Single speed 2

📍
Double Borne, Chemin rural, Ernolsheim-lès-Saverne, Saverne, Bas-Rhin, Grand Est, Metropolitan France, 67330, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Single speed 2...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Single speed 2.

285 m305 m320 m340 m-2.9% from 0 m to 3 m-2.8% from 3 m to 7 m3.3% from 7 m to 10 m12.5% from 10 m to 13 m4.7% from 13 m to 18 m12.1% from 18 m to 21 m5.7% from 21 m to 24 m21.2% from 24 m to 28 m18.8% from 28 m to 31 m11.8% from 31 m to 34 m21.7% from 34 m to 37 m9.1% from 37 m to 40 m14.3% from 40 m to 43 m13.9% from 43 m to 47 m7.9% from 47 m to 51 m8.3% from 51 m to 54 m13.9% from 54 m to 58 m12.1% from 58 m to 61 m10.5% from 61 m to 65 m15.4% from 65 m to 69 m6.5% from 69 m to 74 m2.4% from 74 m to 78 m4.8% from 78 m to 82 m5.1% from 82 m to 86 m7.1% from 86 m to 90 m2.1% from 90 m to 95 m4.3% from 95 m to 99 m0.0% from 99 m to 103 m8.8% from 103 m to 107 m0.0% from 107 m to 110 m2.1% from 110 m to 115 m10.5% from 115 m to 119 m3.7% from 119 m to 121 m5.6% from 121 m to 125 m4.8% from 125 m to 129 m2.3% from 129 m to 134 m-6.8% from 134 m to 138 m7.1% from 138 m to 141 m-2.5% from 141 m to 145 m-2.4% from 145 m to 149 m-4.7% from 149 m to 153 m0.0% from 153 m to 157 m-5.3% from 157 m to 161 m-4.8% from 161 m to 165 m-2.9% from 165 m to 169 m5.3% from 169 m to 172 m2.6% from 172 m to 176 m-10.3% from 176 m to 180 m2.9% from 180 m to 184 m3.3% from 184 m to 187 m-2.6% from 187 m to 190 m-2.4% from 190 m to 195 m-2.3% from 195 m to 199 m14.7% from 199 m to 202 m14.3% from 202 m to 206 m4.8% from 206 m to 211 m2.5% from 211 m to 215 m-11.1% from 215 m to 219 m4.8% from 219 m to 223 m14.3% from 223 m to 227 m8.9% from 227 m to 231 m0.0% from 231 m to 235 m7.9% from 235 m to 239 m2.5% from 239 m to 243 m0.0% from 243 m to 247 m7.5% from 247 m to 251 m7.7% from 251 m to 255 m7.5% from 255 m to 259 m8.1% from 259 m to 262 m20.5% from 262 m to 266 m5.1% from 266 m to 270 m-6.3% from 270 m to 273 m5.3% from 273 m to 277 m7.5% from 277 m to 281 m4.5% from 281 m to 285 m5.3% from 285 m to 289 m-2.5% from 289 m to 293 m2.3% from 293 m to 298 m7.5% from 298 m to 302 m7.9% from 302 m to 305 m7.0% from 305 m to 310 m20.6% from 310 m to 313 m2.3% from 313 m to 317 m-9.4% from 317 m to 321 m2.4% from 321 m to 325 m11.8% from 325 m to 328 m0.0% from 328 m to 331 m3.8% from 331 m to 334 m1.9% from 334 m to 339 m5.0% from 339 m to 343 m0.0% from 343 m to 348 m-9.1% from 348 m to 352 m-4.9% from 352 m to 356 m2.4% from 356 m to 360 m-25.8% from 360 m to 364 m-7.1% from 364 m to 368 m10.3% from 368 m to 372 m-2.2% from 372 m to 376 m-2.4% from 376 m to 380 m11.1% from 380 m to 385 m0.0% from 385 m to 389 m14.3% from 389 m to 394 m17.8% from 394 m to 398 m25.0% from 398 m to 402 m17.1% from 402 m to 405 m10.3% from 405 m to 409 m33.3% from 409 m to 413 m8.9% from 413 m to 417 m9.3% from 417 m to 423 m3.9% from 423 m to 428 m17.8% from 428 m to 432 m13.5% from 432 m to 436 m7.7% from 436 m to 440 m13.3% from 440 m to 444 m4.1% from 444 m to 449 m2.0% from 449 m to 454 m-1.9% from 454 m to 459 m0.0% from 459 m to 465 m2.1% from 465 m to 469 m-4.4% from 469 m to 474 m-6.1% from 474 m to 479 m-13.0% from 479 m to 484 m-12.2% from 484 m to 489 m2.2% from 489 m to 494 m13.6% from 494 m to 498 m0.0% from 498 m to 503 m-5.9% from 503 m to 508 m6.3% from 508 m to 513 m0.0% from 513 m to 518 m0.0% from 518 m to 523 m-3.8% from 523 m to 528 m-5.5% from 528 m to 534 m-3.8% from 534 m to 539 m-6.3% from 539 m to 544 m-3.9% from 544 m to 549 m-7.8% from 549 m to 554 m-8.8% from 554 m to 560 m6.1% from 560 m to 565 m4.0% from 565 m to 570 m7.8% from 570 m to 575 m3.9% from 575 m to 580 m6.0% from 580 m to 585 m4.0% from 585 m to 590 m2.2% from 590 m to 594 m5.9% from 594 m to 600 m4.2% from 600 m to 604 m6.0% from 604 m to 609 m12.0% from 609 m to 614 m8.3% from 614 m to 619 m10.6% from 619 m to 624 m9.6% from 624 m to 629 m6.0% from 629 m to 634 m2.3% from 634 m to 638 m0.0% from 638 m to 643 m0.0% from 643 m to 647 m2.0% from 647 m to 652 m0.0% from 652 m to 658 m2.0% from 658 m to 663 m4.2% from 663 m to 668 m1.9% from 668 m to 673 m5.9% from 673 m to 678 m7.5% from 678 m to 682 m4.2% from 682 m to 687 m2.3% from 687 m to 691 m2.1% from 691 m to 696 m6.3% from 696 m to 701 m8.3% from 701 m to 706 m7.0% from 706 m to 710 m6.7% from 710 m to 714 m6.5% from 714 m to 719 m7.7% from 719 m to 724 m8.3% from 724 m to 729 m6.3% from 729 m to 734 m7.3% from 734 m to 738 m1.9% from 738 m to 743 m9.1% from 743 m to 748 m4.5% from 748 m to 752 m2.1% from 752 m to 757 m2.3% from 757 m to 761 m2.1% from 761 m to 766 m0.0% from 766 m to 771 m2.1% from 771 m to 776 m4.3% from 776 m to 780 m2.4% from 780 m to 784 m0.0% from 784 m to 788 m-4.1% from 788 m to 793 m2.5% from 793 m to 797 m2.6% from 797 m to 801 m2.9% from 801 m to 805 m0.0% from 805 m to 809 m-2.4% from 809 m to 813 m0.0% from 813 m to 817 m2.8% from 817 m to 821 m4.2% from 821 m to 823 m0.0% from 823 m to 827 m-4.8% from 827 m to 831 m-4.4% from 831 m to 835 m0.0% from 835 m to 839 m-2.2% from 839 m to 844 m-2.6% from 844 m to 848 m0.0% from 848 m to 852 m2.6% from 852 m to 856 m-7.3% from 856 m to 860 m-6.1% from 860 m to 865 m2.0% from 865 m to 870 m-4.1% from 870 m to 875 m-3.8% from 875 m to 880 m-1.9% from 880 m to 886 m2.0% from 886 m to 891 m1.8% from 891 m to 896 m-1.9% from 896 m to 902 m-2.0% from 902 m to 906 m-4.2% from 906 m to 911 m-7.0% from 911 m to 916 m-2.6% from 916 m to 919 m-3.1% from 919 m to 923 m1.9% from 923 m to 928 m0.0% from 928 m to 931 m-2.1% from 931 m to 936 m-1.8% from 936 m to 942 m4.7% from 942 m to 948 m20.0% from 948 m to 954 m21.6% from 954 m to 959 m21.6% from 959 m to 964 m19.0% from 964 m to 970 m19.3% from 970 m to 975 m21.4% from 975 m to 981 m20.3% from 981 m to 987 m18.4% from 987 m to 992 m20.5% from 992 m to 996 m17.6% from 996 m to 1.0 km20.0% from 1.0 km to 1.0 km20.0% from 1.0 km to 1.0 km21.3% from 1.0 km to 1.0 km23.2% from 1.0 km to 1.0 km22.2% from 1.0 km to 1.0 km24.1% from 1.0 km to 1.0 km22.2% from 1.0 km to 1.0 km21.6% from 1.0 km to 1.0 km17.8% from 1.0 km to 1.0 km29.6% from 1.0 km to 1.1 km5%4%3%4%22%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.05 km / 0.65 miles
Elevation gain51.7 m / 170 ft
Average gradient4.9%
Maximum gradient25%
Elevation high337.3 m / 1,107 ft
Elevation low285.4 m / 936 ft
Climb difficulty score5,165.09

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Piste "bleue"
Ernolsheim-lès-Saverne, Bas-Rhin
0.84 km4.5%41 m
Balcon du Frohnberg
Ernolsheim-lès-Saverne, Bas-Rhin
0.73 km5.6%41 m
Mark Vador
Ernolsheim-lès-Saverne, Bas-Rhin
0.72 km8.5%61 m
Traversée d'Erno
Ernolsheim-lès-Saverne, Bas-Rhin
0.58 km4.2%25 m
La remontée de merde!
Ernolsheim-lès-Saverne, Bas-Rhin
0.49 km4.2%21 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,073,038th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 138,353rd most difficult cycling climb of all 342,105 climbs in France.

📉

Places 11,652nd out of 28,725 cycling climbs in Grand Est.

Ranks 1,805th out of 4,565 cycling climbs in Bas-Rhin.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 24 climbs) in Ernolsheim-lès-Saverne.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb