Subida do Lixão

📍
Avenida Joaquim Romão Batista, Romeiro Aureliano Pereira, Padre Cícero, Juazeiro do Norte, Região Geográfica Imediata de Juazeiro do Norte, Região Geográfica Intermediária de Juazeiro do Norte, Ceará, Northeast Region, 63010-905, Brazil
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Subida do Lixão...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Subida do Lixão.

380 m400 m415 m435 m0.0% from 0 m to 6 m-1.6% from 6 m to 12 m1.2% from 12 m to 20 m1.3% from 20 m to 28 m0.0% from 28 m to 35 m1.6% from 35 m to 41 m0.0% from 41 m to 47 m1.6% from 47 m to 53 m1.5% from 53 m to 60 m1.6% from 60 m to 66 m1.6% from 66 m to 72 m0.0% from 72 m to 78 m1.5% from 78 m to 85 m1.7% from 85 m to 90 m2.4% from 90 m to 95 m1.9% from 95 m to 100 m1.4% from 100 m to 107 m1.5% from 107 m to 114 m1.9% from 114 m to 119 m1.5% from 119 m to 126 m3.6% from 126 m to 132 m5.0% from 132 m to 136 m5.0% from 136 m to 142 m5.9% from 142 m to 147 m5.4% from 147 m to 152 m5.7% from 152 m to 158 m3.9% from 158 m to 163 m5.3% from 163 m to 168 m4.6% from 168 m to 175 m5.1% from 175 m to 183 m5.9% from 183 m to 186 m4.9% from 186 m to 194 m3.9% from 194 m to 199 m5.4% from 199 m to 205 m5.3% from 205 m to 209 m4.2% from 209 m to 214 m4.6% from 214 m to 220 m4.0% from 220 m to 228 m4.5% from 228 m to 232 m3.9% from 232 m to 237 m4.1% from 237 m to 242 m3.9% from 242 m to 247 m4.4% from 247 m to 252 m3.8% from 252 m to 257 m2.6% from 257 m to 261 m5.2% from 261 m to 267 m3.8% from 267 m to 272 m3.8% from 272 m to 277 m3.8% from 277 m to 282 m4.2% from 282 m to 290 m4.8% from 290 m to 296 m4.0% from 296 m to 301 m5.5% from 301 m to 306 m3.3% from 306 m to 312 m5.7% from 312 m to 318 m4.4% from 318 m to 322 m4.9% from 322 m to 328 m3.5% from 328 m to 334 m5.4% from 334 m to 340 m3.7% from 340 m to 345 m4.9% from 345 m to 349 m4.2% from 349 m to 354 m5.8% from 354 m to 359 m6.1% from 359 m to 364 m3.8% from 364 m to 369 m3.9% from 369 m to 374 m5.6% from 374 m to 381 m4.2% from 381 m to 386 m6.0% from 386 m to 391 m5.6% from 391 m to 397 m4.3% from 397 m to 401 m6.1% from 401 m to 406 m5.5% from 406 m to 412 m5.9% from 412 m to 418 m5.8% from 418 m to 424 m6.5% from 424 m to 428 m4.4% from 428 m to 433 m5.0% from 433 m to 439 m6.7% from 439 m to 443 m6.1% from 443 m to 448 m7.7% from 448 m to 453 m6.2% from 453 m to 458 m4.9% from 458 m to 462 m7.8% from 462 m to 467 m7.7% from 467 m to 473 m6.3% from 473 m to 477 m5.9% from 477 m to 482 m6.9% from 482 m to 488 m6.2% from 488 m to 493 m7.0% from 493 m to 497 m5.9% from 497 m to 502 m4.4% from 502 m to 507 m2.3% from 507 m to 511 m2.9% from 511 m to 515 m2.3% from 515 m to 519 m3.0% from 519 m to 522 m2.5% from 522 m to 530 m4.5% from 530 m to 535 m2.4% from 535 m to 539 m1.7% from 539 m to 545 m1.4% from 545 m to 552 m2.6% from 552 m to 556 m2.2% from 556 m to 561 m2.9% from 561 m to 564 m3.0% from 564 m to 568 m2.6% from 568 m to 571 m0.0% from 571 m to 576 m5.4% from 576 m to 579 m0.0% from 579 m to 583 m3.9% from 583 m to 588 m1.8% from 588 m to 594 m3.2% from 594 m to 597 m0.0% from 597 m to 602 m0.0% from 602 m to 605 m0.0% from 605 m to 609 m2.6% from 609 m to 613 m-2.8% from 613 m to 617 m0.0% from 617 m to 620 m2.6% from 620 m to 624 m-2.2% from 624 m to 629 m-1.5% from 629 m to 635 m0.0% from 635 m to 638 m0.0% from 638 m to 642 m0.0% from 642 m to 645 m0.0% from 645 m to 649 m-2.7% from 649 m to 652 m0.0% from 652 m to 656 m-2.5% from 656 m to 660 m0.0% from 660 m to 664 m0.0% from 664 m to 670 m-2.3% from 670 m to 675 m-1.7% from 675 m to 681 m0.0% from 681 m to 685 m0.0% from 685 m to 689 m0.0% from 689 m to 692 m0.0% from 692 m to 696 m0.0% from 696 m to 700 m2.4% from 700 m to 704 m0.0% from 704 m to 710 m0.0% from 710 m to 714 m4.2% from 714 m to 718 m0.0% from 718 m to 724 m3.3% from 724 m to 730 m2.1% from 730 m to 734 m2.4% from 734 m to 738 m3.4% from 738 m to 744 m3.9% from 744 m to 752 m3.5% from 752 m to 758 m3.8% from 758 m to 763 m3.7% from 763 m to 768 m7.0% from 768 m to 773 m4.4% from 773 m to 777 m7.0% from 777 m to 781 m6.1% from 781 m to 786 m4.3% from 786 m to 791 m7.0% from 791 m to 795 m9.3% from 795 m to 800 m9.1% from 800 m to 804 m9.3% from 804 m to 808 m10.6% from 808 m to 813 m10.0% from 813 m to 818 m10.5% from 818 m to 822 m10.4% from 822 m to 827 m10.6% from 827 m to 831 m8.5% from 831 m to 837 m10.6% from 837 m to 842 m8.1% from 842 m to 846 m9.1% from 846 m to 850 m10.8% from 850 m to 854 m12.9% from 854 m to 857 m9.3% from 857 m to 862 m10.9% from 862 m to 867 m8.6% from 867 m to 870 m4.8% from 870 m to 875 m6.3% from 875 m to 879 m5.4% from 879 m to 885 m5.6% from 885 m to 890 m5.0% from 890 m to 894 m7.1% from 894 m to 899 m5.7% from 899 m to 902 m5.0% from 902 m to 906 m9.1% from 906 m to 912 m9.5% from 912 m to 916 m8.9% from 916 m to 920 m8.3% from 920 m to 924 m9.3% from 924 m to 928 m8.8% from 928 m to 934 m8.8% from 934 m to 937 m8.7% from 937 m to 942 m6.8% from 942 m to 946 m9.3% from 946 m to 951 m7.5% from 951 m to 955 m9.1% from 955 m to 959 m6.5% from 959 m to 964 m9.8% from 964 m to 968 m6.5% from 968 m to 972 m7.3% from 972 m to 978 m8.0% from 978 m to 983 m7.3% from 983 m to 987 m8.3% from 987 m to 990 m6.7% from 990 m to 996 m7.3% from 996 m to 1.0 km7.4% from 1.0 km to 1.0 km6.4% from 1.0 km to 1.0 km9.8% from 1.0 km to 1.0 km7.9% from 1.0 km to 1.0 km7.5% from 1.0 km to 1.0 km6.5% from 1.0 km to 1.0 km6.8% from 1.0 km to 1.0 km7.8% from 1.0 km to 1.0 km8.0% from 1.0 km to 1.0 km6.5% from 1.0 km to 1.1 km7.4% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km7.3% from 1.1 km to 1.1 km7.0% from 1.1 km to 1.1 km4.9% from 1.1 km to 1.1 km6.5% from 1.1 km to 1.1 km7.5% from 1.1 km to 1.1 km6.8% from 1.1 km to 1.1 km6.8% from 1.1 km to 1.1 km5.9% from 1.1 km to 1.1 km5.0% from 1.1 km to 1.1 km7.3% from 1.1 km to 1.1 km2.6% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3%5%1%8%6%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.12 km / 0.70 miles
Elevation gain50.8 m / 167 ft
Average gradient4.5%
Maximum gradient10.7%
Elevation high432 m / 1,417 ft
Elevation low381.8 m / 1,253 ft
Climb difficulty score5,049.45

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Horto Asfalto- PARTE 3
Padre Cícero, Juazeiro do Norte
0.87 km6.3%55 m
Subida do Loteamento
Padre Cícero, Juazeiro do Norte
0.87 km2.8%26 m
Horto Asfalto- PARTE 1
Padre Cícero, Juazeiro do Norte
0.75 km8.2%61 m
Horto Asfalto- PARTE 2
Padre Cícero, Juazeiro do Norte
0.67 km10.4%69 m
VILA 3 MARIAS ATE PALMEIRINHA
Padre Cícero, Juazeiro do Norte
4.96 km0.1%7 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,091,499th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 50,498th most difficult cycling climb of all 136,167 climbs in Brazil.

📉

Places 392nd out of 1,933 cycling climbs in Ceará.

Ranks 14th out of 66 cycling climbs in Juazeiro do Norte.

🏵️

A local climb of note, this is the 4th most difficult cycling climb (out of 6 climbs) in Padre Cícero.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb