Montée Col de Thoste

📍
D 36, Vic-de-Chassenay, Montbard, Côte-d'Or, Bourgogne – Franche-Comté, Metropolitan France, 21140, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Montée Col de Thoste...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Montée Col de Thoste.

285 m310 m340 m365 m-2.6% from 0 m to 11 m-0.9% from 11 m to 23 m-0.9% from 23 m to 34 m0.0% from 34 m to 45 m1.8% from 45 m to 56 m3.7% from 56 m to 67 m3.9% from 67 m to 77 m3.1% from 77 m to 87 m4.2% from 87 m to 96 m5.2% from 96 m to 106 m5.7% from 106 m to 115 m4.8% from 115 m to 123 m2.4% from 123 m to 131 m3.8% from 131 m to 139 m2.7% from 139 m to 146 m2.9% from 146 m to 153 m4.5% from 153 m to 160 m3.0% from 160 m to 167 m3.2% from 167 m to 173 m4.6% from 173 m to 179 m4.7% from 179 m to 186 m3.2% from 186 m to 192 m4.8% from 192 m to 198 m4.9% from 198 m to 204 m5.1% from 204 m to 210 m3.2% from 210 m to 216 m6.9% from 216 m to 222 m4.4% from 222 m to 229 m7.9% from 229 m to 235 m6.3% from 235 m to 242 m8.2% from 242 m to 248 m6.7% from 248 m to 254 m5.3% from 254 m to 259 m6.9% from 259 m to 265 m7.0% from 265 m to 271 m8.8% from 271 m to 277 m5.4% from 277 m to 282 m5.7% from 282 m to 287 m9.1% from 287 m to 293 m8.5% from 293 m to 298 m4.1% from 298 m to 303 m7.8% from 303 m to 308 m6.7% from 308 m to 312 m4.5% from 312 m to 317 m6.1% from 317 m to 321 m6.8% from 321 m to 327 m7.3% from 327 m to 333 m4.9% from 333 m to 339 m6.6% from 339 m to 345 m8.2% from 345 m to 351 m5.1% from 351 m to 357 m9.6% from 357 m to 362 m5.5% from 362 m to 368 m8.2% from 368 m to 373 m8.0% from 373 m to 378 m5.3% from 378 m to 383 m13.2% from 383 m to 389 m7.4% from 389 m to 394 m5.6% from 394 m to 399 m6.0% from 399 m to 404 m8.9% from 404 m to 410 m9.3% from 410 m to 415 m8.3% from 415 m to 420 m8.0% from 420 m to 425 m8.0% from 425 m to 430 m7.0% from 430 m to 435 m6.8% from 435 m to 439 m8.6% from 439 m to 442 m4.8% from 442 m to 447 m5.4% from 447 m to 452 m8.8% from 452 m to 458 m7.1% from 458 m to 464 m7.7% from 464 m to 469 m5.2% from 469 m to 475 m6.9% from 475 m to 480 m5.6% from 480 m to 486 m5.2% from 486 m to 492 m7.0% from 492 m to 497 m9.6% from 497 m to 502 m7.4% from 502 m to 508 m7.7% from 508 m to 513 m8.7% from 513 m to 518 m7.9% from 518 m to 521 m7.9% from 521 m to 525 m11.1% from 525 m to 529 m5.3% from 529 m to 533 m6.3% from 533 m to 536 m9.1% from 536 m to 539 m8.3% from 539 m to 543 m7.0% from 543 m to 547 m7.8% from 547 m to 552 m5.7% from 552 m to 557 m10.9% from 557 m to 563 m7.1% from 563 m to 567 m4.1% from 567 m to 572 m5.8% from 572 m to 577 m8.2% from 577 m to 582 m8.5% from 582 m to 587 m3.8% from 587 m to 592 m6.8% from 592 m to 596 m7.7% from 596 m to 600 m6.0% from 600 m to 605 m5.2% from 605 m to 611 m5.3% from 611 m to 617 m6.7% from 617 m to 623 m8.8% from 623 m to 629 m7.0% from 629 m to 634 m5.2% from 634 m to 640 m4.4% from 640 m to 647 m10.5% from 647 m to 653 m6.5% from 653 m to 659 m6.2% from 659 m to 665 m6.3% from 665 m to 672 m5.9% from 672 m to 677 m4.0% from 677 m to 682 m3.4% from 682 m to 687 m5.3% from 687 m to 693 m6.3% from 693 m to 698 m5.9% from 698 m to 703 m8.7% from 703 m to 708 m3.9% from 708 m to 713 m4.4% from 713 m to 717 m6.5% from 717 m to 720 m5.4% from 720 m to 724 m5.3% from 724 m to 728 m7.0% from 728 m to 732 m3.8% from 732 m to 737 m8.5% from 737 m to 742 m14.9% from 742 m to 747 m3.5% from 747 m to 758 m7.1% from 758 m to 764 m6.2% from 764 m to 770 m9.0% from 770 m to 777 m9.5% from 777 m to 783 m8.2% from 783 m to 789 m9.1% from 789 m to 795 m5.0% from 795 m to 801 m9.3% from 801 m to 806 m6.0% from 806 m to 811 m6.0% from 811 m to 816 m8.5% from 816 m to 821 m4.2% from 821 m to 826 m7.4% from 826 m to 831 m8.0% from 831 m to 836 m9.6% from 836 m to 841 m10.6% from 841 m to 846 m4.9% from 846 m to 850 m8.5% from 850 m to 855 m5.9% from 855 m to 860 m9.3% from 860 m to 864 m4.5% from 864 m to 869 m3.9% from 869 m to 874 m5.4% from 874 m to 879 m7.4% from 879 m to 885 m7.3% from 885 m to 890 m5.2% from 890 m to 896 m5.3% from 896 m to 902 m7.4% from 902 m to 907 m3.9% from 907 m to 912 m3.6% from 912 m to 918 m5.3% from 918 m to 923 m5.3% from 923 m to 929 m6.6% from 929 m to 935 m5.3% from 935 m to 941 m5.8% from 941 m to 946 m6.0% from 946 m to 951 m5.5% from 951 m to 957 m5.6% from 957 m to 962 m5.6% from 962 m to 967 m5.8% from 967 m to 973 m5.5% from 973 m to 978 m7.5% from 978 m to 983 m5.4% from 983 m to 989 m5.7% from 989 m to 994 m6.9% from 994 m to 1 km6.7% from 1 km to 1.0 km7.1% from 1.0 km to 1.0 km3.5% from 1.0 km to 1.0 km7.5% from 1.0 km to 1.0 km6.0% from 1.0 km to 1.0 km8.2% from 1.0 km to 1.0 km5.9% from 1.0 km to 1.0 km5.9% from 1.0 km to 1.0 km4.5% from 1.0 km to 1.0 km9.3% from 1.0 km to 1.1 km6.7% from 1.1 km to 1.1 km6.8% from 1.1 km to 1.1 km9.8% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km6.2% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km5.8% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km4.5% from 1.1 km to 1.1 km5.1% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km6.2% from 1.1 km to 1.2 km4.8% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km4.3% from 1.2 km to 1.2 km4.9% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km3.5% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km3.2% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km4.5% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km4.6% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km4.4% from 1.2 km to 1.3 km4.3% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km4.7% from 1.3 km to 1.3 km3.2% from 1.3 km to 1.3 km4.5% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km4.6% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km4.4% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km3.1% from 1.3 km to 1.3 km3.0% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.3 km1.5% from 1.3 km to 1.4 km1.5% from 1.4 km to 1.4 km1.5% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km1.6% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-1.3% from 1.4 km to 1.4 km-1.3% from 1.4 km to 1.5 km-1.3% from 1.5 km to 1.5 km-1.3% from 1.5 km to 1.5 km-1.2% from 1.5 km to 1.5 km-2.6% from 1.5 km to 1.5 km3%7%7%6%5%1%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.48 km / 0.92 miles
Elevation gain73.9 m / 242 ft
Average gradient5%
Maximum gradient8.9%
Elevation high364.8 m / 1,197 ft
Elevation low289.7 m / 950 ft
Climb difficulty score7,389.32

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Col de Thoste D36
Vic-de-Chassenay, Côte-d'Or
1.49 km4.8%71 m
D15 LES ICHETS 1
Vic-de-Chassenay, Côte-d'Or
1.42 km5.1%81 m
D36 THOSTE 1
Vic-de-Chassenay, Côte-d'Or
2.17 km3.1%75 m
CHATEAU BOURBILLY
Vic-de-Chassenay, Côte-d'Or
1.37 km2.6%36 m
Bourbilly - Thoste
Vic-de-Chassenay, Côte-d'Or
2.76 km2%55 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 810,116th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 101,070th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 6,446th out of 21,205 cycling climbs in Bourgogne – Franche-Comté.

Ranks 1,098th out of 3,678 cycling climbs in Côte-d'Or.

🥈️

This is the second most difficult cycling climb in Vic-de-Chassenay.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb