Stitch up

📍
23, Accrington Place, Chapel Hill, Brisbane City, Queensland, 4069, Australia
UncategorisedFlag this climb

Estimated Climb Time

Loading your rider settings for Stitch up...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Stitch up.

75 m95 m110 m130 m0.0% from 0 m to 1 m15.4% from 1 m to 2 m0.0% from 2 m to 2 m50.0% from 2 m to 5 m100.0% from 5 m to 5 m20.0% from 5 m to 8 m18.5% from 8 m to 11 m17.6% from 11 m to 13 m23.5% from 13 m to 14 m25.0% from 14 m to 16 m25.0% from 16 m to 16 m50.0% from 16 m to 17 m29.4% from 17 m to 19 m35.7% from 19 m to 20 m38.9% from 20 m to 22 m33.3% from 22 m to 22 m150.0% from 22 m to 22 m23.1% from 22 m to 24 m55.6% from 24 m to 24 m20.0% from 24 m to 25 m37.5% from 25 m to 26 m35.7% from 26 m to 28 m33.3% from 28 m to 30 m35.7% from 30 m to 31 m26.3% from 31 m to 33 m18.7% from 33 m to 35 m33.3% from 35 m to 36 m23.1% from 36 m to 38 m22.6% from 38 m to 41 m28.6% from 41 m to 43 m22.2% from 43 m to 48 m23.1% from 48 m to 49 m22.2% from 49 m to 51 m25.0% from 51 m to 54 m21.4% from 54 m to 55 m22.2% from 55 m to 56 m25.0% from 56 m to 58 m21.4% from 58 m to 60 m19.2% from 60 m to 62 m25.0% from 62 m to 63 m100.0% from 63 m to 63 m28.6% from 63 m to 64 m22.2% from 64 m to 66 m19.0% from 66 m to 68 m100.0% from 68 m to 68 m20.0% from 68 m to 69 m25.0% from 69 m to 70 m21.7% from 70 m to 72 m16.7% from 72 m to 75 m14.3% from 75 m to 78 m13.3% from 78 m to 80 m18.2% from 80 m to 81 m11.1% from 81 m to 82 m16.7% from 82 m to 82 m7.1% from 82 m to 84 m50.0% from 84 m to 84 m130.8% from 84 m to 85 m7.7% from 85 m to 86 m0.0% from 86 m to 88 m7.7% from 88 m to 89 m10.0% from 89 m to 93 m6.2% from 93 m to 95 m7.7% from 95 m to 96 m9.1% from 96 m to 97 m7.1% from 97 m to 98 m0.0% from 98 m to 99 m33.3% from 99 m to 99 m5.3% from 99 m to 101 m9.1% from 101 m to 103 m6.3% from 103 m to 105 m12.5% from 105 m to 107 m4.2% from 107 m to 109 m8.7% from 109 m to 111 m9.5% from 111 m to 113 m10.5% from 113 m to 115 m7.7% from 115 m to 117 m6.7% from 117 m to 118 m8.0% from 118 m to 121 m6.7% from 121 m to 124 m7.7% from 124 m to 125 m10.0% from 125 m to 127 m4.3% from 127 m to 129 m9.5% from 129 m to 131 m8.0% from 131 m to 134 m3.6% from 134 m to 137 m9.1% from 137 m to 139 m5.9% from 139 m to 141 m0.0% from 141 m to 142 m9.1% from 142 m to 144 m0.0% from 144 m to 145 m5.9% from 145 m to 146 m10.5% from 146 m to 148 m3.3% from 148 m to 151 m5.9% from 151 m to 153 m7.7% from 153 m to 154 m16.7% from 154 m to 155 m0.0% from 155 m to 156 m0.0% from 156 m to 156 m9.1% from 156 m to 157 m9.1% from 157 m to 158 m6.7% from 158 m to 160 m6.2% from 160 m to 161 m7.7% from 161 m to 163 m8.3% from 163 m to 164 m9.1% from 164 m to 165 m0.0% from 165 m to 165 m9.5% from 165 m to 167 m8.0% from 167 m to 170 m16.7% from 170 m to 171 m10.0% from 171 m to 173 m11.1% from 173 m to 174 m0.0% from 174 m to 175 m11.8% from 175 m to 177 m15.4% from 177 m to 178 m12.5% from 178 m to 181 m17.6% from 181 m to 183 m16.7% from 183 m to 185 m16.7% from 185 m to 186 m17.9% from 186 m to 189 m16.1% from 189 m to 192 m18.7% from 192 m to 195 m16.7% from 195 m to 197 m23.8% from 197 m to 199 m18.5% from 199 m to 202 m20.0% from 202 m to 203 m20.0% from 203 m to 205 m25.0% from 205 m to 206 m16.7% from 206 m to 207 m30.8% from 207 m to 208 m50.0% from 208 m to 208 m22.7% from 208 m to 211 m100.0% from 211 m to 211 m20.0% from 211 m to 213 m16.7% from 213 m to 213 m100.0% from 213 m to 213 m25.0% from 213 m to 215 m20.0% from 215 m to 217 m22.2% from 217 m to 218 m29.4% from 218 m to 219 m16.7% from 219 m to 220 m23.8% from 220 m to 223 m16.7% from 223 m to 224 m21.4% from 224 m to 225 m16.7% from 225 m to 226 m20.0% from 226 m to 226 m22.2% from 226 m to 227 m20.0% from 227 m to 229 m15.8% from 229 m to 231 m17.6% from 231 m to 233 m11.8% from 233 m to 234 m25.0% from 234 m to 235 m12.5% from 235 m to 236 m16.7% from 236 m to 237 m16.7% from 237 m to 239 m13.0% from 239 m to 242 m14.3% from 242 m to 244 m12.5% from 244 m to 245 m12.5% from 245 m to 247 m17.6% from 247 m to 249 m12.5% from 249 m to 250 m12.5% from 250 m to 252 m12.5% from 252 m to 253 m9.1% from 253 m to 256 m8.7% from 256 m to 258 m10.5% from 258 m to 260 m11.8% from 260 m to 261 m11.1% from 261 m to 262 m9.1% from 262 m to 263 m0.0% from 263 m to 264 m21.4% from 264 m to 267 m10.5% from 267 m to 269 m-29.4% from 269 m to 270 m-25.0% from 270 m to 280 m-27.5% from 280 m to 295 m-27.9% from 295 m to 299 m-28.0% from 299 m to 304 m-26.7% from 304 m to 310 m-27.9% from 310 m to 317 m-26.9% from 317 m to 325 m-28.8% from 325 m to 332 m-26.9% from 332 m to 342 m-25.2% from 342 m to 353 m-21.4% from 353 m to 363 m-19.8% from 363 m to 373 m-17.3% from 373 m to 381 m-16.8% from 381 m to 393 m-16.5% from 393 m to 403 m-16.8% from 403 m to 412 m-18.9% from 412 m to 421 m-20.7% from 421 m to 429 m-22.6% from 429 m to 436 m-26.3% from 436 m to 441 m-22.7% from 441 m to 446 m-24.2% from 446 m to 452 m-22.2% from 452 m to 456 m-26.5% from 456 m to 460 m-25.0% from 460 m to 463 m-14.1% from 463 m to 472 m-4.3% from 472 m to 490 m6.3% from 490 m to 498 m11.1% from 498 m to 504 m7.9% from 504 m to 507 m4.2% from 507 m to 510 m9.1% from 510 m to 512 m0.0% from 512 m to 514 m17.1% from 514 m to 517 m0.0% from 517 m to 518 m-7.7% from 518 m to 519 m-2.0% from 519 m to 524 m-4.6% from 524 m to 531 m-7.3% from 531 m to 543 m-10.2% from 543 m to 549 m-11.2% from 549 m to 567 m-12.8% from 567 m to 587 m-12.1% from 587 m to 599 m-2.7% from 599 m to 610 m5.4% from 610 m to 621 m13.6% from 621 m to 627 m16.0% from 627 m to 629 m17.4% from 629 m to 632 m23.8% from 632 m to 634 m18.7% from 634 m to 635 m18.7% from 635 m to 637 m20.0% from 637 m to 641 m19.0% from 641 m to 643 m20.0% from 643 m to 645 m23.1% from 645 m to 646 m21.1% from 646 m to 648 m20.0% from 648 m to 649 m20.0% from 649 m to 651 m25.0% from 651 m to 652 m12.5% from 652 m to 653 m27.3% from 653 m to 654 m15.4% from 654 m to 655 m21.2% from 655 m to 662 m21.4% from 662 m to 663 m25.0% from 663 m to 664 m21.4% from 664 m to 666 m25.0% from 666 m to 667 m22.2% from 667 m to 667 m16.7% from 667 m to 669 m24.0% from 669 m to 671 m16.7% from 671 m to 672 m28.6% from 672 m to 672 m20.7% from 672 m to 675 m20.0% from 675 m to 677 m33.3% from 677 m to 678 m0.0% from 678 m to 678 m18.2% from 678 m to 679 m15.8% from 679 m to 681 m20.0% from 681 m to 682 m14.3% from 682 m to 683 m16.7% from 683 m to 684 m20.0% from 684 m to 685 m50.0% from 685 m to 685 m37.5% from 685 m to 686 m900.0% from 686 m to 686 m4.2% from 686 m to 688 m0.0% from 688 m to 689 m24.1% from 689 m to 692 m4.3% from 692 m to 694 m2.0% from 694 m to 699 m3.0% from 699 m to 702 m3.8% from 702 m to 708 m4.3% from 708 m to 712 m0.0% from 712 m to 713 m7.7% from 713 m to 714 m4.9% from 714 m to 722 m7.9% from 722 m to 726 m8.7% from 726 m to 729 m8.0% from 729 m to 731 m6.2% from 731 m to 733 m10.0% from 733 m to 736 m8.7% from 736 m to 740 m10.6% from 740 m to 745 m9.1% from 745 m to 748 m14.8% from 748 m to 751 m9.5% from 751 m to 753 m14.8% from 753 m to 756 m11.1% from 756 m to 758 m15.0% from 758 m to 760 m17.6% from 760 m to 762 m15.8% from 762 m to 764 m11.8% from 764 m to 766 m22.2% from 766 m to 767 m14.3% from 767 m to 768 m18.2% from 768 m to 769 m0.0% from 769 m to 770 m50.0% from 770 m to 770 m37.5% from 770 m to 771 m9.1% from 771 m to 772 m0.0% from 772 m to 772 m15.8% from 772 m to 774 m16.0% from 774 m to 777 m100.0% from 777 m to 777 m13.0% from 777 m to 779 m14.3% from 779 m to 781 m14.3% from 781 m to 781 m21.4% from 781 m to 783 m6.7% from 783 m to 784 m0.0% from 784 m to 785 m20.0% from 785 m to 785 m25.0% from 785 m to 786 m25.0% from 786 m to 786 m7.4% from 786 m to 789 m4.8% from 789 m to 791 m3.4% from 791 m to 794 m0.0% from 794 m to 797 m4.0% from 797 m to 799 m0.0% from 799 m to 804 m-3.6% from 804 m to 810 m-3.8% from 810 m to 815 m17%-18%5%9%0 m250 m500 m750 m
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryUncategorised
Distance0.81 km / 0.51 miles
Elevation gain17.9 m / 59 ft
Average gradient2.2%
Maximum gradient37.3%
Elevation high129.2 m / 424 ft
Elevation low76.2 m / 250 ft
Climb difficulty score1,792.56

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Chapel Hill rd to Lookout trail
Chapel Hill, Brisbane City
1 km2.3%23 m
Chapel Hill to Russell Terace
Chapel Hill, Brisbane City
1.06 km2.1%23 m
Marmindie to Russell Tce
Chapel Hill, Brisbane City
1.05 km2.8%29 m
Binaludlow
Chapel Hill, Brisbane City
1.02 km2.9%30 m
LHC Dillingen Bielby 1.4k
Chapel Hill, Brisbane City
1.37 km2.2%30 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 1,964,782nd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 62,321st most difficult cycling climb of all 97,639 climbs in Australia.

📉

Places 10,100th out of 16,668 cycling climbs in Queensland.

Ranks 1,456th out of 2,822 cycling climbs in Brisbane City.

Ranking 33rd out of 44 cycling climbs in Chapel Hill.

Useful Links

View this climb on other sites.

Google Street View
Strava

Something wrong with this listing? Help keep BikeClimbs accurate.

Flag this climb