Montée bois Paccallet

📍
Route de Torcieu, Bettant, Belley, Ain, Auvergne-Rhône-Alpes, Metropolitan France, 01500, France
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Montée bois Paccallet...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Montée bois Paccallet.

290 m315 m335 m360 m2.0% from 0 m to 5 m-2.1% from 5 m to 10 m-1.7% from 10 m to 16 m-2.0% from 16 m to 21 m-2.4% from 21 m to 25 m-2.7% from 25 m to 29 m0.0% from 29 m to 32 m-2.9% from 32 m to 35 m0.0% from 35 m to 39 m0.0% from 39 m to 43 m-2.0% from 43 m to 48 m0.0% from 48 m to 53 m0.0% from 53 m to 57 m0.0% from 57 m to 60 m0.0% from 60 m to 64 m0.0% from 64 m to 68 m0.0% from 68 m to 72 m0.0% from 72 m to 77 m0.0% from 77 m to 81 m0.0% from 81 m to 86 m0.0% from 86 m to 90 m-2.2% from 90 m to 95 m0.0% from 95 m to 99 m0.0% from 99 m to 102 m-2.3% from 102 m to 106 m0.0% from 106 m to 112 m-2.9% from 112 m to 115 m-3.1% from 115 m to 118 m0.0% from 118 m to 122 m-2.8% from 122 m to 126 m-2.9% from 126 m to 129 m0.0% from 129 m to 133 m-2.8% from 133 m to 136 m-3.0% from 136 m to 140 m0.0% from 140 m to 143 m-1.8% from 143 m to 149 m-2.8% from 149 m to 156 m-3.1% from 156 m to 162 m-2.5% from 162 m to 166 m-3.8% from 166 m to 171 m-2.1% from 171 m to 176 m-2.9% from 176 m to 180 m-3.2% from 180 m to 183 m-3.8% from 183 m to 188 m-2.6% from 188 m to 192 m-1.9% from 192 m to 197 m0.0% from 197 m to 201 m-2.9% from 201 m to 204 m-2.1% from 204 m to 209 m0.0% from 209 m to 212 m0.0% from 212 m to 217 m-2.4% from 217 m to 221 m0.0% from 221 m to 226 m0.0% from 226 m to 230 m0.0% from 230 m to 234 m-3.0% from 234 m to 238 m0.0% from 238 m to 242 m-2.4% from 242 m to 246 m-2.3% from 246 m to 250 m0.0% from 250 m to 254 m-2.9% from 254 m to 257 m-2.9% from 257 m to 261 m-4.3% from 261 m to 265 m2.0% from 265 m to 271 m5.1% from 271 m to 274 m6.7% from 274 m to 279 m8.2% from 279 m to 285 m11.8% from 285 m to 290 m10.6% from 290 m to 295 m9.8% from 295 m to 300 m9.8% from 300 m to 305 m16.7% from 305 m to 309 m22.6% from 309 m to 312 m23.5% from 312 m to 317 m22.6% from 317 m to 320 m18.9% from 320 m to 324 m20.0% from 324 m to 328 m17.2% from 328 m to 333 m15.2% from 333 m to 337 m22.0% from 337 m to 341 m19.5% from 341 m to 345 m25.0% from 345 m to 349 m23.8% from 349 m to 354 m25.5% from 354 m to 359 m23.7% from 359 m to 365 m25.8% from 365 m to 368 m22.6% from 368 m to 371 m25.8% from 371 m to 374 m12.8% from 374 m to 378 m10.3% from 378 m to 382 m8.2% from 382 m to 387 m7.7% from 387 m to 390 m5.9% from 390 m to 394 m8.7% from 394 m to 398 m6.7% from 398 m to 403 m6.5% from 403 m to 406 m8.3% from 406 m to 410 m5.6% from 410 m to 413 m6.5% from 413 m to 418 m6.1% from 418 m to 421 m2.9% from 421 m to 425 m3.2% from 425 m to 428 m2.2% from 428 m to 432 m8.1% from 432 m to 436 m10.6% from 436 m to 441 m17.3% from 441 m to 446 m22.0% from 446 m to 450 m17.1% from 450 m to 454 m15.2% from 454 m to 458 m22.5% from 458 m to 462 m22.0% from 462 m to 466 m16.3% from 466 m to 471 m20.6% from 471 m to 474 m15.0% from 474 m to 478 m14.0% from 478 m to 482 m12.2% from 482 m to 486 m21.4% from 486 m to 492 m20.0% from 492 m to 496 m11.4% from 496 m to 500 m14.3% from 500 m to 505 m18.9% from 505 m to 509 m20.5% from 509 m to 513 m20.8% from 513 m to 518 m23.1% from 518 m to 522 m21.6% from 522 m to 525 m13.5% from 525 m to 530 m11.1% from 530 m to 536 m1.6% from 536 m to 542 m0.0% from 542 m to 546 m14.3% from 546 m to 551 m15.4% from 551 m to 555 m5.1% from 555 m to 559 m2.3% from 559 m to 563 m14.6% from 563 m to 568 m34.3% from 568 m to 572 m31.4% from 572 m to 575 m21.9% from 575 m to 578 m21.7% from 578 m to 583 m21.4% from 583 m to 589 m20.5% from 589 m to 593 m27.3% from 593 m to 597 m24.1% from 597 m to 603 m23.3% from 603 m to 606 m21.3% from 606 m to 610 m9.8% from 610 m to 616 m6.1% from 616 m to 619 m-7.0% from 619 m to 625 m-8.0% from 625 m to 630 m4.2% from 630 m to 634 m3.4% from 634 m to 640 m3.2% from 640 m to 643 m0.0% from 643 m to 646 m-3.7% from 646 m to 652 m-6.3% from 652 m to 655 m1.8% from 655 m to 661 m7.3% from 661 m to 666 m11.4% from 666 m to 671 m12.3% from 671 m to 676 m11.8% from 676 m to 680 m8.0% from 680 m to 687 m5.3% from 687 m to 691 m9.8% from 691 m to 695 m13.9% from 695 m to 699 m10.3% from 699 m to 703 m14.3% from 703 m to 706 m9.4% from 706 m to 709 m11.8% from 709 m to 713 m12.8% from 713 m to 717 m12.9% from 717 m to 720 m10.0% from 720 m to 725 m10.6% from 725 m to 729 m4.8% from 729 m to 736 m3.0% from 736 m to 739 m9.8% from 739 m to 744 m10.4% from 744 m to 749 m13.8% from 749 m to 755 m12.9% from 755 m to 758 m6.5% from 758 m to 762 m3.8% from 762 m to 768 m10.7% from 768 m to 773 m12.8% from 773 m to 778 m9.8% from 778 m to 782 m12.2% from 782 m to 786 m10.5% from 786 m to 790 m12.7% from 790 m to 795 m0.0% from 795 m to 799 m0.0% from 799 m to 804 m0.0% from 804 m to 808 m2.9% from 808 m to 812 m0.0% from 812 m to 816 m0.0% from 816 m to 819 m1.8% from 819 m to 825 m2.5% from 825 m to 829 m2.2% from 829 m to 833 m4.0% from 833 m to 838 m0.0% from 838 m to 843 m4.3% from 843 m to 848 m2.4% from 848 m to 852 m3.0% from 852 m to 856 m0.0% from 856 m to 859 m2.4% from 859 m to 863 m2.1% from 863 m to 868 m0.0% from 868 m to 871 m2.6% from 871 m to 875 m5.1% from 875 m to 879 m3.0% from 879 m to 882 m4.2% from 882 m to 887 m2.0% from 887 m to 892 m0.0% from 892 m to 895 m3.2% from 895 m to 898 m3.8% from 898 m to 904 m0.0% from 904 m to 907 m0.0% from 907 m to 910 m0.0% from 910 m to 916 m0.0% from 916 m to 920 m3.3% from 920 m to 923 m0.0% from 923 m to 927 m0.0% from 927 m to 930 m0.0% from 930 m to 934 m1.5% from 934 m to 941 m0.0% from 941 m to 947 m0.0% from 947 m to 953 m2.6% from 953 m to 957 m1.6% from 957 m to 963 m0.0% from 963 m to 966 m0.0% from 966 m to 972 m0.0% from 972 m to 979 m-2.0% from 979 m to 984 m-2.3% from 984 m to 988 m0.0% from 988 m to 993 m-2.4% from 993 m to 997 m0.0% from 997 m to 1.0 km-1.9% from 1.0 km to 1.0 km-2.0% from 1.0 km to 1.0 km-2.5% from 1.0 km to 1.0 km-2.5% from 1.0 km to 1.0 km-2.5% from 1.0 km to 1.0 km-2.4% from 1.0 km to 1.0 km-3.8% from 1.0 km to 1.0 km-4.1% from 1.0 km to 1.0 km-6.9% from 1.0 km to 1.0 km-8.7% from 1.0 km to 1.0 km-7.1% from 1.0 km to 1.1 km-9.5% from 1.1 km to 1.1 km-10.2% from 1.1 km to 1.1 km-7.3% from 1.1 km to 1.1 km-7.5% from 1.1 km to 1.1 km-4.7% from 1.1 km to 1.1 km-12.5% from 1.1 km to 1.1 km-15.6% from 1.1 km to 1.1 km-12.5% from 1.1 km to 1.1 km-11.5% from 1.1 km to 1.1 km-11.6% from 1.1 km to 1.1 km-1%13%11%3%-7%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.11 km / 0.69 miles
Elevation gain57 m / 187 ft
Average gradient5.2%
Maximum gradient27%
Elevation high358.6 m / 1,177 ft
Elevation low290 m / 951 ft
Climb difficulty score5,703.86

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Côte de Bettant par Pisse Vieille
Bettant, Ain
1.49 km6.3%93 m
Bois de Pacallet Bettant
Bettant, Ain
1.72 km5.7%98 m
côte de Bettant
Bettant, Ain
1.66 km6.2%103 m
Montagne de Colloverge
Bettant, Ain
1.1 km12%132 m
Raccourci de Pisse Vieille
Bettant, Ain
0.6 km5.9%36 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 995,299th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 127,165th most difficult cycling climb of all 342,105 climbs in France.

📉

Places 38,707th out of 68,974 cycling climbs in Auvergne-Rhône-Alpes.

Ranks 1,953rd out of 4,458 cycling climbs in Ain.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 10 climbs) in Bettant.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb