Montée de la croix du français

📍
Abri 1 - Poteau Devèze, Poteau, Petit-Thier, Vielsalm, Bastogne, Luxembourg, Wallonia, 6692, Belgium
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Montée de la croix du français...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Montée de la croix du français.

460 m485 m510 m535 m1.7% from 0 m to 6 m3.4% from 6 m to 12 m1.7% from 12 m to 18 m3.3% from 18 m to 24 m1.7% from 24 m to 30 m3.3% from 30 m to 36 m1.6% from 36 m to 42 m3.2% from 42 m to 48 m1.6% from 48 m to 55 m6.3% from 55 m to 61 m6.2% from 61 m to 68 m3.1% from 68 m to 74 m1.5% from 74 m to 81 m1.5% from 81 m to 87 m3.0% from 87 m to 94 m1.5% from 94 m to 101 m1.5% from 101 m to 107 m2.9% from 107 m to 114 m2.9% from 114 m to 121 m4.3% from 121 m to 128 m8.8% from 128 m to 135 m7.5% from 135 m to 142 m4.6% from 142 m to 148 m3.1% from 148 m to 154 m3.1% from 154 m to 161 m7.9% from 161 m to 167 m9.5% from 167 m to 173 m9.4% from 173 m to 180 m6.3% from 180 m to 186 m4.6% from 186 m to 193 m3.0% from 193 m to 199 m3.1% from 199 m to 206 m7.6% from 206 m to 212 m9.2% from 212 m to 219 m6.2% from 219 m to 225 m10.8% from 225 m to 232 m3.1% from 232 m to 238 m1.6% from 238 m to 245 m3.1% from 245 m to 251 m3.2% from 251 m to 258 m3.2% from 258 m to 264 m4.7% from 264 m to 270 m4.7% from 270 m to 277 m9.4% from 277 m to 283 m10.8% from 283 m to 290 m4.8% from 290 m to 296 m3.1% from 296 m to 302 m3.2% from 302 m to 309 m4.7% from 309 m to 315 m6.5% from 315 m to 321 m8.1% from 321 m to 327 m9.8% from 327 m to 333 m8.1% from 333 m to 340 m4.9% from 340 m to 346 m3.3% from 346 m to 352 m3.3% from 352 m to 358 m6.7% from 358 m to 364 m10.0% from 364 m to 370 m10.3% from 370 m to 376 m8.6% from 376 m to 382 m7.0% from 382 m to 387 m8.6% from 387 m to 393 m10.7% from 393 m to 399 m10.5% from 399 m to 404 m3.5% from 404 m to 410 m3.5% from 410 m to 416 m3.4% from 416 m to 422 m3.5% from 422 m to 427 m3.6% from 427 m to 433 m8.6% from 433 m to 439 m10.9% from 439 m to 444 m7.1% from 444 m to 450 m7.3% from 450 m to 455 m3.6% from 455 m to 461 m3.7% from 461 m to 466 m3.6% from 466 m to 472 m7.3% from 472 m to 477 m9.1% from 477 m to 483 m8.9% from 483 m to 488 m3.6% from 488 m to 494 m3.6% from 494 m to 500 m3.6% from 500 m to 505 m3.6% from 505 m to 511 m3.6% from 511 m to 516 m3.7% from 516 m to 522 m7.4% from 522 m to 527 m9.3% from 527 m to 532 m7.5% from 532 m to 538 m3.7% from 538 m to 543 m3.8% from 543 m to 548 m3.7% from 548 m to 554 m1.8% from 554 m to 559 m5.5% from 559 m to 565 m7.1% from 565 m to 571 m12.7% from 571 m to 576 m9.1% from 576 m to 582 m3.7% from 582 m to 587 m5.6% from 587 m to 592 m3.7% from 592 m to 598 m5.5% from 598 m to 603 m9.4% from 603 m to 609 m11.3% from 609 m to 614 m11.3% from 614 m to 619 m3.9% from 619 m to 624 m3.9% from 624 m to 629 m4.1% from 629 m to 634 m2.1% from 634 m to 639 m8.5% from 639 m to 644 m11.1% from 644 m to 648 m8.7% from 648 m to 653 m10.9% from 653 m to 657 m6.4% from 657 m to 662 m4.2% from 662 m to 667 m6.0% from 667 m to 672 m7.7% from 672 m to 677 m14.8% from 677 m to 683 m9.3% from 683 m to 688 m3.7% from 688 m to 693 m5.7% from 693 m to 699 m9.4% from 699 m to 704 m7.7% from 704 m to 709 m7.5% from 709 m to 714 m7.5% from 714 m to 720 m9.8% from 720 m to 725 m4.0% from 725 m to 730 m6.1% from 730 m to 735 m4.3% from 735 m to 739 m11.1% from 739 m to 744 m8.9% from 744 m to 748 m11.1% from 748 m to 753 m6.7% from 753 m to 757 m4.5% from 757 m to 762 m4.3% from 762 m to 766 m4.3% from 766 m to 771 m4.3% from 771 m to 776 m4.0% from 776 m to 781 m3.9% from 781 m to 786 m9.6% from 786 m to 791 m11.3% from 791 m to 796 m3.8% from 796 m to 802 m3.8% from 802 m to 807 m2.0% from 807 m to 812 m4.2% from 812 m to 817 m4.3% from 817 m to 821 m4.3% from 821 m to 826 m8.5% from 826 m to 831 m8.5% from 831 m to 836 m10.6% from 836 m to 840 m8.7% from 840 m to 845 m6.8% from 845 m to 849 m4.5% from 849 m to 854 m4.9% from 854 m to 858 m5.0% from 858 m to 862 m7.5% from 862 m to 866 m7.7% from 866 m to 870 m10.0% from 870 m to 874 m11.9% from 874 m to 878 m11.6% from 878 m to 882 m4.4% from 882 m to 887 m4.4% from 887 m to 891 m4.3% from 891 m to 896 m4.3% from 896 m to 900 m13.6% from 900 m to 905 m11.4% from 905 m to 909 m9.1% from 909 m to 914 m4.8% from 914 m to 918 m4.5% from 918 m to 922 m4.3% from 922 m to 927 m8.3% from 927 m to 932 m10.0% from 932 m to 937 m9.3% from 937 m to 942 m7.3% from 942 m to 947 m3.6% from 947 m to 953 m3.7% from 953 m to 958 m1.9% from 958 m to 964 m4.1% from 964 m to 968 m4.2% from 968 m to 973 m4.3% from 973 m to 978 m6.5% from 978 m to 982 m8.5% from 982 m to 987 m8.2% from 987 m to 992 m3.8% from 992 m to 997 m3.7% from 997 m to 1.0 km3.7% from 1.0 km to 1.0 km1.8% from 1.0 km to 1.0 km3.8% from 1.0 km to 1.0 km3.8% from 1.0 km to 1.0 km2.0% from 1.0 km to 1.0 km6.4% from 1.0 km to 1.0 km9.1% from 1.0 km to 1.0 km6.7% from 1.0 km to 1.0 km4.4% from 1.0 km to 1.0 km4.3% from 1.0 km to 1.1 km4.1% from 1.1 km to 1.1 km2.0% from 1.1 km to 1.1 km3.8% from 1.1 km to 1.1 km9.1% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km12.3% from 1.1 km to 1.1 km12.1% from 1.1 km to 1.1 km5.2% from 1.1 km to 1.1 km3.3% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km3.4% from 1.1 km to 1.1 km8.5% from 1.1 km to 1.1 km8.6% from 1.1 km to 1.1 km5.2% from 1.1 km to 1.1 km8.8% from 1.1 km to 1.1 km5.2% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.1 km1.7% from 1.1 km to 1.2 km3.4% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km1.6% from 1.2 km to 1.2 km3.0% from 1.2 km to 1.2 km2.9% from 1.2 km to 1.2 km5.6% from 1.2 km to 1.2 km5.5% from 1.2 km to 1.2 km5.5% from 1.2 km to 1.2 km2.7% from 1.2 km to 1.2 km4.2% from 1.2 km to 1.2 km1.4% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km3.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.3 km1.6% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km-4.6% from 1.3 km to 1.3 km4%6%7%6%5%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.27 km / 0.79 miles
Elevation gain70.2 m / 230 ft
Average gradient5.5%
Maximum gradient10.4%
Elevation high534.1 m / 1,752 ft
Elevation low463.6 m / 1,521 ft
Climb difficulty score7,016.43

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Cote de Burtonville *new*
Petit-Thier, Bastogne
1.51 km5.4%81 m
Up from Grand Fond
Petit-Thier, Bastogne
0.96 km7.1%69 m
Tinseubois
Petit-Thier, Bastogne
0.92 km6.7%62 m
Au Grand Bois long
Petit-Thier, Bastogne
1.92 km4%77 m
côte de Petit-Thier
Petit-Thier, Bastogne
1.48 km3.3%48 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 844,489th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 10,540th most difficult cycling climb of all 64,909 climbs in Belgium.

📉

Places 2,519th out of 7,477 cycling climbs in Luxembourg.

Ranks 518th out of 1,481 cycling climbs in Bastogne.

Ranking 15th out of 32 cycling climbs in Petit-Thier.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb