The Long Leadout
Estimated Climb Time
Loading your rider settings for The Long Leadout...
Climb Profile
Altitude builds left to right while colour shows gradient severity for each part of The Long Leadout.
Veloviewer Route And Climb Visualiser
Switch to Veloviewer when you want the full external route visualiser.
Climb Stats
Combined metric and imperial stats for quick route planning.
| Climb category | Uncategorised |
| Distance | 6.78 km / 4.21 miles |
| Elevation gain | 29 m / 95 ft |
| Average gradient | 0.4% |
| Maximum gradient | 7.5% |
| Elevation high | 183.5 m / 602 ft |
| Elevation low | 140.6 m / 461 ft |
| Climb difficulty score | 2,915.74 |
Similar Climbs Nearby
If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.
Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.
| Climb | Length | Gradient | Ascent |
|---|---|---|---|
Warden to McCowan Scarborough, Toronto | 5.76 km | 0.5% | 30 m |
Birchmountain Scarborough, Toronto | 7.47 km | 0.5% | 39 m |
Morningside - Kingston to McNicoll Scarborough, Toronto | 7.87 km | 0.5% | 41 m |
Zoo - Steeles TT Scarborough, Toronto | 5.66 km | 0.6% | 34 m |
Lawrence to Denison Scarborough, Toronto | 9.87 km | 0.3% | 33 m |
Climb Rank
How does this climb compare against every other climb in the world?
🗺 This climb ranks 1,559,296th out of 2,710,652 worldwide cycling climbs. |
🧮 Ranked as the 25,170th most difficult cycling climb of all 55,671 climbs in Canada. |
📉 Places 5,248th out of 18,309 cycling climbs in Ontario. |
⚖ Ranks 289th out of 1,327 cycling climbs in Toronto. |
⚖ Ranking 68th out of 295 cycling climbs in Scarborough. |
Useful Links
View this climb on other sites.
| Google Street View |
| Strava |
Something wrong with this listing? Help keep BikeClimbs accurate.
Flag this climb