En Arbussin Climb

📍
Le Martoret, Igé, Mâcon, Saône-et-Loire, Bourgogne – Franche-Comté, Metropolitan France, 71960, France
Cat. 4

Estimated Climb Time

Loading your rider settings for En Arbussin Climb...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of En Arbussin Climb.

230 m265 m305 m340 m4.4% from 0 m to 5 m16.7% from 5 m to 7 m14.0% from 7 m to 11 m15.8% from 11 m to 15 m10.5% from 15 m to 19 m11.4% from 19 m to 22 m17.6% from 22 m to 26 m15.4% from 26 m to 30 m10.3% from 30 m to 34 m5.6% from 34 m to 37 m21.1% from 37 m to 39 m20.0% from 39 m to 41 m10.0% from 41 m to 43 m10.5% from 43 m to 47 m12.1% from 47 m to 50 m21.4% from 50 m to 53 m18.7% from 53 m to 56 m14.6% from 56 m to 60 m9.1% from 60 m to 65 m14.3% from 65 m to 69 m15.0% from 69 m to 73 m16.2% from 73 m to 77 m16.2% from 77 m to 80 m22.9% from 80 m to 84 m15.0% from 84 m to 88 m19.0% from 88 m to 90 m15.7% from 90 m to 95 m14.6% from 95 m to 99 m10.3% from 99 m to 103 m24.2% from 103 m to 106 m18.2% from 106 m to 108 m21.1% from 108 m to 110 m16.2% from 110 m to 114 m11.1% from 114 m to 116 m36.4% from 116 m to 117 m23.5% from 117 m to 120 m3.8% from 120 m to 126 m16.0% from 126 m to 131 m14.0% from 131 m to 135 m21.6% from 135 m to 139 m3.6% from 139 m to 144 m12.5% from 144 m to 152 m12.5% from 152 m to 155 m14.3% from 155 m to 158 m3.8% from 158 m to 163 m16.7% from 163 m to 168 m18.2% from 168 m to 170 m10.7% from 170 m to 176 m7.0% from 176 m to 182 m20.4% from 182 m to 187 m4.9% from 187 m to 191 m23.3% from 191 m to 195 m9.8% from 195 m to 199 m17.6% from 199 m to 203 m23.5% from 203 m to 206 m15.4% from 206 m to 210 m10.3% from 210 m to 214 m16.7% from 214 m to 216 m13.3% from 216 m to 221 m28.6% from 221 m to 222 m12.5% from 222 m to 224 m12.1% from 224 m to 227 m21.1% from 227 m to 229 m29.6% from 229 m to 232 m13.3% from 232 m to 233 m25.0% from 233 m to 235 m11.4% from 235 m to 238 m10.0% from 238 m to 242 m19.0% from 242 m to 244 m6.9% from 244 m to 247 m34.5% from 247 m to 250 m11.8% from 250 m to 253 m10.5% from 253 m to 255 m28.6% from 255 m to 257 m13.3% from 257 m to 258 m22.2% from 258 m to 260 m8.7% from 260 m to 262 m9.1% from 262 m to 265 m17.1% from 265 m to 268 m28.6% from 268 m to 269 m17.1% from 269 m to 273 m4.9% from 273 m to 277 m19.0% from 277 m to 281 m16.7% from 281 m to 284 m20.0% from 284 m to 285 m23.1% from 285 m to 287 m18.2% from 287 m to 291 m10.3% from 291 m to 294 m7.7% from 294 m to 297 m28.6% from 297 m to 299 m9.5% from 299 m to 303 m20.0% from 303 m to 305 m11.1% from 305 m to 307 m21.1% from 307 m to 309 m6.7% from 309 m to 312 m32.3% from 312 m to 315 m6.5% from 315 m to 318 m11.8% from 318 m to 322 m13.1% from 322 m to 328 m16.2% from 328 m to 331 m13.8% from 331 m to 334 m21.4% from 334 m to 337 m13.0% from 337 m to 342 m15.0% from 342 m to 346 m14.6% from 346 m to 350 m0.0% from 350 m to 352 m13.3% from 352 m to 353 m36.4% from 353 m to 354 m120.0% from 354 m to 355 m75.0% from 355 m to 356 m22.2% from 356 m to 357 m28.6% from 357 m to 359 m8.9% from 359 m to 363 m14.5% from 363 m to 369 m7.1% from 369 m to 374 m11.8% from 374 m to 380 m11.8% from 380 m to 385 m15.4% from 385 m to 389 m14.3% from 389 m to 390 m9.1% from 390 m to 392 m5.3% from 392 m to 396 m4.2% from 396 m to 401 m6.4% from 401 m to 410 m10.2% from 410 m to 416 m8.5% from 416 m to 421 m7.7% from 421 m to 423 m8.7% from 423 m to 426 m5.3% from 426 m to 429 m5.0% from 429 m to 433 m20.0% from 433 m to 437 m6.7% from 437 m to 440 m6.5% from 440 m to 444 m5.8% from 444 m to 450 m6.9% from 450 m to 456 m4.9% from 456 m to 464 m11.8% from 464 m to 470 m8.7% from 470 m to 474 m8.3% from 474 m to 479 m6.7% from 479 m to 485 m4.1% from 485 m to 500 m13.6% from 500 m to 504 m10.8% from 504 m to 508 m6.1% from 508 m to 511 m13.3% from 511 m to 513 m16.7% from 513 m to 514 m0.0% from 514 m to 516 m9.7% from 516 m to 522 m9.1% from 522 m to 526 m9.8% from 526 m to 531 m14.0% from 531 m to 535 m14.3% from 535 m to 538 m7.1% from 538 m to 540 m12.8% from 540 m to 545 m3.8% from 545 m to 550 m11.8% from 550 m to 556 m0.0% from 556 m to 558 m15.4% from 558 m to 561 m7.7% from 561 m to 563 m20.0% from 563 m to 565 m10.3% from 565 m to 569 m9.5% from 569 m to 573 m10.0% from 573 m to 579 m11.1% from 579 m to 585 m7.1% from 585 m to 590 m7.0% from 590 m to 596 m21.4% from 596 m to 599 m12.2% from 599 m to 604 m9.5% from 604 m to 606 m14.8% from 606 m to 609 m7.1% from 609 m to 614 m14.3% from 614 m to 617 m9.5% from 617 m to 621 m36.4% from 621 m to 623 m40.0% from 623 m to 624 m25.0% from 624 m to 625 m33.3% from 625 m to 626 m19.4% from 626 m to 630 m23.5% from 630 m to 631 m10.0% from 631 m to 633 m10.5% from 633 m to 635 m9.5% from 635 m to 637 m14.6% from 637 m to 641 m12.0% from 641 m to 646 m13.3% from 646 m to 649 m6.5% from 649 m to 652 m7.4% from 652 m to 658 m12.8% from 658 m to 663 m15.0% from 663 m to 667 m13.3% from 667 m to 671 m9.3% from 671 m to 675 m10.5% from 675 m to 679 m11.5% from 679 m to 684 m13.3% from 684 m to 689 m7.8% from 689 m to 694 m7.5% from 694 m to 699 m14.8% from 699 m to 702 m12.0% from 702 m to 707 m12.5% from 707 m to 712 m9.5% from 712 m to 716 m23.5% from 716 m to 718 m9.5% from 718 m to 720 m21.1% from 720 m to 722 m9.1% from 722 m to 726 m13.6% from 726 m to 730 m21.1% from 730 m to 732 m18.2% from 732 m to 736 m17.6% from 736 m to 739 m12.9% from 739 m to 742 m25.0% from 742 m to 745 m20.7% from 745 m to 747 m5.7% from 747 m to 751 m17.6% from 751 m to 754 m20.0% from 754 m to 757 m10.8% from 757 m to 761 m6.3% from 761 m to 771 m0.0% from 771 m to 773 m4.5% from 773 m to 777 m3.5% from 777 m to 788 m8.3% from 788 m to 793 m8.3% from 793 m to 798 m11.1% from 798 m to 802 m5.7% from 802 m to 805 m4.3% from 805 m to 814 m11.8% from 814 m to 818 m10.0% from 818 m to 822 m10.3% from 822 m to 826 m5.6% from 826 m to 829 m5.6% from 829 m to 833 m5.6% from 833 m to 840 m3.0% from 840 m to 847 m3.3% from 847 m to 853 m0.0% from 853 m to 859 m14%12%12%6%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance0.86 km / 0.53 miles
Elevation gain102 m / 335 ft
Average gradient11.9%
Maximum gradient27.9%
Elevation high335.6 m / 1,101 ft
Elevation low233.6 m / 766 ft
Climb difficulty score10,200.17

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Route de cluny - creaut MTB
Igé, Saône-et-Loire
0.83 km11.7%97 m
Chemin Blanc
Igé, Saône-et-Loire
0.82 km11.7%96 m
Route qui pique relais de Mande
Igé, Saône-et-Loire
0.78 km9.9%77 m
En Praulle
Igé, Saône-et-Loire
0.63 km13.7%86 m
Single Arbussin sens inverse
Igé, Saône-et-Loire
0.58 km9.8%57 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 557,172nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 68,239th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 4,072nd out of 21,205 cycling climbs in Bourgogne – Franche-Comté.

Ranks 893rd out of 4,267 cycling climbs in Saône-et-Loire.

🏵️

A local climb of note, this is the 10th most difficult cycling climb (out of 25 climbs) in Igé.

Useful Links

View this climb on other sites.

Google Street View
Strava