Hill To Bridge

📍
Tuan Road, Parksville, Regional District of Nanaimo, British Columbia, V9P 1W3, Canada
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Hill To Bridge...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Hill To Bridge.

10 m20 m25 m35 m-2.0% from 0 m to 5 m-2.8% from 5 m to 9 m-4.8% from 9 m to 13 m-1.6% from 13 m to 19 m2.4% from 19 m to 23 m0.0% from 23 m to 27 m0.0% from 27 m to 31 m0.0% from 31 m to 35 m-2.2% from 35 m to 39 m-2.6% from 39 m to 47 m-2.9% from 47 m to 54 m-4.3% from 54 m to 61 m-3.0% from 61 m to 68 m-3.2% from 68 m to 74 m-2.4% from 74 m to 82 m-3.1% from 82 m to 92 m-2.3% from 92 m to 100 m-2.0% from 100 m to 110 m-3.1% from 110 m to 120 m-3.2% from 120 m to 129 m-2.7% from 129 m to 140 m-3.2% from 140 m to 150 m-3.2% from 150 m to 159 m-1.4% from 159 m to 166 m2.2% from 166 m to 175 m1.2% from 175 m to 184 m2.5% from 184 m to 192 m1.2% from 192 m to 200 m2.5% from 200 m to 208 m1.4% from 208 m to 215 m3.9% from 215 m to 223 m1.4% from 223 m to 230 m1.3% from 230 m to 238 m1.5% from 238 m to 244 m1.4% from 244 m to 252 m1.7% from 252 m to 257 m0.0% from 257 m to 265 m1.5% from 265 m to 272 m2.9% from 272 m to 279 m2.9% from 279 m to 286 m3.0% from 286 m to 292 m1.9% from 292 m to 298 m-1.5% from 298 m to 304 m1.5% from 304 m to 311 m0.0% from 311 m to 317 m1.4% from 317 m to 324 m3.1% from 324 m to 330 m7.1% from 330 m to 334 m1.4% from 334 m to 341 m1.7% from 341 m to 347 m0.0% from 347 m to 354 m0.0% from 354 m to 360 m3.0% from 360 m to 366 m3.5% from 366 m to 375 m3.3% from 375 m to 381 m2.9% from 381 m to 388 m1.9% from 388 m to 393 m2.9% from 393 m to 400 m3.3% from 400 m to 406 m0.0% from 406 m to 411 m-3.5% from 411 m to 420 m-2.1% from 420 m to 429 m-2.1% from 429 m to 434 m-1.5% from 434 m to 441 m-1.6% from 441 m to 447 m-4.3% from 447 m to 452 m0.0% from 452 m to 457 m-1.4% from 457 m to 464 m-1.5% from 464 m to 471 m-1.8% from 471 m to 477 m-2.0% from 477 m to 482 m-2.9% from 482 m to 489 m-3.9% from 489 m to 496 m-2.8% from 496 m to 503 m-4.1% from 503 m to 511 m-4.0% from 511 m to 518 m-6.0% from 518 m to 525 m-6.3% from 525 m to 531 m-6.5% from 531 m to 537 m-7.5% from 537 m to 544 m-6.3% from 544 m to 550 m-7.0% from 550 m to 556 m-6.2% from 556 m to 564 m-8.6% from 564 m to 572 m-5.5% from 572 m to 580 m2.8% from 580 m to 587 m1.6% from 587 m to 593 m1.3% from 593 m to 601 m1.4% from 601 m to 608 m0.0% from 608 m to 615 m1.6% from 615 m to 621 m3.0% from 621 m to 628 m3.9% from 628 m to 633 m5.3% from 633 m to 639 m4.1% from 639 m to 644 m4.6% from 644 m to 650 m4.1% from 650 m to 657 m2.9% from 657 m to 664 m5.8% from 664 m to 670 m3.8% from 670 m to 675 m5.4% from 675 m to 681 m4.3% from 681 m to 687 m4.5% from 687 m to 692 m4.3% from 692 m to 697 m6.0% from 697 m to 702 m0.0% from 702 m to 710 m2.4% from 710 m to 715 m0.0% from 715 m to 719 m0.0% from 719 m to 723 m2.3% from 723 m to 728 m2.8% from 728 m to 731 m2.6% from 731 m to 735 m2.6% from 735 m to 739 m5.1% from 739 m to 743 m0.0% from 743 m to 747 m0.0% from 747 m to 751 m0.0% from 751 m to 755 m0.0% from 755 m to 760 m0.0% from 760 m to 765 m2.2% from 765 m to 769 m2.3% from 769 m to 774 m0.0% from 774 m to 777 m2.3% from 777 m to 782 m0.0% from 782 m to 786 m0.0% from 786 m to 790 m0.0% from 790 m to 793 m0.0% from 793 m to 797 m0.0% from 797 m to 801 m0.0% from 801 m to 806 m2.2% from 806 m to 811 m1.2% from 811 m to 819 m2.0% from 819 m to 824 m1.9% from 824 m to 829 m2.5% from 829 m to 833 m2.3% from 833 m to 838 m2.4% from 838 m to 842 m2.4% from 842 m to 846 m4.5% from 846 m to 851 m1.9% from 851 m to 856 m1.6% from 856 m to 862 m1.9% from 862 m to 867 m1.6% from 867 m to 874 m2.3% from 874 m to 878 m0.0% from 878 m to 883 m2.3% from 883 m to 887 m0.0% from 887 m to 891 m0.0% from 891 m to 896 m0.0% from 896 m to 902 m0.0% from 902 m to 907 m-1.3% from 907 m to 915 m-1.4% from 915 m to 922 m0.0% from 922 m to 931 m0.0% from 931 m to 936 m0.0% from 936 m to 941 m1.7% from 941 m to 947 m0.0% from 947 m to 955 m1.3% from 955 m to 963 m3.0% from 963 m to 969 m2.5% from 969 m to 977 m1.8% from 977 m to 983 m2.8% from 983 m to 990 m3.5% from 990 m to 996 m-1.4% from 996 m to 1.0 km-1.6% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km1.0% from 1.0 km to 1.0 km-1.9% from 1.0 km to 1.0 km2.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.1 km1.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km1.6% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.5% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km3.2% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km2.5% from 1.1 km to 1.1 km2.9% from 1.1 km to 1.1 km2.1% from 1.1 km to 1.1 km4.1% from 1.1 km to 1.1 km1.8% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.1 km2.5% from 1.1 km to 1.1 km2.2% from 1.1 km to 1.2 km2.3% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km2.2% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-2.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km-1.6% from 1.2 km to 1.2 km-2.9% from 1.2 km to 1.2 km-1.8% from 1.2 km to 1.2 km-2.9% from 1.2 km to 1.2 km1.5% from 1.2 km to 1.2 km9.3% from 1.2 km to 1.3 km8.3% from 1.3 km to 1.3 km9.1% from 1.3 km to 1.3 km8.7% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km5.3% from 1.3 km to 1.3 km5.7% from 1.3 km to 1.3 km3.3% from 1.3 km to 1.3 km5.1% from 1.3 km to 1.3 km2.4% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km2.3% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km1.9% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.4 km-2.2% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km-3.3% from 1.4 km to 1.4 km-2.8% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km4.5% from 1.4 km to 1.4 km14.0% from 1.4 km to 1.4 km15.6% from 1.4 km to 1.4 km16.7% from 1.4 km to 1.4 km17.0% from 1.4 km to 1.4 km15.1% from 1.4 km to 1.4 km17.0% from 1.4 km to 1.4 km13.1% from 1.4 km to 1.4 km12.7% from 1.4 km to 1.4 km13.6% from 1.4 km to 1.4 km12.5% from 1.4 km to 1.4 km2.8% from 1.4 km to 1.4 km-3.1% from 1.4 km to 1.4 km-5.1% from 1.4 km to 1.5 km2.3% from 1.5 km to 1.5 km4.3% from 1.5 km to 1.5 km1.9% from 1.5 km to 1.5 km1.8% from 1.5 km to 1.5 km5.1% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km-8.5% from 1.5 km to 1.5 km-8.7% from 1.5 km to 1.5 km-1.7% from 1.5 km to 1.5 km-5.6% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km-2.9% from 1.5 km to 1.5 km2.0% from 1.5 km to 1.5 km-1%0%0%1%1%4%0 m250 m500 m750 m1 km1.3 km1.5 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.52 km / 0.94 miles
Elevation gain13.9 m / 46 ft
Average gradient0.9%
Maximum gradient16.4%
Elevation high34.7 m / 114 ft
Elevation low13.4 m / 44 ft
Climb difficulty score1,395.09

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,147,138th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 39,471st most difficult cycling climb of all 55,671 climbs in Canada.

📉

Places 14,150th out of 17,548 cycling climbs in British Columbia.

Ranks 488th out of 610 cycling climbs in Regional District of Nanaimo.

Ranking 17th out of 19 cycling climbs in Parksville.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb