Bridge to Side Rd 30

📍
Willow Creek Bridge, Brockton, Bruce County, Ontario, N0G 2N0, Canada

Useful Links

View this climb on other sites.

Google Street View
Strava

Climb Stats

The most common and useful climbing metrics.

Climb (Meters)72.9 m
Distance (Kilometers)4.19 km
Average Gradient0.7%
Climb CategoryUncategorised

Detailed Climb Stats

Stuff for climbing nerds.

Distance (Miles)2.61 miles
Distance (Raw)4,193.6 m
Elevation High269.7 m
Elevation Low224.1 m
Maximum Gradient12.3%
Climb Difficulty Score2,935.52

Social Climbing

All the important climbing popularity information.

💪

There are 283 recorded attempts by 189 individual cyclists.

📈

That's an average of 1.50 attempts per cyclist.

😞

No one has favourited this climb.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,553,681st out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 25,032nd most difficult cycling climb of all 55,671 climbs in Canada.

📉

Places 5,202nd out of 18,309 cycling climbs in Ontario.

Ranks 41st out of 187 cycling climbs in Bruce County.

🏵️

A local climb of note, this is the 7th most difficult cycling climb (out of 14 climbs) in Brockton.

The Latest Cycling News