Montée sortie de Tence

📍
Route de Saint-Étienne, Salettes, Tence, Yssingeaux, Haute-Loire, Auvergne-Rhône-Alpes, Metropolitan France, 43190, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Montée sortie de Tence ...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Montée sortie de Tence .

830 m850 m875 m895 m1.3% from 0 m to 8 m1.2% from 8 m to 16 m1.2% from 16 m to 25 m2.6% from 25 m to 32 m1.3% from 32 m to 40 m1.4% from 40 m to 47 m2.4% from 47 m to 56 m3.4% from 56 m to 64 m2.3% from 64 m to 73 m4.4% from 73 m to 80 m3.1% from 80 m to 86 m2.9% from 86 m to 93 m2.0% from 93 m to 98 m3.0% from 98 m to 105 m6.0% from 105 m to 110 m7.7% from 110 m to 115 m7.4% from 115 m to 123 m3.7% from 123 m to 129 m5.6% from 129 m to 134 m3.7% from 134 m to 139 m4.2% from 139 m to 144 m5.9% from 144 m to 149 m3.8% from 149 m to 155 m3.9% from 155 m to 160 m4.7% from 160 m to 164 m6.0% from 164 m to 169 m4.6% from 169 m to 176 m5.8% from 176 m to 181 m7.1% from 181 m to 185 m7.3% from 185 m to 190 m6.0% from 190 m to 195 m7.7% from 195 m to 201 m7.0% from 201 m to 206 m6.1% from 206 m to 213 m8.2% from 213 m to 218 m8.1% from 218 m to 224 m7.3% from 224 m to 230 m7.9% from 230 m to 236 m6.7% from 236 m to 242 m7.0% from 242 m to 248 m7.0% from 248 m to 253 m7.4% from 253 m to 259 m7.5% from 259 m to 263 m6.0% from 263 m to 268 m7.1% from 268 m to 273 m7.1% from 273 m to 277 m8.0% from 277 m to 282 m6.0% from 282 m to 287 m7.8% from 287 m to 293 m6.7% from 293 m to 299 m6.1% from 299 m to 303 m7.3% from 303 m to 309 m5.6% from 309 m to 313 m9.4% from 313 m to 318 m7.7% from 318 m to 323 m8.0% from 323 m to 328 m7.5% from 328 m to 333 m8.0% from 333 m to 341 m8.7% from 341 m to 345 m8.3% from 345 m to 350 m7.5% from 350 m to 358 m9.4% from 358 m to 364 m8.1% from 364 m to 367 m7.0% from 367 m to 372 m13.3% from 372 m to 375 m14.3% from 375 m to 379 m14.0% from 379 m to 383 m6.1% from 383 m to 388 m9.5% from 388 m to 392 m8.9% from 392 m to 397 m6.5% from 397 m to 401 m8.3% from 401 m to 406 m8.9% from 406 m to 411 m6.5% from 411 m to 415 m8.7% from 415 m to 420 m7.0% from 420 m to 424 m6.7% from 424 m to 429 m9.3% from 429 m to 433 m7.0% from 433 m to 437 m6.8% from 437 m to 442 m8.7% from 442 m to 446 m2.1% from 446 m to 451 m0.0% from 451 m to 456 m2.1% from 456 m to 461 m2.3% from 461 m to 465 m2.3% from 465 m to 469 m2.3% from 469 m to 474 m4.3% from 474 m to 478 m2.2% from 478 m to 483 m2.2% from 483 m to 487 m2.2% from 487 m to 492 m6.5% from 492 m to 496 m6.5% from 496 m to 501 m9.1% from 501 m to 505 m6.7% from 505 m to 510 m6.5% from 510 m to 515 m6.5% from 515 m to 519 m6.5% from 519 m to 524 m8.7% from 524 m to 528 m6.5% from 528 m to 533 m6.4% from 533 m to 538 m8.7% from 538 m to 542 m6.5% from 542 m to 547 m6.3% from 547 m to 552 m2.1% from 552 m to 556 m4.3% from 556 m to 561 m4.4% from 561 m to 566 m6.5% from 566 m to 570 m6.7% from 570 m to 575 m9.3% from 575 m to 579 m6.5% from 579 m to 584 m6.4% from 584 m to 588 m6.7% from 588 m to 593 m2.2% from 593 m to 597 m4.5% from 597 m to 602 m2.1% from 602 m to 607 m6.4% from 607 m to 611 m6.4% from 611 m to 616 m6.2% from 616 m to 621 m6.5% from 621 m to 625 m4.3% from 625 m to 630 m2.2% from 630 m to 635 m4.3% from 635 m to 639 m2.0% from 639 m to 644 m4.0% from 644 m to 649 m2.0% from 649 m to 654 m4.3% from 654 m to 659 m7.1% from 659 m to 664 m6.3% from 664 m to 669 m5.9% from 669 m to 674 m2.3% from 674 m to 679 m2.2% from 679 m to 683 m2.2% from 683 m to 688 m3.2% from 688 m to 694 m1.9% from 694 m to 699 m3.8% from 699 m to 705 m3.7% from 705 m to 710 m3.9% from 710 m to 715 m5.2% from 715 m to 721 m5.3% from 721 m to 727 m6.3% from 727 m to 733 m3.8% from 733 m to 738 m1.7% from 738 m to 744 m1.4% from 744 m to 751 m1.6% from 751 m to 757 m1.3% from 757 m to 765 m2.2% from 765 m to 770 m0.0% from 770 m to 776 m1.9% from 776 m to 781 m0.0% from 781 m to 787 m1.7% from 787 m to 793 m0.0% from 793 m to 798 m0.0% from 798 m to 804 m0.0% from 804 m to 811 m1.7% from 811 m to 817 m0.0% from 817 m to 822 m0.0% from 822 m to 828 m1.3% from 828 m to 836 m1.7% from 836 m to 842 m2.0% from 842 m to 847 m1.8% from 847 m to 852 m1.4% from 852 m to 860 m1.4% from 860 m to 867 m3.3% from 867 m to 873 m4.9% from 873 m to 879 m5.5% from 879 m to 886 m6.9% from 886 m to 892 m2.9% from 892 m to 899 m1.6% from 899 m to 905 m1.5% from 905 m to 912 m3.1% from 912 m to 918 m3.8% from 918 m to 924 m4.1% from 924 m to 931 m4.6% from 931 m to 937 m3.9% from 937 m to 945 m4.3% from 945 m to 952 m4.8% from 952 m to 958 m4.8% from 958 m to 964 m4.3% from 964 m to 971 m3.3% from 971 m to 977 m4.4% from 977 m to 984 m4.8% from 984 m to 991 m4.8% from 991 m to 997 m4.8% from 997 m to 1.0 km3.3% from 1.0 km to 1.0 km4.9% from 1.0 km to 1.0 km5.0% from 1.0 km to 1.0 km3.3% from 1.0 km to 1.0 km5.0% from 1.0 km to 1.0 km4.8% from 1.0 km to 1.0 km3.3% from 1.0 km to 1.0 km4.6% from 1.0 km to 1.1 km4.9% from 1.1 km to 1.1 km4.8% from 1.1 km to 1.1 km4.6% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km4.8% from 1.1 km to 1.1 km3.3% from 1.1 km to 1.1 km5.2% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km4.8% from 1.1 km to 1.1 km3.5% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.2 km4.7% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km3.3% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km3.5% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km3.7% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.3 km1.7% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.7% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km5%7%5%3%4%1%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.32 km / 0.82 miles
Elevation gain57.3 m / 188 ft
Average gradient4.3%
Maximum gradient12%
Elevation high891.3 m / 2,924 ft
Elevation low834 m / 2,736 ft
Climb difficulty score5,725.33

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Sortie de Tence (direction le chambon)
Tence, Haute-Loire
1.22 km4.2%52 m
Laniel Climb
Tence, Haute-Loire
1.14 km5%57 m
Montée La Combe
Tence, Haute-Loire
1.32 km3.2%42 m
Bathelane climb
Tence, Haute-Loire
1.19 km3.5%42 m
Bosse des Sapins
Tence, Haute-Loire
1.34 km3%41 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 992,505th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 126,785th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 38,633rd out of 68,974 cycling climbs in Auvergne-Rhône-Alpes.

Ranks 1,193rd out of 2,165 cycling climbs in Haute-Loire.

Ranking 14th out of 38 cycling climbs in Tence.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb