Repecho de ida Cuambo

📍
Vía San Lorenzo, Salinas, Ibarra, Imbabura, 100156, Ecuador
Cat. 4

Estimated Climb Time

Loading your rider settings for Repecho de ida Cuambo...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Repecho de ida Cuambo.

1615 m1645 m1680 m1710 m9.2% from 0 m to 7 m7.5% from 7 m to 12 m9.0% from 12 m to 19 m9.8% from 19 m to 25 m10.2% from 25 m to 31 m10.7% from 31 m to 36 m10.8% from 36 m to 43 m11.5% from 43 m to 49 m12.3% from 49 m to 54 m13.0% from 54 m to 60 m13.2% from 60 m to 65 m14.0% from 65 m to 70 m14.0% from 70 m to 76 m13.7% from 76 m to 81 m13.5% from 81 m to 86 m13.5% from 86 m to 91 m9.4% from 91 m to 97 m12.0% from 97 m to 102 m10.4% from 102 m to 106 m12.0% from 106 m to 111 m11.8% from 111 m to 117 m12.2% from 117 m to 121 m11.8% from 121 m to 127 m10.9% from 127 m to 131 m10.9% from 131 m to 136 m12.1% from 136 m to 142 m11.8% from 142 m to 147 m12.5% from 147 m to 151 m12.2% from 151 m to 156 m13.0% from 156 m to 161 m11.1% from 161 m to 165 m13.0% from 165 m to 170 m11.1% from 170 m to 175 m11.6% from 175 m to 179 m11.9% from 179 m to 183 m13.6% from 183 m to 187 m9.5% from 187 m to 192 m9.3% from 192 m to 196 m11.9% from 196 m to 200 m9.3% from 200 m to 204 m11.6% from 204 m to 209 m11.6% from 209 m to 213 m9.5% from 213 m to 217 m11.9% from 217 m to 221 m11.4% from 221 m to 226 m11.6% from 226 m to 230 m11.6% from 230 m to 234 m11.4% from 234 m to 239 m11.6% from 239 m to 243 m11.4% from 243 m to 248 m11.6% from 248 m to 252 m11.4% from 252 m to 256 m11.6% from 256 m to 261 m14.0% from 261 m to 265 m11.4% from 265 m to 269 m14.0% from 269 m to 274 m11.6% from 274 m to 278 m13.3% from 278 m to 282 m13.3% from 282 m to 287 m15.6% from 287 m to 291 m14.0% from 291 m to 296 m15.9% from 296 m to 300 m15.2% from 300 m to 305 m15.2% from 305 m to 309 m13.6% from 309 m to 314 m14.0% from 314 m to 318 m13.6% from 318 m to 322 m14.0% from 322 m to 327 m14.3% from 327 m to 331 m14.3% from 331 m to 335 m11.9% from 335 m to 339 m14.3% from 339 m to 343 m11.6% from 343 m to 348 m14.0% from 348 m to 352 m11.9% from 352 m to 356 m14.3% from 356 m to 360 m16.7% from 360 m to 365 m12.2% from 365 m to 369 m14.3% from 369 m to 373 m14.3% from 373 m to 377 m12.2% from 377 m to 381 m14.6% from 381 m to 385 m16.7% from 385 m to 390 m14.3% from 390 m to 394 m14.6% from 394 m to 398 m14.0% from 398 m to 402 m14.3% from 402 m to 406 m14.6% from 406 m to 410 m14.6% from 410 m to 415 m14.3% from 415 m to 419 m14.6% from 419 m to 423 m14.0% from 423 m to 427 m16.7% from 427 m to 431 m13.6% from 431 m to 436 m13.6% from 436 m to 440 m13.6% from 440 m to 445 m15.9% from 445 m to 449 m11.6% from 449 m to 453 m15.9% from 453 m to 458 m14.6% from 458 m to 462 m14.3% from 462 m to 466 m14.6% from 466 m to 470 m12.5% from 470 m to 474 m10.0% from 474 m to 478 m10.3% from 478 m to 482 m10.3% from 482 m to 486 m10.3% from 486 m to 490 m7.7% from 490 m to 494 m10.3% from 494 m to 498 m7.7% from 498 m to 501 m7.9% from 501 m to 505 m7.7% from 505 m to 509 m7.7% from 509 m to 513 m8.1% from 513 m to 517 m7.7% from 517 m to 521 m7.9% from 521 m to 524 m7.5% from 524 m to 528 m7.5% from 528 m to 532 m7.5% from 532 m to 536 m4.9% from 536 m to 541 m7.3% from 541 m to 545 m7.7% from 545 m to 549 m7.3% from 549 m to 553 m5.1% from 553 m to 557 m7.7% from 557 m to 560 m5.1% from 560 m to 564 m7.7% from 564 m to 568 m7.7% from 568 m to 572 m7.7% from 572 m to 576 m7.7% from 576 m to 580 m7.7% from 580 m to 584 m10.3% from 584 m to 588 m7.7% from 588 m to 592 m7.7% from 592 m to 596 m7.7% from 596 m to 599 m7.9% from 599 m to 603 m10.3% from 603 m to 607 m7.7% from 607 m to 611 m7.9% from 611 m to 615 m7.9% from 615 m to 619 m7.7% from 619 m to 623 m7.5% from 623 m to 627 m10.0% from 627 m to 631 m5.0% from 631 m to 635 m9.5% from 635 m to 639 m7.3% from 639 m to 643 m4.8% from 643 m to 647 m7.0% from 647 m to 651 m7.1% from 651 m to 656 m4.9% from 656 m to 660 m2.4% from 660 m to 664 m2.4% from 664 m to 668 m0.0% from 668 m to 672 m2.4% from 672 m to 676 m0.0% from 676 m to 680 m2.4% from 680 m to 685 m0.0% from 685 m to 689 m2.3% from 689 m to 693 m2.3% from 693 m to 697 m0.0% from 697 m to 702 m0.0% from 702 m to 706 m0.0% from 706 m to 710 m0.0% from 710 m to 714 m0.0% from 714 m to 719 m0.0% from 719 m to 723 m0.0% from 723 m to 727 m-2.5% from 727 m to 731 m0.0% from 731 m to 735 m0.0% from 735 m to 739 m0.0% from 739 m to 743 m0.0% from 743 m to 747 m0.0% from 747 m to 751 m0.0% from 751 m to 755 m-2.5% from 755 m to 759 m-2.4% from 759 m to 763 m-2.4% from 763 m to 767 m-2.4% from 767 m to 772 m-2.4% from 772 m to 776 m0.0% from 776 m to 780 m-2.6% from 780 m to 784 m-2.5% from 784 m to 788 m0.0% from 788 m to 792 m-2.3% from 792 m to 796 m0.0% from 796 m to 801 m-2.1% from 801 m to 805 m0.0% from 805 m to 810 m-2.2% from 810 m to 815 m0.0% from 815 m to 819 m-2.3% from 819 m to 823 m-2.3% from 823 m to 828 m-2.3% from 828 m to 832 m-2.3% from 832 m to 837 m-2.3% from 837 m to 841 m0.0% from 841 m to 846 m-2.2% from 846 m to 850 m0.0% from 850 m to 855 m-2.2% from 855 m to 859 m0.0% from 859 m to 864 m-2.1% from 864 m to 869 m0.0% from 869 m to 874 m0.0% from 874 m to 880 m0.0% from 880 m to 884 m0.0% from 884 m to 890 m-2.0% from 890 m to 895 m0.0% from 895 m to 900 m-2.0% from 900 m to 905 m0.0% from 905 m to 911 m0.0% from 911 m to 917 m-2.0% from 917 m to 922 m-1.8% from 922 m to 927 m-2.0% from 927 m to 932 m1.6% from 932 m to 938 m3.3% from 938 m to 944 m8.3% from 944 m to 950 m8.8% from 950 m to 956 m7.0% from 956 m to 962 m7.9% from 962 m to 968 m9.4% from 968 m to 975 m7.1% from 975 m to 980 m8.8% from 980 m to 986 m5.3% from 986 m to 992 m8.5% from 992 m to 997 m5.4% from 997 m to 1.0 km8.3% from 1.0 km to 1.0 km9.4% from 1.0 km to 1.0 km9.4% from 1.0 km to 1.0 km6.7% from 1.0 km to 1.0 km10.2% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.0 km1.9% from 1.0 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km1.6% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km3.3% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km3.3% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km1.9% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.2 km1.7% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km2.0% from 1.2 km to 1.2 km3.9% from 1.2 km to 1.2 km1.8% from 1.2 km to 1.2 km3.5% from 1.2 km to 1.2 km3.4% from 1.2 km to 1.2 km4.0% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km4.3% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km4.4% from 1.2 km to 1.2 km4.3% from 1.2 km to 1.2 km2.1% from 1.2 km to 1.2 km1.7% from 1.2 km to 1.2 km3.6% from 1.2 km to 1.2 km4.3% from 1.2 km to 1.3 km4.1% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km4.2% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km5.2% from 1.3 km to 1.3 km3.1% from 1.3 km to 1.3 km4.2% from 1.3 km to 1.3 km3.8% from 1.3 km to 1.3 km3.9% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km3.6% from 1.3 km to 1.3 km3.8% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km2.1% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km2.0% from 1.3 km to 1.3 km3.9% from 1.3 km to 1.3 km1.8% from 1.3 km to 1.3 km1.8% from 1.3 km to 1.4 km1.7% from 1.4 km to 1.4 km3.6% from 1.4 km to 1.4 km1.9% from 1.4 km to 1.4 km1.7% from 1.4 km to 1.4 km1.6% from 1.4 km to 1.4 km2.9% from 1.4 km to 1.4 km1.8% from 1.4 km to 1.4 km1.5% from 1.4 km to 1.4 km1.7% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-1.2% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-1.5% from 1.4 km to 1.4 km11%13%5%1%3%2%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.44 km / 0.90 miles
Elevation gain88.9 m / 292 ft
Average gradient6.2%
Maximum gradient15.2%
Elevation high1,707 m / 5,600 ft
Elevation low1,617.9 m / 5,308 ft
Climb difficulty score8,895.91

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Repecho PM Salinas
Salinas, Ibarra
2.29 km5.6%128 m
CANAL DE RIEGO
Salinas, Ibarra
4.18 km4.3%180 m
Cuadrones - Desvío a Pablo Arenas (Tumbabiro)
Salinas, Ibarra
5.06 km7.1%358 m
Cuadrones - Tumbabiro - PM Cruz Tola
Salinas, Ibarra
7.08 km7.5%532 m
Salinas - PM Cruz Tola (via Chachimbiro)
Salinas, Ibarra
11.6 km5.1%587 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 660,533rd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 1,177th most difficult cycling climb of all 2,575 climbs in Ecuador.

📉

Places 141st out of 239 cycling climbs in Imbabura.

Ranks 74th out of 138 cycling climbs in Ibarra.

🏵️

A local climb of note, this is the 6th most difficult cycling climb (out of 7 climbs) in Salinas.

Useful Links

View this climb on other sites.

Google Street View
Strava