Mike's run.

📍
Bayview Avenue, Governor's Bridge, Don Valley West, East York, Toronto, Golden Horseshoe, Ontario, M4K 2B9, Canada
Uncategorised

Estimated Climb Time

Loading your rider settings for Mike's run....

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Mike's run..

25 m45 m65 m85 m4.0% from 0 m to 5 m0.0% from 5 m to 10 m4.3% from 10 m to 15 m0.0% from 15 m to 20 m8.2% from 20 m to 25 m8.7% from 25 m to 29 m4.3% from 29 m to 34 m4.4% from 34 m to 38 m9.1% from 38 m to 43 m4.7% from 43 m to 47 m0.0% from 47 m to 51 m4.8% from 51 m to 55 m9.3% from 55 m to 60 m4.5% from 60 m to 64 m4.5% from 64 m to 68 m4.8% from 68 m to 73 m4.5% from 73 m to 77 m4.9% from 77 m to 81 m9.5% from 81 m to 85 m9.3% from 85 m to 90 m9.5% from 90 m to 94 m10.3% from 94 m to 98 m5.1% from 98 m to 102 m5.0% from 102 m to 106 m5.1% from 106 m to 110 m5.1% from 110 m to 113 m5.3% from 113 m to 117 m10.3% from 117 m to 121 m5.0% from 121 m to 125 m10.0% from 125 m to 129 m0.0% from 129 m to 133 m4.9% from 133 m to 137 m4.9% from 137 m to 142 m4.9% from 142 m to 146 m4.9% from 146 m to 150 m9.5% from 150 m to 154 m4.8% from 154 m to 158 m9.3% from 158 m to 162 m0.0% from 162 m to 167 m4.7% from 167 m to 171 m4.7% from 171 m to 175 m4.8% from 175 m to 180 m4.7% from 180 m to 184 m4.7% from 184 m to 188 m4.9% from 188 m to 192 m10.0% from 192 m to 196 m5.0% from 196 m to 200 m5.3% from 200 m to 204 m11.1% from 204 m to 208 m5.4% from 208 m to 211 m5.4% from 211 m to 215 m5.6% from 215 m to 219 m5.7% from 219 m to 222 m5.6% from 222 m to 226 m10.5% from 226 m to 230 m5.4% from 230 m to 233 m0.0% from 233 m to 237 m5.3% from 237 m to 241 m0.0% from 241 m to 245 m5.3% from 245 m to 249 m21.1% from 249 m to 253 m5.6% from 253 m to 256 m5.3% from 256 m to 260 m11.1% from 260 m to 264 m5.9% from 264 m to 267 m6.9% from 267 m to 270 m13.3% from 270 m to 273 m6.7% from 273 m to 276 m13.3% from 276 m to 279 m0.0% from 279 m to 282 m6.1% from 282 m to 285 m0.0% from 285 m to 289 m5.6% from 289 m to 293 m5.1% from 293 m to 296 m0.0% from 296 m to 300 m5.0% from 300 m to 304 m0.0% from 304 m to 308 m10.0% from 308 m to 312 m5.0% from 312 m to 316 m5.0% from 316 m to 320 m5.0% from 320 m to 324 m4.9% from 324 m to 329 m0.0% from 329 m to 333 m9.5% from 333 m to 337 m0.0% from 337 m to 341 m9.5% from 341 m to 345 m4.8% from 345 m to 349 m0.0% from 349 m to 354 m4.8% from 354 m to 358 m4.9% from 358 m to 362 m4.7% from 362 m to 366 m4.8% from 366 m to 370 m9.1% from 370 m to 375 m4.7% from 375 m to 379 m4.7% from 379 m to 383 m4.5% from 383 m to 388 m4.4% from 388 m to 392 m4.5% from 392 m to 397 m4.5% from 397 m to 401 m0.0% from 401 m to 405 m4.5% from 405 m to 410 m4.7% from 410 m to 414 m9.3% from 414 m to 418 m4.5% from 418 m to 423 m4.8% from 423 m to 427 m4.7% from 427 m to 431 m0.0% from 431 m to 436 m4.8% from 436 m to 440 m4.5% from 440 m to 444 m0.0% from 444 m to 449 m4.7% from 449 m to 453 m9.1% from 453 m to 457 m4.7% from 457 m to 462 m4.7% from 462 m to 466 m4.5% from 466 m to 470 m0.0% from 470 m to 475 m9.3% from 475 m to 479 m0.0% from 479 m to 483 m4.5% from 483 m to 488 m4.7% from 488 m to 492 m4.7% from 492 m to 496 m4.7% from 496 m to 501 m4.9% from 501 m to 505 m9.8% from 505 m to 509 m4.9% from 509 m to 513 m4.8% from 513 m to 517 m4.8% from 517 m to 521 m0.0% from 521 m to 526 m4.7% from 526 m to 530 m4.7% from 530 m to 534 m4.8% from 534 m to 538 m4.7% from 538 m to 543 m4.8% from 543 m to 547 m4.8% from 547 m to 551 m4.8% from 551 m to 555 m4.9% from 555 m to 559 m4.9% from 559 m to 563 m0.0% from 563 m to 568 m10.0% from 568 m to 572 m4.8% from 572 m to 576 m5.0% from 576 m to 580 m0.0% from 580 m to 584 m5.0% from 584 m to 588 m5.0% from 588 m to 592 m4.9% from 592 m to 596 m5.1% from 596 m to 600 m4.9% from 600 m to 604 m0.0% from 604 m to 608 m4.8% from 608 m to 612 m9.3% from 612 m to 617 m4.8% from 617 m to 621 m4.7% from 621 m to 625 m9.5% from 625 m to 629 m4.9% from 629 m to 633 m9.5% from 633 m to 638 m5.1% from 638 m to 641 m5.3% from 641 m to 645 m10.5% from 645 m to 649 m5.4% from 649 m to 653 m5.1% from 653 m to 657 m5.1% from 657 m to 661 m0.0% from 661 m to 665 m4.9% from 665 m to 669 m0.0% from 669 m to 673 m4.8% from 673 m to 677 m0.0% from 677 m to 681 m4.7% from 681 m to 686 m4.9% from 686 m to 690 m5.3% from 690 m to 694 m4.8% from 694 m to 698 m9.8% from 698 m to 702 m4.7% from 702 m to 706 m5.3% from 706 m to 710 m0.0% from 710 m to 714 m9.5% from 714 m to 718 m5.1% from 718 m to 722 m0.0% from 722 m to 726 m9.3% from 726 m to 731 m4.7% from 731 m to 735 m0.0% from 735 m to 739 m8.9% from 739 m to 744 m0.0% from 744 m to 748 m8.9% from 748 m to 753 m5.3% from 753 m to 756 m4.8% from 756 m to 761 m5.3% from 761 m to 764 m4.9% from 764 m to 768 m0.0% from 768 m to 773 m5.1% from 773 m to 776 m0.0% from 776 m to 781 m4.7% from 781 m to 785 m4.5% from 785 m to 789 m4.7% from 789 m to 794 m5.0% from 794 m to 798 m5.1% from 798 m to 802 m0.0% from 802 m to 805 m5.1% from 805 m to 809 m0.0% from 809 m to 813 m9.8% from 813 m to 818 m10.0% from 818 m to 822 m4.8% from 822 m to 826 m4.5% from 826 m to 830 m4.7% from 830 m to 834 m0.0% from 834 m to 839 m5.3% from 839 m to 842 m0.0% from 842 m to 846 m4.9% from 846 m to 850 m0.0% from 850 m to 854 m-5.0% from 854 m to 858 m0.0% from 858 m to 863 m0.0% from 863 m to 867 m0.0% from 867 m to 872 m-4.0% from 872 m to 877 m0.0% from 877 m to 882 m4.2% from 882 m to 887 m0.0% from 887 m to 891 m-6.7% from 891 m to 897 m-3.1% from 897 m to 904 m-5.8% from 904 m to 911 m0.0% from 911 m to 918 m-2.7% from 918 m to 925 m-2.7% from 925 m to 933 m-2.6% from 933 m to 941 m-2.5% from 941 m to 949 m-2.5% from 949 m to 957 m-2.5% from 957 m to 965 m0.0% from 965 m to 973 m0.0% from 973 m to 980 m0.0% from 980 m to 988 m0.0% from 988 m to 994 m0.0% from 994 m to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km2.8% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km3.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km3.4% from 1.0 km to 1.0 km7.3% from 1.0 km to 1.1 km7.7% from 1.1 km to 1.1 km4.2% from 1.1 km to 1.1 km4.3% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km18.2% from 1.1 km to 1.1 km5.6% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km10.0% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km11.4% from 1.1 km to 1.1 km5.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km6.2% from 1.1 km to 1.1 km6.7% from 1.1 km to 1.1 km11.8% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km5.9% from 1.1 km to 1.2 km5.4% from 1.2 km to 1.2 km10.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km4.9% from 1.2 km to 1.2 km5.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km12.5% from 1.2 km to 1.2 km6.7% from 1.2 km to 1.2 km12.9% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km10.8% from 1.2 km to 1.2 km5.3% from 1.2 km to 1.2 km5.1% from 1.2 km to 1.2 km10.3% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km5.3% from 1.2 km to 1.2 km11.1% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km5.3% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km5.6% from 1.2 km to 1.2 km6.1% from 1.2 km to 1.2 km5.4% from 1.2 km to 1.2 km5.1% from 1.2 km to 1.2 km4.9% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.3 km10.8% from 1.3 km to 1.3 km10.8% from 1.3 km to 1.3 km17.1% from 1.3 km to 1.3 km12.5% from 1.3 km to 1.3 km5.9% from 1.3 km to 1.3 km5.4% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km6.3% from 1.3 km to 1.3 km5.0% from 1.3 km to 1.3 km4.8% from 1.3 km to 1.3 km6%5%5%1%5%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.29 km / 0.80 miles
Elevation gain55.2 m / 181 ft
Average gradient4.3%
Maximum gradient12.8%
Elevation high82.4 m / 270 ft
Elevation low27.2 m / 89 ft
Climb difficulty score5,513.85

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Bayview Climb
East York, Toronto
1.29 km4.3%55 m
Bayview: Potts to Bobloblaw
East York, Toronto
1.3 km4.3%56 m
Pottery Road to Loblaws Parking
East York, Toronto
1.28 km4.2%54 m
PROPER Bayview Extension
East York, Toronto
1.31 km4.1%54 m
Bayview _Pottery Road to Parking lots
East York, Toronto
1.27 km4.1%52 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,021,444th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 14,286th most difficult cycling climb of all 55,671 climbs in Canada.

📉

Places 2,024th out of 18,309 cycling climbs in Ontario.

Ranks 64th out of 1,327 cycling climbs in Toronto.

Ranking 26th out of 229 cycling climbs in East York.

Useful Links

View this climb on other sites.

Google Street View
Strava