Thames to Top

📍
Blue Hills East Fire Trail, Green Point, Gosford, Central Coast Council, New South Wales, 2251, Australia
Cat. 4

Estimated Climb Time

Loading your rider settings for Thames to Top...

Save your rider settings to unlock climb-time estimates and the effort table below.

Climb Profile

Altitude builds left to right while colour shows gradient severity for each part of Thames to Top.

85 m120 m150 m185 m0.0% from 0 m to 6 m0.0% from 6 m to 11 m0.0% from 11 m to 21 m0.0% from 21 m to 33 m-1.8% from 33 m to 45 m-2.7% from 45 m to 52 m-5.0% from 52 m to 56 m0.0% from 56 m to 60 m-2.9% from 60 m to 66 m2.6% from 66 m to 74 m-2.9% from 74 m to 81 m0.0% from 81 m to 87 m0.0% from 87 m to 96 m0.0% from 96 m to 105 m2.8% from 105 m to 112 m0.0% from 112 m to 118 m0.0% from 118 m to 124 m3.3% from 124 m to 130 m0.0% from 130 m to 138 m0.0% from 138 m to 145 m-2.9% from 145 m to 152 m0.0% from 152 m to 160 m0.0% from 160 m to 168 m0.0% from 168 m to 173 m-5.1% from 173 m to 176 m0.0% from 176 m to 184 m0.0% from 184 m to 191 m0.0% from 191 m to 200 m0.0% from 200 m to 203 m6.5% from 203 m to 206 m6.7% from 206 m to 212 m3.4% from 212 m to 218 m3.4% from 218 m to 224 m0.0% from 224 m to 227 m0.0% from 227 m to 230 m6.7% from 230 m to 236 m8.9% from 236 m to 240 m10.0% from 240 m to 242 m0.0% from 242 m to 244 m8.7% from 244 m to 247 m8.7% from 247 m to 249 m4.5% from 249 m to 253 m2000.0% from 253 m to 254 m0.0% from 254 m to 263 m0.0% from 263 m to 267 m0.0% from 267 m to 272 m0.0% from 272 m to 279 m0.0% from 279 m to 288 m-3.1% from 288 m to 301 m-3.5% from 301 m to 312 m-5.3% from 312 m to 320 m0.0% from 320 m to 325 m-4.3% from 325 m to 329 m-9.1% from 329 m to 334 m-6.9% from 334 m to 339 m-6.6% from 339 m to 352 m-4.0% from 352 m to 357 m0.0% from 357 m to 361 m-2.4% from 361 m to 369 m-5.4% from 369 m to 377 m0.0% from 377 m to 383 m0.0% from 383 m to 387 m0.0% from 387 m to 392 m0.0% from 392 m to 398 m8.3% from 398 m to 403 m11.5% from 403 m to 408 m0.0% from 408 m to 415 m6.7% from 415 m to 421 m6.7% from 421 m to 424 m8.0% from 424 m to 426 m11.1% from 426 m to 432 m3.2% from 432 m to 438 m6.5% from 438 m to 441 m0.0% from 441 m to 444 m6.0% from 444 m to 454 m1.9% from 454 m to 465 m2.8% from 465 m to 472 m4.0% from 472 m to 482 m0.0% from 482 m to 488 m0.0% from 488 m to 495 m0.0% from 495 m to 507 m-3.9% from 507 m to 512 m0.0% from 512 m to 517 m-4.3% from 517 m to 522 m-9.5% from 522 m to 526 m0.0% from 526 m to 532 m0.0% from 532 m to 538 m2.6% from 538 m to 545 m0.0% from 545 m to 552 m0.0% from 552 m to 557 m0.0% from 557 m to 562 m4.3% from 562 m to 567 m0.0% from 567 m to 572 m10.3% from 572 m to 578 m11.1% from 578 m to 583 m4.3% from 583 m to 588 m3.6% from 588 m to 594 m4.3% from 594 m to 598 m9.1% from 598 m to 605 m13.3% from 605 m to 608 m14.3% from 608 m to 611 m4.8% from 611 m to 615 m5.4% from 615 m to 618 m0.0% from 618 m to 622 m11.8% from 622 m to 624 m0.0% from 624 m to 626 m11.1% from 626 m to 627 m13.3% from 627 m to 629 m5.9% from 629 m to 632 m17.1% from 632 m to 636 m0.0% from 636 m to 637 m22.2% from 637 m to 639 m11.4% from 639 m to 643 m8.3% from 643 m to 645 m8.0% from 645 m to 648 m15.7% from 648 m to 653 m8.7% from 653 m to 655 m6.7% from 655 m to 658 m7.4% from 658 m to 661 m0.0% from 661 m to 663 m0.0% from 663 m to 667 m8.0% from 667 m to 672 m7.7% from 672 m to 678 m4.1% from 678 m to 683 m11.5% from 683 m to 688 m6.7% from 688 m to 691 m6.9% from 691 m to 694 m0.0% from 694 m to 700 m6.6% from 700 m to 706 m3.1% from 706 m to 712 m-3.1% from 712 m to 719 m6.9% from 719 m to 724 m3.6% from 724 m to 730 m2.9% from 730 m to 737 m0.0% from 737 m to 742 m8.7% from 742 m to 746 m6.8% from 746 m to 752 m9.8% from 752 m to 758 m7.4% from 758 m to 761 m8.3% from 761 m to 763 m20.4% from 763 m to 768 m11.4% from 768 m to 772 m5.9% from 772 m to 775 m11.4% from 775 m to 779 m5.4% from 779 m to 782 m11.4% from 782 m to 789 m7.5% from 789 m to 795 m8.0% from 795 m to 800 m0.0% from 800 m to 802 m0.0% from 802 m to 804 m0.0% from 804 m to 809 m8.6% from 809 m to 816 m13.3% from 816 m to 822 m28.6% from 822 m to 824 m21.1% from 824 m to 826 m10.8% from 826 m to 830 m8.7% from 830 m to 832 m8.3% from 832 m to 835 m4.1% from 835 m to 839 m16.0% from 839 m to 844 m8.3% from 844 m to 849 m4.5% from 849 m to 854 m9.1% from 854 m to 858 m6.9% from 858 m to 861 m13.3% from 861 m to 862 m0.0% from 862 m to 864 m12.1% from 864 m to 867 m26.7% from 867 m to 869 m40.0% from 869 m to 870 m9.1% from 870 m to 872 m6.7% from 872 m to 875 m0.0% from 875 m to 877 m0.0% from 877 m to 879 m5.1% from 879 m to 883 m0.0% from 883 m to 887 m5.7% from 887 m to 890 m0.0% from 890 m to 894 m5.4% from 894 m to 897 m11.1% from 897 m to 901 m11.1% from 901 m to 904 m5.7% from 904 m to 908 m0.0% from 908 m to 911 m10.8% from 911 m to 915 m0.0% from 915 m to 917 m10.0% from 917 m to 919 m10.0% from 919 m to 923 m8.9% from 923 m to 927 m8.7% from 927 m to 930 m9.1% from 930 m to 932 m4.5% from 932 m to 936 m4.8% from 936 m to 940 m9.5% from 940 m to 945 m0.0% from 945 m to 947 m9.1% from 947 m to 949 m9.1% from 949 m to 953 m14.0% from 953 m to 958 m4.7% from 958 m to 962 m4.8% from 962 m to 966 m0.0% from 966 m to 971 m9.1% from 971 m to 975 m9.1% from 975 m to 979 m9.5% from 979 m to 984 m4.8% from 984 m to 988 m9.5% from 988 m to 990 m0.0% from 990 m to 992 m5.0% from 992 m to 996 m5.3% from 996 m to 1000 m5.1% from 1000 m to 1.0 km10.5% from 1.0 km to 1.0 km10.5% from 1.0 km to 1.0 km11.1% from 1.0 km to 1.0 km14.0% from 1.0 km to 1.0 km9.3% from 1.0 km to 1.0 km10.0% from 1.0 km to 1.0 km11.8% from 1.0 km to 1.0 km22.2% from 1.0 km to 1.0 km5.6% from 1.0 km to 1.0 km11.8% from 1.0 km to 1.0 km0.0% from 1.0 km to 1.0 km12.5% from 1.0 km to 1.0 km17.6% from 1.0 km to 1.0 km13.3% from 1.0 km to 1.0 km13.3% from 1.0 km to 1.0 km18.8% from 1.0 km to 1.0 km11.8% from 1.0 km to 1.0 km25.0% from 1.0 km to 1.1 km12.5% from 1.1 km to 1.1 km25.0% from 1.1 km to 1.1 km12.5% from 1.1 km to 1.1 km12.9% from 1.1 km to 1.1 km25.0% from 1.1 km to 1.1 km12.5% from 1.1 km to 1.1 km16.7% from 1.1 km to 1.1 km20.0% from 1.1 km to 1.1 km8.7% from 1.1 km to 1.1 km13.6% from 1.1 km to 1.1 km9.1% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km13.6% from 1.1 km to 1.1 km4.7% from 1.1 km to 1.1 km9.5% from 1.1 km to 1.1 km10.0% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km11.8% from 1.1 km to 1.1 km0.0% from 1.1 km to 1.1 km11.1% from 1.1 km to 1.1 km5.7% from 1.1 km to 1.1 km11.4% from 1.1 km to 1.1 km11.1% from 1.1 km to 1.1 km21.1% from 1.1 km to 1.1 km15.8% from 1.1 km to 1.1 km10.5% from 1.1 km to 1.1 km10.0% from 1.1 km to 1.1 km9.8% from 1.1 km to 1.1 km9.5% from 1.1 km to 1.1 km20.0% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km5.4% from 1.1 km to 1.1 km5.3% from 1.1 km to 1.1 km6.1% from 1.1 km to 1.1 km16.7% from 1.1 km to 1.2 km16.2% from 1.2 km to 1.2 km14.6% from 1.2 km to 1.2 km16.2% from 1.2 km to 1.2 km16.7% from 1.2 km to 1.2 km5.7% from 1.2 km to 1.2 km12.1% from 1.2 km to 1.2 km5.9% from 1.2 km to 1.2 km16.7% from 1.2 km to 1.2 km10.0% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km20.0% from 1.2 km to 1.2 km30.8% from 1.2 km to 1.2 km11.8% from 1.2 km to 1.2 km18.2% from 1.2 km to 1.2 km40.0% from 1.2 km to 1.2 km44.4% from 1.2 km to 1.2 km35.3% from 1.2 km to 1.2 km22.2% from 1.2 km to 1.2 km20.0% from 1.2 km to 1.2 km22.2% from 1.2 km to 1.2 km6.2% from 1.2 km to 1.2 km6.5% from 1.2 km to 1.2 km6.1% from 1.2 km to 1.2 km0.0% from 1.2 km to 1.2 km6.2% from 1.2 km to 1.2 km11.8% from 1.2 km to 1.2 km11.8% from 1.2 km to 1.2 km23.5% from 1.2 km to 1.2 km25.0% from 1.2 km to 1.2 km13.3% from 1.2 km to 1.2 km20.0% from 1.2 km to 1.2 km13.3% from 1.2 km to 1.2 km25.8% from 1.2 km to 1.2 km21.6% from 1.2 km to 1.2 km17.6% from 1.2 km to 1.2 km17.6% from 1.2 km to 1.2 km11.1% from 1.2 km to 1.3 km20.5% from 1.3 km to 1.3 km20.0% from 1.3 km to 1.3 km11.8% from 1.3 km to 1.3 km24.2% from 1.3 km to 1.3 km12.9% from 1.3 km to 1.3 km12.9% from 1.3 km to 1.3 km20.0% from 1.3 km to 1.3 km23.5% from 1.3 km to 1.3 km23.5% from 1.3 km to 1.3 km21.6% from 1.3 km to 1.3 km17.1% from 1.3 km to 1.3 km21.1% from 1.3 km to 1.3 km11.8% from 1.3 km to 1.3 km17.6% from 1.3 km to 1.3 km11.4% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km5.3% from 1.3 km to 1.3 km5.6% from 1.3 km to 1.3 km11.1% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km12.5% from 1.3 km to 1.3 km11.8% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km11.1% from 1.3 km to 1.3 km11.8% from 1.3 km to 1.3 km11.8% from 1.3 km to 1.3 km15.4% from 1.3 km to 1.3 km7.5% from 1.3 km to 1.3 km9.5% from 1.3 km to 1.3 km9.3% from 1.3 km to 1.3 km9.5% from 1.3 km to 1.3 km0.0% from 1.3 km to 1.3 km5.7% from 1.3 km to 1.4 km11.1% from 1.4 km to 1.4 km9.5% from 1.4 km to 1.4 km16.7% from 1.4 km to 1.4 km8.9% from 1.4 km to 1.4 km18.2% from 1.4 km to 1.4 km9.5% from 1.4 km to 1.4 km9.8% from 1.4 km to 1.4 km9.1% from 1.4 km to 1.4 km8.7% from 1.4 km to 1.4 km3.5% from 1.4 km to 1.4 km8.5% from 1.4 km to 1.4 km9.8% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km10.0% from 1.4 km to 1.4 km4.9% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km10.0% from 1.4 km to 1.4 km13.6% from 1.4 km to 1.4 km9.3% from 1.4 km to 1.4 km8.3% from 1.4 km to 1.4 km9.1% from 1.4 km to 1.4 km9.5% from 1.4 km to 1.4 km-9.1% from 1.4 km to 1.4 km19.0% from 1.4 km to 1.4 km9.8% from 1.4 km to 1.4 km4.2% from 1.4 km to 1.4 km0.0% from 1.4 km to 1.4 km8.9% from 1.4 km to 1.4 km9.1% from 1.4 km to 1.5 km8.7% from 1.5 km to 1.5 km0.0% from 1.5 km to 1.5 km12.5% from 1.5 km to 1.5 km8.9% from 1.5 km to 1.5 km17.4% from 1.5 km to 1.5 km18.2% from 1.5 km to 1.5 km13.0% from 1.5 km to 1.5 km8.7% from 1.5 km to 1.5 km4.7% from 1.5 km to 1.5 km12.5% from 1.5 km to 1.5 km13.6% from 1.5 km to 1.5 km1%2%4%8%13%10%0 m250 m500 m750 m1 km1.3 km
Gradient key0-3%3-6%6-9%9-12%12-15%15%+

Climb Stats

Combined metric and imperial stats for quick route planning.

Climb categoryCategory 4
Distance1.5 km / 0.93 miles
Elevation gain93.6 m / 307 ft
Average gradient6.3%
Maximum gradient48.9%
Elevation high183.8 m / 603 ft
Elevation low89.4 m / 293 ft
Climb difficulty score9,359.33

Similar Climbs Nearby

If you like the shape of this climb, these nearby options have a similar distance, gradient, and elevation profile.

Tip: rotate your phone to landscape and swipe the table sideways to reveal the full set of climb details.

ClimbLengthGradientAscent
Behind Tank to Top CR
Green Point, Gosford
1.83 km6.6%121 m
Watertank to Top
Green Point, Gosford
1.25 km7.9%109 m
Sid Pulsford - Up
Green Point, Gosford
1.66 km7.8%151 m
Woorara concrete climb
Green Point, Gosford
1.1 km6%66 m
Beaties Rd Climb: the first peak
Green Point, Gosford
1.84 km7.4%137 m

Climb Rank

How does this climb compare against every other climb in the world?

🗺

This climb ranks 620,083rd out of 2,710,652 worldwide cycling climbs.

🧮

Ranked as the 14,912th most difficult cycling climb of all 97,639 climbs in Australia.

📉

Places 3,942nd out of 28,566 cycling climbs in New South Wales.

Ranks 102nd out of 532 cycling climbs in Gosford.

🏵️

A local climb of note, this is the 9th most difficult cycling climb (out of 31 climbs) in Green Point.

Useful Links

View this climb on other sites.

Google Street View
Strava