycling climbs in Ile-de-France.

Ranks 1,244th out of 3,385 cycling climbs in Essonne.

Ranking 26th out of 71 cycling climbs in Palaiseau.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb