dernière ligne droite

📍
D 3, Grammond, Montbrison, Loire, Auvergne-Rhône-Alpes, Metropolitan France, 42140, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for dernière ligne droite...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of dernière ligne droite.

810 m825 m840 m855 m-2.4% from 0 m to 4 m0.0% from 4 m to 7 m0.0% from 7 m to 11 m0.0% from 11 m to 15 m0.0% from 15 m to 19 m-1.9% from 19 m to 24 m0.0% from 24 m to 28 m0.0% from 28 m to 34 m0.0% from 34 m to 37 m-2.9% from 37 m to 40 m0.0% from 40 m to 44 m0.0% from 44 m to 48 m0.0% from 48 m to 52 m-2.3% from 52 m to 56 m0.0% from 56 m to 60 m0.0% from 60 m to 64 m0.0% from 64 m to 69 m0.0% from 69 m to 73 m-2.6% from 73 m to 77 m0.0% from 77 m to 81 m0.0% from 81 m to 85 m0.0% from 85 m to 89 m-2.6% from 89 m to 93 m0.0% from 93 m to 97 m0.0% from 97 m to 101 m0.0% from 101 m to 105 m-2.4% from 105 m to 109 m0.0% from 109 m to 113 m0.0% from 113 m to 118 m0.0% from 118 m to 122 m-2.8% from 122 m to 126 m0.0% from 126 m to 130 m0.0% from 130 m to 133 m0.0% from 133 m to 137 m-2.8% from 137 m to 141 m0.0% from 141 m to 145 m-2.8% from 145 m to 148 m0.0% from 148 m to 152 m0.0% from 152 m to 156 m0.0% from 156 m to 159 m0.0% from 159 m to 163 m-2.7% from 163 m to 167 m0.0% from 167 m to 171 m0.0% from 171 m to 175 m0.0% from 175 m to 179 m0.0% from 179 m to 183 m0.0% from 183 m to 187 m0.0% from 187 m to 191 m0.0% from 191 m to 195 m0.0% from 195 m to 199 m0.0% from 199 m to 202 m0.0% from 202 m to 206 m2.6% from 206 m to 210 m0.0% from 210 m to 214 m0.0% from 214 m to 218 m0.0% from 218 m to 221 m0.0% from 221 m to 226 m0.0% from 226 m to 230 m0.0% from 230 m to 234 m2.2% from 234 m to 239 m0.0% from 239 m to 243 m0.0% from 243 m to 248 m2.2% from 248 m to 252 m0.0% from 252 m to 257 m0.0% from 257 m to 262 m2.2% from 262 m to 266 m0.0% from 266 m to 271 m2.3% from 271 m to 275 m0.0% from 275 m to 280 m1.8% from 280 m to 286 m1.7% from 286 m to 292 m0.0% from 292 m to 297 m1.9% from 297 m to 303 m1.8% from 303 m to 308 m0.0% from 308 m to 313 m1.8% from 313 m to 319 m1.9% from 319 m to 324 m1.8% from 324 m to 330 m5.3% from 330 m to 335 m5.4% from 335 m to 341 m5.2% from 341 m to 347 m5.7% from 347 m to 352 m5.3% from 352 m to 358 m3.4% from 358 m to 364 m5.4% from 364 m to 369 m5.5% from 369 m to 375 m5.5% from 375 m to 380 m5.6% from 380 m to 386 m5.8% from 386 m to 391 m5.8% from 391 m to 396 m5.7% from 396 m to 401 m6.0% from 401 m to 406 m6.1% from 406 m to 411 m4.0% from 411 m to 416 m6.1% from 416 m to 421 m6.0% from 421 m to 426 m5.8% from 426 m to 431 m3.7% from 431 m to 437 m5.8% from 437 m to 442 m4.0% from 442 m to 447 m3.8% from 447 m to 452 m5.8% from 452 m to 457 m3.8% from 457 m to 463 m3.8% from 463 m to 468 m5.9% from 468 m to 473 m3.8% from 473 m to 478 m5.9% from 478 m to 483 m4.2% from 483 m to 488 m4.0% from 488 m to 493 m3.8% from 493 m to 498 m6.1% from 498 m to 503 m4.2% from 503 m to 508 m3.8% from 508 m to 513 m6.3% from 513 m to 518 m5.7% from 518 m to 523 m3.8% from 523 m to 529 m6.0% from 529 m to 534 m3.7% from 534 m to 539 m5.9% from 539 m to 544 m4.1% from 544 m to 549 m6.1% from 549 m to 554 m3.9% from 554 m to 559 m6.1% from 559 m to 564 m4.0% from 564 m to 569 m5.9% from 569 m to 574 m6.3% from 574 m to 579 m4.2% from 579 m to 584 m6.0% from 584 m to 589 m6.4% from 589 m to 593 m4.1% from 593 m to 598 m6.5% from 598 m to 603 m4.7% from 603 m to 607 m6.1% from 607 m to 612 m4.3% from 612 m to 617 m6.3% from 617 m to 621 m6.1% from 621 m to 626 m4.2% from 626 m to 631 m6.5% from 631 m to 636 m4.2% from 636 m to 641 m5.9% from 641 m to 646 m4.2% from 646 m to 650 m6.0% from 650 m to 655 m6.4% from 655 m to 660 m4.0% from 660 m to 665 m6.0% from 665 m to 670 m6.0% from 670 m to 675 m4.0% from 675 m to 680 m5.9% from 680 m to 685 m5.9% from 685 m to 690 m5.7% from 690 m to 696 m4.0% from 696 m to 701 m6.1% from 701 m to 706 m6.0% from 706 m to 711 m4.1% from 711 m to 715 m5.8% from 715 m to 721 m6.0% from 721 m to 726 m4.0% from 726 m to 731 m6.0% from 731 m to 736 m4.0% from 736 m to 741 m6.4% from 741 m to 745 m5.7% from 745 m to 751 m7.0% from 751 m to 755 m5.5% from 755 m to 760 m6.0% from 760 m to 765 m5.6% from 765 m to 771 m5.9% from 771 m to 776 m7.4% from 776 m to 781 m5.4% from 781 m to 787 m6.4% from 787 m to 792 m5.6% from 792 m to 797 m6.0% from 797 m to 802 m2.0% from 802 m to 807 m4.1% from 807 m to 812 m1.9% from 812 m to 817 m1.9% from 817 m to 823 m3.9% from 823 m to 828 m2.0% from 828 m to 833 m2.2% from 833 m to 837 m2.0% from 837 m to 842 m1.9% from 842 m to 848 m2.0% from 848 m to 853 m1.9% from 853 m to 858 m3.8% from 858 m to 863 m2.0% from 863 m to 868 m2.1% from 868 m to 873 m2.1% from 873 m to 878 m2.1% from 878 m to 883 m2.0% from 883 m to 888 m2.0% from 888 m to 893 m2.1% from 893 m to 897 m2.0% from 897 m to 902 m2.1% from 902 m to 907 m2.0% from 907 m to 912 m2.1% from 912 m to 917 m0.0% from 917 m to 922 m2.0% from 922 m to 927 m2.0% from 927 m to 932 m0.0% from 932 m to 937 m1.9% from 937 m to 942 m0.0% from 942 m to 948 m1.9% from 948 m to 953 m0.0% from 953 m to 958 m-3.7% from 958 m to 964 m-7.3% from 964 m to 969 m0.0% from 969 m to 974 m-2.0% from 974 m to 979 m-7.8% from 979 m to 984 m-4.0% from 984 m to 989 m2.0% from 989 m to 994 m0.0% from 994 m to 999 m0.0% from 999 m to 1.0 km1.9% from 1.0 km to 1.0 km5.7% from 1.0 km to 1.0 km7.8% from 1.0 km to 1.0 km9.3% from 1.0 km to 1.0 km8.0% from 1.0 km to 1.0 km8.8% from 1.0 km to 1.0 km7.4% from 1.0 km to 1.0 km9.6% from 1.0 km to 1.0 km7.7% from 1.0 km to 1.1 km9.6% from 1.1 km to 1.1 km7.8% from 1.1 km to 1.1 km9.6% from 1.1 km to 1.1 km7.5% from 1.1 km to 1.1 km10.2% from 1.1 km to 1.1 km9.6% from 1.1 km to 1.1 km7.5% from 1.1 km to 1.1 km9.1% from 1.1 km to 1.1 km9.6% from 1.1 km to 1.1 km8.8% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km3.9% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.2 km3.8% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km3.8% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.2 km1.9% from 1.2 km to 1.3 km3.7% from 1.3 km to 1.3 km-8.0% from 1.3 km to 1.3 km-12.1% from 1.3 km to 1.3 km-0%4%5%2%5%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.27 km / 0.79 miles
Elevation gain37.9 m / 124 ft
Average gradient3%
Maximum gradient9.2%
Elevation high852 m / 2,795 ft
Elevation low811.9 m / 2,664 ft
Climb difficulty score3,788.03

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
montée Fontanes
Grammond, Loire
1.31 km2.6%34 m
montée du maître/grammond
Grammond, Loire
1.3 km5.3%70 m
On s'arrache avant Fontanes
Grammond, Loire
1.81 km3.5%64 m
Raidard 2
Grammond, Loire
1.85 km7.3%134 m
Raidard 3
Grammond, Loire
0.76 km8.7%66 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,331,632nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 175,835th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 47,364th out of 68,974 cycling climbs in Auvergne-Rhône-Alpes.

Ranks 3,595th out of 5,305 cycling climbs in Loire.

🏵️

A local climb of note, this is the 7th most difficult cycling climb (out of 10 climbs) in Grammond.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb