MTB Retie singletrack

📍
Pontfortsedijk, Retie, Turnhout, Antwerp, Flanders, 2470, Belgium
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for MTB Retie singletrack...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of MTB Retie singletrack.

20 m25 m25 m30 m6.3% from 0 m to 3 m2.4% from 3 m to 7 m3.0% from 7 m to 11 m1.4% from 11 m to 18 m1.8% from 18 m to 24 m0.0% from 24 m to 29 m1.9% from 29 m to 35 m2.6% from 35 m to 38 m5.1% from 38 m to 42 m2.8% from 42 m to 46 m4.2% from 46 m to 48 m6.2% from 48 m to 51 m0.0% from 51 m to 53 m6.3% from 53 m to 55 m6.3% from 55 m to 56 m6.3% from 56 m to 58 m6.7% from 58 m to 59 m6.2% from 59 m to 61 m6.3% from 61 m to 63 m6.3% from 63 m to 64 m6.3% from 64 m to 66 m6.3% from 66 m to 67 m5.9% from 67 m to 77 m6.8% from 77 m to 85 m5.7% from 85 m to 88 m-2.1% from 88 m to 93 m-2.8% from 93 m to 97 m-3.4% from 97 m to 100 m-6.1% from 100 m to 103 m-6.1% from 103 m to 108 m-4.8% from 108 m to 114 m-5.5% from 114 m to 120 m-6.4% from 120 m to 124 m-5.7% from 124 m to 128 m-4.5% from 128 m to 132 m0.0% from 132 m to 137 m1.8% from 137 m to 143 m1.7% from 143 m to 149 m1.8% from 149 m to 154 m1.9% from 154 m to 160 m3.6% from 160 m to 165 m2.2% from 165 m to 170 m3.2% from 170 m to 173 m7.4% from 173 m to 176 m5.7% from 176 m to 179 m4.2% from 179 m to 181 m5.5% from 181 m to 189 m5.7% from 189 m to 196 m5.5% from 196 m to 201 m4.8% from 201 m to 205 m5.3% from 205 m to 209 m1.7% from 209 m to 215 m1.6% from 215 m to 221 m-8.0% from 221 m to 224 m0.0% from 224 m to 227 m2.1% from 227 m to 241 m2.8% from 241 m to 245 m0.0% from 245 m to 249 m1.3% from 249 m to 257 m0.0% from 257 m to 260 m1.9% from 260 m to 265 m0.0% from 265 m to 269 m1.7% from 269 m to 280 m0.0% from 280 m to 286 m1.7% from 286 m to 292 m0.0% from 292 m to 298 m-1.9% from 298 m to 303 m-2.3% from 303 m to 307 m-2.9% from 307 m to 311 m-5.3% from 311 m to 315 m-6.2% from 315 m to 319 m-3.7% from 319 m to 325 m-3.5% from 325 m to 331 m-3.4% from 331 m to 336 m-5.2% from 336 m to 342 m-4.3% from 342 m to 347 m-4.8% from 347 m to 351 m-2.4% from 351 m to 355 m0.0% from 355 m to 359 m0.0% from 359 m to 361 m0.0% from 361 m to 363 m0.0% from 363 m to 365 m0.0% from 365 m to 367 m-6.7% from 367 m to 370 m-2.3% from 370 m to 374 m-5.1% from 374 m to 380 m-3.2% from 380 m to 387 m-3.2% from 387 m to 393 m1.9% from 393 m to 398 m3.9% from 398 m to 403 m3.5% from 403 m to 409 m1.6% from 409 m to 415 m1.7% from 415 m to 421 m4.9% from 421 m to 427 m2.2% from 427 m to 431 m5.1% from 431 m to 435 m2.9% from 435 m to 439 m0.0% from 439 m to 443 m2.2% from 443 m to 447 m0.0% from 447 m to 453 m0.0% from 453 m to 459 m-2.0% from 459 m to 464 m-2.1% from 464 m to 468 m-4.8% from 468 m to 473 m-3.8% from 473 m to 478 m-1.6% from 478 m to 484 m-3.7% from 484 m to 489 m2.5% from 489 m to 493 m2.4% from 493 m to 497 m3.1% from 497 m to 501 m0.0% from 501 m to 503 m0.0% from 503 m to 506 m0.0% from 506 m to 507 m0.0% from 507 m to 509 m0.0% from 509 m to 511 m-4.5% from 511 m to 514 m-5.0% from 514 m to 516 m0.0% from 516 m to 518 m-4.8% from 518 m to 520 m0.0% from 520 m to 522 m0.0% from 522 m to 526 m-2.7% from 526 m to 537 m3.1% from 537 m to 540 m0.0% from 540 m to 543 m4.0% from 543 m to 546 m0.0% from 546 m to 548 m-3.7% from 548 m to 551 m0.0% from 551 m to 554 m-2.4% from 554 m to 558 m-1.9% from 558 m to 563 m-1.6% from 563 m to 569 m-1.6% from 569 m to 576 m-1.7% from 576 m to 581 m0.0% from 581 m to 587 m2.1% from 587 m to 592 m2.1% from 592 m to 596 m2.1% from 596 m to 601 m1.9% from 601 m to 606 m4.0% from 606 m to 611 m1.9% from 611 m to 616 m1.9% from 616 m to 622 m3.6% from 622 m to 627 m1.8% from 627 m to 633 m3.3% from 633 m to 639 m1.6% from 639 m to 645 m3.3% from 645 m to 651 m1.8% from 651 m to 656 m1.6% from 656 m to 663 m3.3% from 663 m to 669 m1.6% from 669 m to 675 m3.6% from 675 m to 680 m1.8% from 680 m to 686 m1.7% from 686 m to 692 m3.3% from 692 m to 698 m1.8% from 698 m to 704 m3.3% from 704 m to 710 m1.8% from 710 m to 715 m1.7% from 715 m to 721 m3.4% from 721 m to 727 m1.6% from 727 m to 733 m0.0% from 733 m to 739 m1.7% from 739 m to 745 m0.0% from 745 m to 751 m1.7% from 751 m to 757 m0.0% from 757 m to 762 m2.0% from 762 m to 767 m0.0% from 767 m to 773 m0.0% from 773 m to 779 m2.0% from 779 m to 784 m0.0% from 784 m to 789 m2.0% from 789 m to 794 m0.0% from 794 m to 798 m2.6% from 798 m to 802 m0.0% from 802 m to 806 m2.6% from 806 m to 810 m0.0% from 810 m to 814 m0.0% from 814 m to 817 m1.5% from 817 m to 824 m0.0% from 824 m to 829 m-2.0% from 829 m to 834 m-0.7% from 834 m to 848 m0.0% from 848 m to 854 m0.0% from 854 m to 859 m-4.2% from 859 m to 861 m0.0% from 861 m to 864 m-1.7% from 864 m to 870 m-1.6% from 870 m to 877 m-2.4% from 877 m to 881 m-1.4% from 881 m to 888 m-1.9% from 888 m to 893 m-1.6% from 893 m to 900 m-1.8% from 900 m to 905 m-1.7% from 905 m to 911 m-2.1% from 911 m to 916 m-2.9% from 916 m to 919 m3.6% from 919 m to 922 m0.0% from 922 m to 925 m0.0% from 925 m to 928 m3.3% from 928 m to 931 m0.0% from 931 m to 934 m1.9% from 934 m to 940 m1.8% from 940 m to 945 m1.7% from 945 m to 951 m2.1% from 951 m to 956 m0.0% from 956 m to 959 m2.3% from 959 m to 964 m0.0% from 964 m to 969 m0.0% from 969 m to 974 m-2.3% from 974 m to 978 m-2.3% from 978 m to 982 m-2.6% from 982 m to 986 m0.0% from 986 m to 990 m0.0% from 990 m to 993 m-2.9% from 993 m to 996 m0.0% from 996 m to 1.0 km0.0% from 1.0 km to 1.0 km-1.7% from 1.0 km to 1.0 km-2.4% from 1.0 km to 1.0 km-2.6% from 1.0 km to 1.0 km-2.6% from 1.0 km to 1.0 km-2.6% from 1.0 km to 1.0 km-2.3% from 1.0 km to 1.0 km-2.0% from 1.0 km to 1.0 km-3.5% from 1.0 km to 1.0 km-1.6% from 1.0 km to 1.0 km-3.6% from 1.0 km to 1.1 km-2.0% from 1.1 km to 1.1 km-2.2% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-1.7% from 1.1 km to 1.1 km-2.3% from 1.1 km to 1.1 km-2.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-2.7% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km3.1% from 1.1 km to 1.1 km2.7% from 1.1 km to 1.1 km2.3% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km-1.5% from 1.1 km to 1.1 km-3.2% from 1.1 km to 1.1 km-3.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km2.4% from 1.1 km to 1.2 km2.1% from 1.2 km to 1.2 km2%-1%1%-0%-1%0 m250 m500 m750 m1 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance1.16 km / 0.72 miles
Elevation gain10.9 m / 36 ft
Average gradient0.3%
Maximum gradient6.3%
Elevation high29 m / 95 ft
Elevation low22.8 m / 75 ft
Climb difficulty score346.83

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
🇧🇪 GRAVEL SECTION - MOLENDIJK (RETIE)
Retie, Turnhout
1.17 km0.6%7 m
watermolen-Prinsenpark dolomiet
Retie, Turnhout
1.19 km0.6%7 m
laatste golvend technisch deel VTT Retie
Retie, Turnhout
0.93 km0.2%17 m
Beverdonk - Kleineduinberg
Retie, Turnhout
2 km0.3%6 m
to postel
Retie, Turnhout
2.87 km0.2%6 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 2,691,134th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 64,357th most difficult cycling climb of all 64,909 climbs in Belgium.

📉

Places 1,721st out of 1,824 cycling climbs in Antwerp.

Ranks 726th out of 769 cycling climbs in Turnhout.

Ranking 15th out of 16 cycling climbs in Retie.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb