rocade --> village collectivités tri

📍
D 86, Thorigné-Fouillard, Rennes, Ille-et-Vilaine, Brittany, Metropolitan France, 35235, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for rocade --> village collectivités tri...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of rocade --> village collectivités tri.

35 m45 m55 m65 m1.6% from 0 m to 6 m1.5% from 6 m to 13 m3.2% from 13 m to 19 m6.9% from 19 m to 25 m5.7% from 25 m to 30 m3.7% from 30 m to 36 m3.5% from 36 m to 41 m5.4% from 41 m to 47 m3.5% from 47 m to 53 m3.6% from 53 m to 58 m3.7% from 58 m to 64 m3.6% from 64 m to 69 m3.5% from 69 m to 75 m3.4% from 75 m to 81 m3.3% from 81 m to 87 m1.8% from 87 m to 92 m1.8% from 92 m to 98 m1.7% from 98 m to 104 m1.8% from 104 m to 109 m1.7% from 109 m to 115 m1.7% from 115 m to 121 m1.6% from 121 m to 127 m1.6% from 127 m to 133 m1.7% from 133 m to 139 m1.9% from 139 m to 145 m1.8% from 145 m to 150 m0.0% from 150 m to 156 m1.8% from 156 m to 161 m1.8% from 161 m to 167 m0.0% from 167 m to 173 m1.8% from 173 m to 178 m0.0% from 178 m to 184 m1.7% from 184 m to 190 m1.7% from 190 m to 196 m0.0% from 196 m to 202 m1.6% from 202 m to 208 m0.0% from 208 m to 215 m1.5% from 215 m to 221 m0.0% from 221 m to 228 m0.0% from 228 m to 234 m1.4% from 234 m to 241 m0.0% from 241 m to 248 m0.0% from 248 m to 255 m1.4% from 255 m to 262 m0.0% from 262 m to 269 m1.4% from 269 m to 276 m1.4% from 276 m to 283 m1.4% from 283 m to 290 m2.9% from 290 m to 297 m1.5% from 297 m to 304 m1.5% from 304 m to 311 m2.8% from 311 m to 318 m1.4% from 318 m to 325 m2.8% from 325 m to 332 m1.4% from 332 m to 339 m0.0% from 339 m to 346 m1.4% from 346 m to 353 m1.4% from 353 m to 361 m1.4% from 361 m to 368 m0.0% from 368 m to 375 m1.3% from 375 m to 383 m1.3% from 383 m to 391 m1.3% from 391 m to 398 m0.0% from 398 m to 406 m1.4% from 406 m to 413 m1.4% from 413 m to 420 m0.0% from 420 m to 427 m0.0% from 427 m to 434 m3.0% from 434 m to 440 m3.1% from 440 m to 447 m1.6% from 447 m to 453 m3.2% from 453 m to 460 m1.6% from 460 m to 466 m1.7% from 466 m to 472 m3.4% from 472 m to 478 m1.6% from 478 m to 484 m1.7% from 484 m to 490 m3.4% from 490 m to 496 m1.7% from 496 m to 502 m3.4% from 502 m to 508 m1.7% from 508 m to 514 m3.2% from 514 m to 520 m1.6% from 520 m to 526 m3.2% from 526 m to 532 m1.6% from 532 m to 539 m3.2% from 539 m to 545 m1.6% from 545 m to 551 m1.7% from 551 m to 557 m3.6% from 557 m to 562 m1.8% from 562 m to 568 m1.8% from 568 m to 574 m3.4% from 574 m to 579 m1.7% from 579 m to 585 m3.8% from 585 m to 591 m3.3% from 591 m to 597 m1.6% from 597 m to 603 m1.7% from 603 m to 609 m3.4% from 609 m to 615 m1.7% from 615 m to 621 m1.9% from 621 m to 626 m1.9% from 626 m to 631 m2.0% from 631 m to 636 m2.0% from 636 m to 642 m1.9% from 642 m to 647 m2.0% from 647 m to 652 m0.0% from 652 m to 657 m2.0% from 657 m to 662 m2.0% from 662 m to 667 m2.0% from 667 m to 672 m0.0% from 672 m to 677 m2.0% from 677 m to 682 m2.0% from 682 m to 687 m2.0% from 687 m to 692 m2.1% from 692 m to 697 m1.9% from 697 m to 702 m2.0% from 702 m to 707 m2.0% from 707 m to 712 m2.1% from 712 m to 717 m2.1% from 717 m to 722 m2.2% from 722 m to 726 m2.2% from 726 m to 731 m0.0% from 731 m to 736 m4.1% from 736 m to 741 m2.0% from 741 m to 746 m1.9% from 746 m to 751 m1.8% from 751 m to 756 m1.9% from 756 m to 762 m2.0% from 762 m to 767 m2.0% from 767 m to 772 m2.0% from 772 m to 777 m2.0% from 777 m to 782 m2.0% from 782 m to 787 m2.0% from 787 m to 792 m1.9% from 792 m to 797 m2.0% from 797 m to 802 m2.0% from 802 m to 807 m2.1% from 807 m to 812 m2.2% from 812 m to 816 m2.2% from 816 m to 821 m2.0% from 821 m to 826 m2.0% from 826 m to 831 m2.0% from 831 m to 836 m2.0% from 836 m to 841 m1.9% from 841 m to 846 m2.0% from 846 m to 851 m2.0% from 851 m to 856 m1.9% from 856 m to 861 m1.9% from 861 m to 867 m3.8% from 867 m to 872 m1.8% from 872 m to 878 m1.9% from 878 m to 883 m1.9% from 883 m to 888 m1.9% from 888 m to 893 m3.9% from 893 m to 898 m1.9% from 898 m to 904 m2.0% from 904 m to 909 m2.1% from 909 m to 914 m0.0% from 914 m to 919 m2.0% from 919 m to 924 m2.0% from 924 m to 929 m2.0% from 929 m to 934 m1.9% from 934 m to 939 m1.9% from 939 m to 944 m2.0% from 944 m to 949 m2.1% from 949 m to 954 m3.9% from 954 m to 959 m2.1% from 959 m to 964 m0.0% from 964 m to 968 m2.2% from 968 m to 973 m2.2% from 973 m to 977 m2.2% from 977 m to 982 m2.2% from 982 m to 986 m0.0% from 986 m to 991 m2.2% from 991 m to 995 m2.1% from 995 m to 1.0 km2.2% from 1.0 km to 1.0 km2.2% from 1.0 km to 1.0 km4.0% from 1.0 km to 1.0 km2.0% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.0 km3.7% from 1.0 km to 1.0 km2.0% from 1.0 km to 1.0 km4.0% from 1.0 km to 1.0 km2.0% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.1 km4.2% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km1.6% from 1.1 km to 1.2 km0.0% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-1.7% from 1.2 km to 1.2 km-3.5% from 1.2 km to 1.3 km-1.6% from 1.3 km to 1.3 km-3.1% from 1.3 km to 1.3 km-1.5% from 1.3 km to 1.3 km-3.0% from 1.3 km to 1.3 km-2.9% from 1.3 km to 1.3 km-1.5% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km-2.7% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km-1.4% from 1.3 km to 1.3 km-2.7% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.3 km-1.4% from 1.3 km to 1.3 km-2.8% from 1.3 km to 1.4 km-2.9% from 1.4 km to 1.4 km-1.4% from 1.4 km to 1.4 km2%2%2%2%2%-2%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.37 km / 0.85 miles
Elevation gain20.4 m / 67 ft
Average gradient1.5%
Maximum gradient5%
Elevation high63 m / 207 ft
Elevation low39.7 m / 130 ft
Climb difficulty score2,035.04

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Entrée Thorigné
Thorigné-Fouillard, Ille-et-Vilaine
1.27 km1.8%23 m
RP D86- bascule
Thorigné-Fouillard, Ille-et-Vilaine
1.69 km1.5%28 m
abc
Thorigné-Fouillard, Ille-et-Vilaine
1.27 km1.2%15 m
grimpette de tizé
Thorigné-Fouillard, Ille-et-Vilaine
1.01 km1.9%20 m
Pigeon blanc climb
Thorigné-Fouillard, Ille-et-Vilaine
0.96 km1.7%16 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,864,390th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 249,971st most difficult cycling climb of all 342,105 climbs in France.

📉

Places 12,716th out of 21,076 cycling climbs in Brittany.

Ranks 2,401st out of 4,920 cycling climbs in Ille-et-Vilaine.

🏵️

A local climb of note, this is the 8th most difficult cycling climb (out of 27 climbs) in Thorigné-Fouillard.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb