Djerri Grind #2

📍
Coimadai, Shire of Moorabool, Victoria, 3340, Australia
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Djerri Grind #2...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Djerri Grind #2.

255 m270 m290 m305 m19.0% from 0 m to 2 m19.0% from 2 m to 4 m20.0% from 4 m to 6 m28.6% from 6 m to 8 m22.2% from 8 m to 9 m0.0% from 9 m to 11 m0.0% from 11 m to 12 m0.0% from 12 m to 14 m0.0% from 14 m to 15 m0.0% from 15 m to 16 m30.8% from 16 m to 18 m26.7% from 18 m to 19 m100.0% from 19 m to 20 m40.0% from 20 m to 21 m30.8% from 21 m to 22 m0.0% from 22 m to 24 m0.0% from 24 m to 26 m30.8% from 26 m to 28 m28.6% from 28 m to 29 m44.4% from 29 m to 30 m23.5% from 30 m to 32 m28.6% from 32 m to 34 m0.0% from 34 m to 36 m0.0% from 36 m to 38 m0.0% from 38 m to 40 m0.0% from 40 m to 42 m20.0% from 42 m to 44 m28.6% from 44 m to 45 m30.8% from 45 m to 46 m28.6% from 46 m to 48 m22.2% from 48 m to 50 m0.0% from 50 m to 51 m0.0% from 51 m to 52 m0.0% from 52 m to 54 m0.0% from 54 m to 55 m0.0% from 55 m to 56 m0.0% from 56 m to 57 m0.0% from 57 m to 58 m0.0% from 58 m to 59 m0.0% from 59 m to 61 m0.0% from 61 m to 63 m0.0% from 63 m to 64 m0.0% from 64 m to 65 m20.0% from 65 m to 67 m23.5% from 67 m to 69 m18.2% from 69 m to 71 m28.6% from 71 m to 72 m22.2% from 72 m to 74 m0.0% from 74 m to 76 m0.0% from 76 m to 77 m0.0% from 77 m to 79 m22.2% from 79 m to 81 m50.0% from 81 m to 82 m40.0% from 82 m to 83 m23.5% from 83 m to 85 m23.5% from 85 m to 87 m0.0% from 87 m to 88 m0.0% from 88 m to 89 m23.5% from 89 m to 91 m26.7% from 91 m to 92 m36.4% from 92 m to 93 m30.8% from 93 m to 95 m30.8% from 95 m to 96 m0.0% from 96 m to 97 m0.0% from 97 m to 100 m0.0% from 100 m to 101 m0.0% from 101 m to 103 m0.0% from 103 m to 105 m0.0% from 105 m to 107 m0.0% from 107 m to 109 m0.0% from 109 m to 111 m0.0% from 111 m to 112 m0.0% from 112 m to 113 m0.0% from 113 m to 114 m150.0% from 114 m to 115 m50.0% from 115 m to 116 m23.5% from 116 m to 117 m30.8% from 117 m to 119 m26.7% from 119 m to 120 m0.0% from 120 m to 122 m0.0% from 122 m to 124 m0.0% from 124 m to 125 m0.0% from 125 m to 126 m0.0% from 126 m to 127 m36.4% from 127 m to 128 m35.3% from 128 m to 129 m33.3% from 129 m to 131 m28.6% from 131 m to 132 m23.5% from 132 m to 134 m0.0% from 134 m to 135 m0.0% from 135 m to 137 m0.0% from 137 m to 138 m0.0% from 138 m to 139 m0.0% from 139 m to 140 m0.0% from 140 m to 141 m0.0% from 141 m to 143 m25.0% from 143 m to 145 m23.5% from 145 m to 146 m23.5% from 146 m to 148 m18.2% from 148 m to 150 m23.5% from 150 m to 152 m0.0% from 152 m to 153 m0.0% from 153 m to 154 m0.0% from 154 m to 154 m100.0% from 154 m to 155 m25.0% from 155 m to 156 m40.0% from 156 m to 157 m36.4% from 157 m to 158 m36.4% from 158 m to 159 m0.0% from 159 m to 161 m0.0% from 161 m to 163 m0.0% from 163 m to 165 m22.2% from 165 m to 166 m72.7% from 166 m to 167 m22.2% from 167 m to 169 m30.8% from 169 m to 171 m0.0% from 171 m to 172 m0.0% from 172 m to 173 m0.0% from 173 m to 174 m0.0% from 174 m to 175 m33.3% from 175 m to 177 m44.4% from 177 m to 178 m23.5% from 178 m to 179 m22.2% from 179 m to 181 m26.7% from 181 m to 183 m0.0% from 183 m to 184 m0.0% from 184 m to 184 m0.0% from 184 m to 186 m0.0% from 186 m to 187 m0.0% from 187 m to 189 m0.0% from 189 m to 191 m22.2% from 191 m to 192 m31.6% from 192 m to 194 m28.6% from 194 m to 196 m46.2% from 196 m to 197 m33.3% from 197 m to 198 m0.0% from 198 m to 200 m0.0% from 200 m to 201 m266.7% from 201 m to 202 m28.6% from 202 m to 203 m25.0% from 203 m to 205 m120.0% from 205 m to 205 m0.0% from 205 m to 207 m0.0% from 207 m to 208 m36.4% from 208 m to 209 m80.0% from 209 m to 209 m28.6% from 209 m to 211 m200.0% from 211 m to 211 m26.7% from 211 m to 212 m0.0% from 212 m to 214 m0.0% from 214 m to 215 m0.0% from 215 m to 216 m0.0% from 216 m to 218 m0.0% from 218 m to 218 m0.0% from 218 m to 219 m100.0% from 219 m to 220 m28.6% from 220 m to 221 m23.5% from 221 m to 223 m21.1% from 223 m to 225 m44.4% from 225 m to 225 m0.0% from 225 m to 227 m0.0% from 227 m to 229 m0.0% from 229 m to 230 m0.0% from 230 m to 231 m0.0% from 231 m to 233 m0.0% from 233 m to 235 m0.0% from 235 m to 236 m0.0% from 236 m to 238 m0.0% from 238 m to 238 m0.0% from 238 m to 240 m0.0% from 240 m to 241 m0.0% from 241 m to 243 m0.0% from 243 m to 244 m0.0% from 244 m to 246 m0.0% from 246 m to 247 m0.0% from 247 m to 248 m0.0% from 248 m to 249 m0.0% from 249 m to 251 m0.0% from 251 m to 253 m0.0% from 253 m to 255 m0.0% from 255 m to 257 m0.0% from 257 m to 259 m0.0% from 259 m to 261 m0.0% from 261 m to 263 m0.0% from 263 m to 264 m0.0% from 264 m to 264 m0.0% from 264 m to 266 m0.0% from 266 m to 267 m0.0% from 267 m to 270 m0.0% from 270 m to 271 m0.0% from 271 m to 273 m0.0% from 273 m to 275 m0.0% from 275 m to 278 m22.2% from 278 m to 279 m18.2% from 279 m to 282 m18.2% from 282 m to 284 m33.3% from 284 m to 285 m28.6% from 285 m to 286 m0.0% from 286 m to 288 m0.0% from 288 m to 290 m0.0% from 290 m to 292 m42.9% from 292 m to 293 m66.7% from 293 m to 294 m19.0% from 294 m to 296 m20.0% from 296 m to 298 m20.0% from 298 m to 300 m0.0% from 300 m to 302 m0.0% from 302 m to 304 m0.0% from 304 m to 305 m0.0% from 305 m to 307 m53.3% from 307 m to 309 m26.7% from 309 m to 310 m21.1% from 310 m to 312 m25.0% from 312 m to 314 m0.0% from 314 m to 316 m0.0% from 316 m to 318 m0.0% from 318 m to 319 m0.0% from 319 m to 320 m66.7% from 320 m to 321 m33.3% from 321 m to 322 m28.6% from 322 m to 324 m33.3% from 324 m to 325 m42.9% from 325 m to 326 m0.0% from 326 m to 328 m0.0% from 328 m to 329 m0.0% from 329 m to 331 m0.0% from 331 m to 332 m0.0% from 332 m to 334 m0.0% from 334 m to 336 m0.0% from 336 m to 338 m0.0% from 338 m to 339 m0.0% from 339 m to 341 m0.0% from 341 m to 342 m0.0% from 342 m to 344 m0.0% from 344 m to 346 m0.0% from 346 m to 349 m22.2% from 349 m to 350 m19.0% from 350 m to 353 m21.1% from 353 m to 354 m22.2% from 354 m to 356 m25.0% from 356 m to 358 m0.0% from 358 m to 359 m0.0% from 359 m to 361 m0.0% from 361 m to 362 m0.0% from 362 m to 364 m0.0% from 364 m to 366 m0.0% from 366 m to 371 m0.0% from 371 m to 375 m0.0% from 375 m to 377 m0.0% from 377 m to 379 m0.0% from 379 m to 381 m0.0% from 381 m to 382 m0.0% from 382 m to 384 m0.0% from 384 m to 385 m40.0% from 385 m to 386 m40.0% from 386 m to 387 m54.5% from 387 m to 388 m30.8% from 388 m to 389 m22.2% from 389 m to 391 m15%15%11%9%0 m100 m200 m300 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.39 km / 0.24 miles
Elevation gain49 m / 161 ft
Average gradient12.5%
Maximum gradient46.3%
Elevation high304.8 m / 1,000 ft
Elevation low255.8 m / 839 ft
Climb difficulty score4,900.48

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Lung Buster
Coimadai, Shire of Moorabool
0.4 km8.3%34 m
DRC Climb Two
Coimadai, Shire of Moorabool
0.38 km5.1%19 m
Djerri Grind #3
Coimadai, Shire of Moorabool
0.76 km8.4%64 m
Lot 69 Seereys Track Climb
Coimadai, Shire of Moorabool
1.05 km8.6%90 m
DRC Climb 1 Full
Coimadai, Shire of Moorabool
0.82 km4.2%34 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,115,530th out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 29,568th most difficult cycling climb of all 97,639 climbs in Australia.

📉

Places 7,704th out of 25,936 cycling climbs in Victoria.

Ranks 20th out of 52 cycling climbs in Shire of Moorabool.

🏵️

A local climb of note, this is the 5th most difficult cycling climb (out of 12 climbs) in Coimadai.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb