Le pertre la gravelle 1

📍
D 43, La Gabetterie, Le Pertre, Fougères-Vitré, Ille-et-Vilaine, Brittany, Metropolitan France, 35370, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Le pertre la gravelle 1...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Le pertre la gravelle 1.

130 m145 m155 m170 m1.1% from 0 m to 9 m0.0% from 9 m to 18 m1.2% from 18 m to 26 m1.3% from 26 m to 34 m1.3% from 34 m to 42 m2.6% from 42 m to 49 m1.4% from 49 m to 57 m2.7% from 57 m to 64 m4.4% from 64 m to 71 m3.0% from 71 m to 78 m3.2% from 78 m to 84 m3.2% from 84 m to 90 m3.4% from 90 m to 96 m1.9% from 96 m to 101 m3.8% from 101 m to 106 m3.9% from 106 m to 112 m4.0% from 112 m to 117 m5.8% from 117 m to 122 m3.8% from 122 m to 127 m5.6% from 127 m to 132 m5.4% from 132 m to 138 m3.6% from 138 m to 144 m5.2% from 144 m to 149 m5.4% from 149 m to 155 m6.0% from 155 m to 160 m7.7% from 160 m to 165 m5.0% from 165 m to 171 m5.4% from 171 m to 177 m3.8% from 177 m to 182 m3.1% from 182 m to 189 m3.8% from 189 m to 194 m4.5% from 194 m to 198 m6.0% from 198 m to 203 m6.8% from 203 m to 209 m6.3% from 209 m to 214 m5.4% from 214 m to 220 m6.1% from 220 m to 225 m7.5% from 225 m to 229 m5.9% from 229 m to 235 m4.3% from 235 m to 240 m6.0% from 240 m to 245 m4.9% from 245 m to 251 m5.2% from 251 m to 257 m4.4% from 257 m to 261 m4.3% from 261 m to 266 m6.8% from 266 m to 272 m5.6% from 272 m to 277 m5.4% from 277 m to 283 m5.8% from 283 m to 288 m5.9% from 288 m to 293 m5.7% from 293 m to 299 m2.9% from 299 m to 305 m3.7% from 305 m to 311 m4.1% from 311 m to 316 m3.7% from 316 m to 321 m2.4% from 321 m to 325 m3.5% from 325 m to 331 m2.1% from 331 m to 336 m3.9% from 336 m to 341 m5.3% from 341 m to 346 m4.2% from 346 m to 351 m6.5% from 351 m to 356 m4.5% from 356 m to 360 m5.9% from 360 m to 364 m6.5% from 364 m to 368 m7.1% from 368 m to 372 m7.0% from 372 m to 377 m4.7% from 377 m to 381 m4.6% from 381 m to 388 m4.8% from 388 m to 392 m2.3% from 392 m to 396 m2.1% from 396 m to 401 m2.5% from 401 m to 405 m2.3% from 405 m to 409 m2.3% from 409 m to 414 m4.9% from 414 m to 418 m2.1% from 418 m to 422 m3.0% from 422 m to 426 m4.3% from 426 m to 430 m4.3% from 430 m to 435 m3.8% from 435 m to 440 m3.0% from 440 m to 447 m4.4% from 447 m to 451 m1.7% from 451 m to 457 m3.6% from 457 m to 463 m4.3% from 463 m to 467 m1.9% from 467 m to 473 m5.1% from 473 m to 478 m3.7% from 478 m to 484 m3.6% from 484 m to 489 m5.7% from 489 m to 495 m3.8% from 495 m to 500 m6.1% from 500 m to 505 m3.8% from 505 m to 510 m4.9% from 510 m to 514 m4.8% from 514 m to 520 m3.7% from 520 m to 526 m2.0% from 526 m to 531 m4.0% from 531 m to 536 m2.1% from 536 m to 541 m1.7% from 541 m to 547 m3.0% from 547 m to 553 m1.9% from 553 m to 558 m2.2% from 558 m to 563 m1.5% from 563 m to 570 m2.7% from 570 m to 573 m2.9% from 573 m to 580 m2.0% from 580 m to 585 m2.0% from 585 m to 590 m3.3% from 590 m to 596 m2.0% from 596 m to 601 m0.0% from 601 m to 605 m1.9% from 605 m to 611 m1.9% from 611 m to 616 m3.4% from 616 m to 622 m2.0% from 622 m to 627 m1.8% from 627 m to 632 m3.8% from 632 m to 637 m2.0% from 637 m to 642 m1.9% from 642 m to 648 m2.9% from 648 m to 651 m1.8% from 651 m to 657 m2.1% from 657 m to 662 m0.0% from 662 m to 667 m0.0% from 667 m to 672 m1.7% from 672 m to 677 m0.0% from 677 m to 684 m0.0% from 684 m to 689 m-1.9% from 689 m to 694 m0.0% from 694 m to 700 m0.0% from 700 m to 707 m0.0% from 707 m to 713 m0.0% from 713 m to 719 m-1.6% from 719 m to 725 m0.0% from 725 m to 731 m0.0% from 731 m to 738 m0.0% from 738 m to 744 m-1.6% from 744 m to 750 m-1.5% from 750 m to 757 m-3.1% from 757 m to 763 m-3.1% from 763 m to 770 m-3.2% from 770 m to 776 m-4.9% from 776 m to 782 m-4.5% from 782 m to 789 m-4.5% from 789 m to 796 m-4.1% from 796 m to 803 m-3.0% from 803 m to 810 m-2.9% from 810 m to 816 m-1.5% from 816 m to 823 m0.0% from 823 m to 831 m1.4% from 831 m to 838 m2.9% from 838 m to 845 m3.1% from 845 m to 851 m3.6% from 851 m to 860 m3.8% from 860 m to 867 m2.6% from 867 m to 875 m2.5% from 875 m to 883 m1.3% from 883 m to 891 m0.0% from 891 m to 898 m0.0% from 898 m to 905 m0.0% from 905 m to 912 m0.0% from 912 m to 919 m0.0% from 919 m to 926 m0.0% from 926 m to 933 m-1.6% from 933 m to 939 m0.0% from 939 m to 946 m0.0% from 946 m to 952 m1.6% from 952 m to 959 m4.8% from 959 m to 965 m3.3% from 965 m to 971 m3.3% from 971 m to 977 m1.7% from 977 m to 983 m3.4% from 983 m to 989 m3.4% from 989 m to 995 m1.7% from 995 m to 1.0 km1.8% from 1.0 km to 1.0 km3.4% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km3.6% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km3.7% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.2 km3.1% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km2.2% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km2.3% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km2.7% from 1.2 km to 1.3 km2.1% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km2.6% from 1.3 km to 1.3 km4.4% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km4.8% from 1.3 km to 1.3 km2.5% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km2.3% from 1.3 km to 1.3 km2.3% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km3.8% from 1.3 km to 1.3 km1.8% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.4 km0.0% from 1.4 km to 1.4 km1.7% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-2.3% from 1.4 km to 1.4 km4%4%2%0%2%2%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.39 km / 0.86 miles
Elevation gain32.4 m / 106 ft
Average gradient2.3%
Maximum gradient6.7%
Elevation high165.4 m / 543 ft
Elevation low132.9 m / 436 ft
Climb difficulty score3,242.07

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Le pertre monte final par la gravelle
Le Pertre, Ille-et-Vilaine
1.16 km3.3%38 m
Bosse #1 sur D29
Le Pertre, Ille-et-Vilaine
1.08 km3.2%36 m
Le pertre la gravelle 2
Le Pertre, Ille-et-Vilaine
0.96 km3%29 m
Brielles le pertre
Le Pertre, Ille-et-Vilaine
2.7 km2.3%62 m
Bosse #2 sur D29
Le Pertre, Ille-et-Vilaine
0.8 km3.3%26 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,466,238th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 195,168th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 7,864th out of 21,076 cycling climbs in Brittany.

Ranks 1,203rd out of 4,920 cycling climbs in Ille-et-Vilaine.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 16 climbs) in Le Pertre.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb