Toronto Railpath north early exit

📍
Sterling Road, Junction Triangle, Davenport, Old Toronto, Toronto, Golden Horseshoe, Ontario, M6R 2B7, Canada
UncategorisedFlag this climb

Map View

See exactly where Toronto Railpath north early exit sits on the map, with the route drawn in climb-gradient colors and start/finish markers showing the direction of travel.

km markers every
Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance2 km / 1.24 miles
Elevation gain11 m / 36 ft
Average gradient0.6%
Maximum gradient1.9%
Elevation high116.93 m / 384 ft
Elevation low105.83 m / 347 ft
Climb difficulty score1,101.1

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
West Toronto Railpath northbound
Junction Triangle, Old Toronto
2.16 km0.6%12 m
Railpath Northbound Bloor to Dupont
Junction Triangle, Old Toronto
1.06 km0.6%7 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,294,882nd out of 2,710,648 worldwide cycling climbs.

🧮

Ranked as the 43,532nd most difficult cycling climb of all 55,671 climbs in Canada.

📉

Places 12,833rd out of 18,309 cycling climbs in Ontario.

Ranks 456th out of 713 cycling climbs in Old Toronto.

🥈️

This is the second most difficult cycling climb in Junction Triangle.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb