Côte sortie Saint Fargeau

📍
1 bis, Route de Bonny, Les Ferriers, Saint-Fargeau, Auxerre, Yonne, Bourgogne – Franche-Comté, Metropolitan France, 89170, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Côte sortie Saint Fargeau...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Côte sortie Saint Fargeau.

200 m210 m225 m235 m5.1% from 0 m to 8 m4.4% from 8 m to 17 m7.7% from 17 m to 24 m7.7% from 24 m to 31 m6.3% from 31 m to 39 m6.4% from 39 m to 47 m5.6% from 47 m to 54 m7.0% from 54 m to 61 m1.4% from 61 m to 68 m1.5% from 68 m to 75 m0.0% from 75 m to 82 m1.4% from 82 m to 89 m1.3% from 89 m to 97 m3.1% from 97 m to 103 m3.9% from 103 m to 111 m5.0% from 111 m to 117 m4.4% from 117 m to 123 m3.4% from 123 m to 132 m2.7% from 132 m to 140 m1.2% from 140 m to 148 m1.4% from 148 m to 155 m1.5% from 155 m to 162 m0.0% from 162 m to 168 m2.4% from 168 m to 176 m5.1% from 176 m to 184 m5.1% from 184 m to 192 m5.6% from 192 m to 197 m3.3% from 197 m to 203 m3.7% from 203 m to 211 m3.2% from 211 m to 218 m1.7% from 218 m to 223 m1.6% from 223 m to 230 m4.2% from 230 m to 237 m6.5% from 237 m to 244 m5.9% from 244 m to 251 m4.1% from 251 m to 258 m-1.6% from 258 m to 265 m-6.5% from 265 m to 271 m-6.3% from 271 m to 277 m-5.1% from 277 m to 285 m-5.1% from 285 m to 291 m-3.0% from 291 m to 298 m-5.1% from 298 m to 303 m-4.5% from 303 m to 310 m-3.9% from 310 m to 318 m-5.1% from 318 m to 324 m3.0% from 324 m to 330 m4.0% from 330 m to 338 m2.7% from 338 m to 345 m4.5% from 345 m to 352 m3.6% from 352 m to 360 m3.2% from 360 m to 366 m4.3% from 366 m to 373 m3.6% from 373 m to 382 m3.0% from 382 m to 388 m3.3% from 388 m to 394 m3.2% from 394 m to 401 m3.7% from 401 m to 406 m3.4% from 406 m to 412 m5.2% from 412 m to 418 m3.5% from 418 m to 423 m2.8% from 423 m to 431 m4.5% from 431 m to 437 m5.6% from 437 m to 444 m6.3% from 444 m to 451 m3.6% from 451 m to 456 m1.7% from 456 m to 462 m2.9% from 462 m to 469 m3.6% from 469 m to 475 m2.7% from 475 m to 482 m2.7% from 482 m to 489 m1.7% from 489 m to 495 m3.2% from 495 m to 501 m2.0% from 501 m to 506 m2.7% from 506 m to 514 m2.9% from 514 m to 520 m2.8% from 520 m to 528 m3.1% from 528 m to 534 m1.6% from 534 m to 540 m1.6% from 540 m to 547 m3.3% from 547 m to 553 m0.0% from 553 m to 558 m-2.0% from 558 m to 563 m0.0% from 563 m to 567 m2.3% from 567 m to 576 m4.0% from 576 m to 583 m1.6% from 583 m to 590 m7.3% from 590 m to 595 m5.4% from 595 m to 601 m3.3% from 601 m to 607 m1.5% from 607 m to 614 m1.7% from 614 m to 620 m2.7% from 620 m to 627 m3.2% from 627 m to 634 m1.8% from 634 m to 639 m2.8% from 639 m to 646 m1.8% from 646 m to 652 m3.0% from 652 m to 659 m2.0% from 659 m to 664 m2.9% from 664 m to 670 m3.5% from 670 m to 676 m1.7% from 676 m to 682 m1.9% from 682 m to 688 m3.4% from 688 m to 693 m2.1% from 693 m to 698 m2.0% from 698 m to 703 m3.3% from 703 m to 709 m1.6% from 709 m to 715 m3.6% from 715 m to 721 m1.6% from 721 m to 727 m4.8% from 727 m to 731 m4.7% from 731 m to 736 m3.1% from 736 m to 742 m2.0% from 742 m to 747 m3.5% from 747 m to 753 m2.9% from 753 m to 760 m2.0% from 760 m to 765 m3.9% from 765 m to 770 m1.9% from 770 m to 775 m3.8% from 775 m to 781 m1.8% from 781 m to 786 m3.2% from 786 m to 792 m1.8% from 792 m to 798 m3.3% from 798 m to 804 m2.4% from 804 m to 808 m3.7% from 808 m to 814 m3.1% from 814 m to 820 m1.6% from 820 m to 826 m3.4% from 826 m to 832 m3.1% from 832 m to 839 m1.6% from 839 m to 845 m3.1% from 845 m to 852 m3.6% from 852 m to 857 m1.7% from 857 m to 863 m1.7% from 863 m to 869 m3.5% from 869 m to 875 m1.4% from 875 m to 882 m3.2% from 882 m to 888 m2.3% from 888 m to 892 m2.0% from 892 m to 897 m1.5% from 897 m to 904 m3.1% from 904 m to 910 m2.3% from 910 m to 919 m1.7% from 919 m to 925 m1.9% from 925 m to 930 m3.0% from 930 m to 937 m1.5% from 937 m to 943 m3.3% from 943 m to 949 m3.3% from 949 m to 955 m4.3% from 955 m to 960 m3.4% from 960 m to 966 m3.8% from 966 m to 971 m1.6% from 971 m to 977 m1.7% from 977 m to 983 m0.0% from 983 m to 988 m2.3% from 988 m to 992 m3.0% from 992 m to 996 m1.6% from 996 m to 1.0 km2.2% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km1.6% from 1.0 km to 1.0 km1.6% from 1.0 km to 1.0 km2.1% from 1.0 km to 1.0 km1.4% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.0 km1.7% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km1.6% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.5% from 1.1 km to 1.1 km1.3% from 1.1 km to 1.1 km1.3% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km2.8% from 1.1 km to 1.1 km1.5% from 1.1 km to 1.1 km1.5% from 1.1 km to 1.1 km1.4% from 1.1 km to 1.1 km1.6% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.2 km1.5% from 1.2 km to 1.2 km1.3% from 1.2 km to 1.2 km1.3% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.3 km1.6% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km1.4% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km1.4% from 1.3 km to 1.3 km1.3% from 1.3 km to 1.3 km1.2% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km1.4% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.4 km1.7% from 1.4 km to 1.4 km1.1% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.3% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.1% from 1.4 km to 1.4 km2.2% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.7% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.9% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.4% from 1.4 km to 1.4 km1.5% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.5 km1.7% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km1.4% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km1.5% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km2.0% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.6 km4%1%3%3%1%1%0 m250 m500 m750 m1 km1.3 km1.5 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.56 km / 0.97 miles
Elevation gain32.2 m / 106 ft
Average gradient2.1%
Maximum gradient7%
Elevation high233.4 m / 766 ft
Elevation low201.2 m / 660 ft
Climb difficulty score3,223.4

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
colo aux grilles
Saint-Fargeau, Yonne
1.21 km2.7%40 m
La Ferme !
Saint-Fargeau, Yonne
1.92 km2.6%49 m
à Saint-Fargeau
Saint-Fargeau, Yonne
0.81 km2.8%25 m
Sortie St Far vers St Amand
Saint-Fargeau, Yonne
0.56 km3.2%18 m
Le Pont
Saint-Fargeau, Yonne
0.37 km1.6%6 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,471,077th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 195,832nd most difficult cycling climb of all 342,105 climbs in France.

📉

Places 12,663rd out of 21,205 cycling climbs in Bourgogne – Franche-Comté.

Ranks 1,433rd out of 2,349 cycling climbs in Yonne.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 10 climbs) in Saint-Fargeau.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb